Welcome to the Park West & Cigar Factory bulletin board for landlords, tenants and agents providing up to date information on building issues.

Meter Readings

To request a meter reading, please fill in the form on your main entrance noticeboard. If your building does not have a noticeboard form, please use the Walton&Allen app or click here to request one via our website.

Refuse Collection

Bins are collected on Tuesdays. These are located in the ground and basement car parks. If you have larger items that cannot be disposed of in the bins please contact Nottingham City Council on 0115 9155555 to arrange a FREE collection.

Cleaners

Cleaners are on site Monday - Friday.

Other information

  • Fire Alarm Testing: A fire alarm test is carried out every week on a Friday. The testing should last approx. 30 minutes.
  • Anti-social behaviour: If notice any anti-social behaviour please report to Nottingham City Council 0115 915 2020.
  • Out of Hours Emergency Line: In the event of an emergency please call the office on 0115 924 3304/0115 924 1813 the answer phone message will give you the current emergency call out number. Please note: If the callout is deemed not to be an emergency or the fault of the tenant then you may incur a charge for the callout.

Notice Board

Keep up-to-date on all of the scheduled and adhoc maintenance at your building.

Fire Panel Test

A waltonandallen Maintenance Operative has attended site today and carried out the weekly Fire Panel Test

Fire Panel Test

A waltonandallen Maintenance Operative has attended site today and carried out the weekly Fire Panel Test

Caretaker on annual leave

Please be aware that the roaming caretaker is on annual for the w/c 11/09/2017. If you notice anything around your building please report this directly to the office.

Fire Panel Test

A waltonandallen Maintenance Operative has attended site today and carried out the weekly Fire Panel Test

fire Panel Test

WALTONANDALLEN’S maintenance operative attended site and carried out the weekly Fire Panel Test

Core 1 lift. Out of order Approx. 11:00am

Following our comment below the lift engineers have advised that they will be able to attend site tomorrow to further investigate the fault with this lift.

Core 1 lift – Out of order. Approx. 10:00am

We are aware that this lift is out of order, there appears to have been a call out at the weekend and the lift requires a second technician to attend. We have chased the engineers for an update.

Site Visit

Walton&Allen’s Block Management Administrator has attended site and completed a walk around inspection of the communal areas.

Second Half year advance demands

The 2nd half year advance demands have been sent in the post to all owners today.

2nd Half Year Demands

The advance demands for the 2nd half year Service Charge have been sent to all Leaseholders today.

Weekly Fire Panel Testing

Please be aware that the weekly fire panel test will now be completed on a Thursday.

Fire Panel Test

A WALTON&ALLEN maintenance operative will be on site today carrying out the weekly Fire Panel Test

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and completed the weekly fire panel test.

Stack Leak

Further to the below comments regarding the stack leak in Cigar Factory contractors have been on site today and completely flushed the stack so it is all flowing correctly and there are no more blockages.

Stack Leak

A WALTON&ALLEN maintenance operative has been on site today investigating and making repairs on  a stack leak in Cigar Factory

Blocked drains – The Cigar Factory

A member of the Walton&Allen Maintenance Team has attended site to investigate a blocked stack pipe that is affecting apartments in Cigar Factory. It appears that the blockage is towards the Main Drain. Drain Doctor have been instructed to clear the system.

Core 3 Painting

Please be aware that M scaffolding will be on site tomorrow 20th July at 10:30am to erect scaffolding for access to the wooden cladding on Core 3, this is estimated to take 2 days. Once in place a member of the Walton&Allen Maintenance Team will be on site to re-paint the cladding, this is estimated to take 5 days.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and completed the weekly fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and completed the weekly fire panel test.

Fire Safety

An Architect will be on site today doing a survey of the cladding

Lighting

Emergency lighting has been replaced throughout by WALTON&ALLEN’S maintenance team

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and completed the weekly fire panel test.

Core 1 – Communal door

Our security contractor has attended site and completed a repair to the communal door of Core 1. The door was left secure.

Roaming Caretaker Service

Please note that the Roaming Caretaker is on annual leave until Thursday 25th May. If you have any issues that you would like to report please contact the office directly.

Core 2 Lift – Trap in

We are aware that a resident has unfortunately been trapped in the lift this morning for a short period of time, luckily another resident on site called the lift from an alternate floor and this returned the lift to working order. It has been reported to the lift engineers who will be attending today to investigate why this fault happened.

Core 1 Lift

Following our comment on the 25th April a quote has been received from the lift engineers. This has been instructed and we are currently awaiting an attendance date. We have been advised that parts may take up to 15 days for delivery.

Fire Safety

MWE are on site today to complete the fire safety service visit in Park West and The Cigar Factory.

Core 1 Lift – Out of Order – approx. 11:50am

We are aware there is an issue with the Core 1 lift, this has been reported to the lift company who will attend as soon as possible.

Site Visit

Walton&Allen’s Property Manager has attended site and completed a walk around inspection of the communal areas.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and completed the weekly fire panel test.

Height Safety Systems

Following our comment below Omega, who have been instructed, have informed Walton&Allen that they have had a previously booked appointment cancel today and will attend Park West this afternoon.

Height safety systems

The annual maintenance visit for the height safety equipment has been instructed today, we are currently awaiting an attendance date.

Light Replacements

A member of the Walton&Allen Maintenance team has attended site today and replaced numerous emergency lights throughout the building.

Stair Tread – Cigar Factory

A member of the Walton&Allen Maintenance Team has attended site and carried out a repair to the broken stone stair tred.

Insurance Inspection

Walton&Allen’s Block Management Administrator has attended site  and carried out an insurance inspection with Axa.

Core 3 Lift. Approx 9:30am

We are aware that there is a fault with this after a resident contacted the ‘Out of Hours’ number. Our out of hours team reported the lift to our engineers at the time of the call.

The lift engineers have attended site this morning and returned the lift to full working order.

2017-2018 Service Charge Budget

The advance demands and budget have been sent to all Leaseholders today for the next Service Charge period 01.04.17-30.09.17

Core 2 Lift. Approx. 2:30pm

Following our comment below, the lift engineers have attended site and found a fault with a closer. This has been adjusted. The lift was tested and left in working order.

Fibreoptic Broadband

Following our comment on the 13st October 2016, the survey for Fibreoptic Broadband has been approved and MapGroup who work on behalf of BT Openreach who will be on W/c 6th March.

Core 2 Lift. Approx. 10:00am

We are aware that the doors are not opening on the 5th floor. We would advise that residents do not use the lift at this time. It has been reported to our lift engineers who will attend as soon as possible.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and completed the weekly fire panel test.

Site Visit

Walton&Allen’s Construction & Maintenance Director has attended site this morning to inspect the painting works being carried out on site.

Fire Panel Test

The fire panel tests will be carried out tomorrow, rather than today.

Fire System Contracts

Walton&Allen’s Property and Estate Director has been in correspondence with a fire contractor today in regards to the fire system contract for the building.

Pest Control Visit

The pest control contractors have attended site and carried out a routine service visit.

Core 3 Lift Service Visit

Our lift contractors have attended site today and carried out a routine service visit to the Core 3 Lift.

Core 2 Lift – Working. Approx. 2:00pm

Following our comments below the lift contractors have attended site and carried out the required repair to the lift. The lift was left in working order. Whilst on site they also carried out a routine service visit to this lift and the lift in Core 1.

Core 2 Lift – Out of order

Following our comment yesterday (26.01.17) our lift engineers have confirmed that they are still waiting for parts to be delivered to them from Italy and have confirmed that they will be fitted on receipt.

Core 2 Lift- Out of Order

Following our comment on the 23rd January, we have contact the lift engineers and chased them for an update for when this repair will be carried out.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an Emergency Light test and light bulb sweep of the communal areas.

External Painting & Cleaning

Following our comment on January 16th 2017, Building Transformations are on site this week to complete any snagging works.  Representatives will be attending site twice a day to monitor the works and progress.

Core 2 Lift – Out Of Order

Following our comment on the 19th January 2017, the lift engineers have not attended site due to the parts not being received, they will be fitted on receipt.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a walk around inspection.

Core 2 Lift – Out of Order. Approx. 2:00pm

Following our comment below we have contacted the lift engineers again for an update. They have confirmed that the parts have been ordered today and will be fitted on receipt. They are expecting the repair to be carried out on Monday 23rd January 2017.

Core 2 Lift – Out of order. Approx. 9:00am

Following our comment on the 16th January, Walton&Allen’s Block Management Administrator has contacted the lift engineers and chased them for an attendance date.

External Cleaning & Painting

Our contractors, Building Transformations, need to carry out snagging works for the cleaning & painting of the external render that was carried out last year.

The snagging work will be carried out by using powered access equipment and abseils between Monday January 23rd and Friday January 27th.

Please e aware when entering and exiting the building and if you have any valuable or breakable items on your balcony, please remove them for the duration of the works.

 

Core 2 Lift – Out of Order approx. 4:00pm

Following our comment below we have received and instructed the quote from the lift engineers. We will update this page once we have an attendance date.

Core 2 Lift – Out Of Order. Approx. 1:30pm

Following our comment below the lift engineers have attended site, unfortunately the lift has been left out of service and a quote will be provided to our office for the parts required.

Core 2 Lift – out of order. Approx. 9:30am

We are aware that this lift has not been working over the weekend. It has been reported to the lift engineers who will attend as soon as possible.

Fire Panel Test

A Walton&Allen Maintenance operative has attended site today and carried out a fire panel test.

Emergency Light Test & Sweep

A Walton&Allen Maintenance operative has attended site today and carried out an emergency light test and sweep of the communal areas.

Site Visit

Walton&Allen’s Property Manager has attended site today and carried out a walk around inspection.

Fire Panel Tests

A Walton&Allen Maintenance operative has attended site today and carried out the weekly fire panel tests.

Core 3 Lift – Working – Approx. 1:15pm

Following our comment below, a lift engineer has attended site today and carried out a repair to return the lift to normal working service.

Core 3 Lift – Out of Order – Approx. 2:05pm

We are aware that the core 3 lift is stuck on floor -1. This has been reported to our lift engineers who will attend as soon as possible.

Salt/Grit within the Communal Areas

We would like to politely remind all residents that the responsibility for salting/gritting the communal areas is the responsibility of the residents. Please note; even if salt/grit has been provided by the management company, Walton&Allen or the management company take no responsibility for salting/gritting the communal areas.

Pedestrian Gate

A new keypad has been fitted to the pedestrian gate. A replacement was fitted on 9th March 2016 and this is a replacement covered by the warranty.

Upper Entry Shutter – Working

Our security contractor is on site today fitting a new motor to the upper entry shutter.

We apologise for the delay in completing this repair and thank the residents for their patience.

Courtyard Lights

Amptron Electrical Services have attended site today and fitted external wall mounted lights in the courtyard area.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out the weekly fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the weekly fire panel test.

Changes to Christmas and New Year Bin Collections

Please see below a letter from Nottingham City Council advising of any changes to the bin collections at Park West.

changes-to-christmas-and-new-year-bin-collections-20162017

Lift Service

Express Lifts have attended site and carried out a routine service visit to the lifts.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the weekly fire panel test.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an emergency light test.

Repair Visit

A member of the Walton&Allen Maintenace Team has attended site to repair a leaking pipe in car park, whilst on site they also cleaned some of the drains located around the car park floor. The rest of the cleaning will be picked up by Roaming Caretaker who attends.

Water Disruption – Park West

We are aware that there is currently residents without water at Park West.

There is currently a repair being carried out by our contractors, unfortunately there has been a delay with the repair and the water will be re-connected as soon as possible.

Service Charges – Arrears

Any Leaseholders whose service charge accounts that are in arrears have been sent to Solicitors today by Walton&Allen’s Credit Controller.

Site Visit

Walton&Allen’s Property Manager and Block Management Administrator have attended site and carried out a walk around inspection.

External Cleaning and Painting

We have been advised by Building Transformations that the external cleaning and painting should be completed w/e 21.10.16.

Service Charges – 1st Reminders

WALTON&ALLEN’s Credit Controller has sent the service charges first reminders to the leaseholders today.

Missed bin collection

We aware the bins located in the Upper Car Park have not been emptied this morning. NCC have advised that a re-collection will be arranged for this week.

Fibre Optic Broadband

MapGroup who work on behalf of BT Openreach have attended site and carried out a survey of the building to see if Fibreoptic broadband can be installed.

Sterilizing Services

Sterilizing Services will be on-site today to carry out the water tank checks and the booster pump servicing.

External cleaning and Painting

Water Issue to Cigar Factory Residents. Approx. 11:00am

Following our comments below our water services engineer have advised that a fault has been found with the booster pumps on the water tanks. A temporary repair has been carried out a full repair will be completed Monday 10th October along with the service visit.

Water Issue to Cigar Factory Residents. Approx. 10:15am

Following our comment below, our water services engineer has collected the required access keys/fobs from our office and is on their way to site. They will provide us with an update once they know more.

Water Issue to Cigar Factory Residents. approx. 9:00am

Unfortunately yesterday (Sunday 02.10.16) approx. midday there was a loss of water to cigar factory residents due to an issue with the water pumps. Our out of hours contractors attended site approx. 2pm and resolved the issue returning water to Cigar Factory. We are aware by kind reports from Residents that unfortunately from approx. 8:00am this morning, the issue has re-occurred. Walton&Allen’s Trainee Property Manager has contacted our contracted water services contractors to report and someone will be in attendance this morning.

External Cleaning and Painting

Following our comment on the 19th September, we have received an update from Building Transformation who are carrying out the works.

By the end of play today all painting will be complete on Hermon Street and Elliott Street.  This afternoon they will have moved onto Ilkeston Road elevation and the rope team plus one team will continue in the Courtyard.

Can we please advise residents to remove any items stored on their balcony in order for these works to progress.

External Cleaning and Painting

Walton&Allen’s Maintenance Director has attended site today to asses the progress of the external cleaning and painting works.

The contractors have advised that they have 1 day left of work on Elliot Street. They will be Working on Herman Street elevation and in the Courtyard for the remainder of this week

Works will commence on Ilkeston Road w/c 26th September 2016.

20160919_163123 20160919_163316

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

External Cleaning and Painting

Following our comment on 09.09.16, Walton&Allen’s Maintenance Director has attended site today to assess to progress of the external cleaning and painting works.

20160915_104207 20160915_104210

Fire Panel

PLP are attending site today to fit a part required to resolve the issue on the panel in Core 3

Core 3 Lift – Working – approx. 2:45pm

Following our comment below, the lift appears to have reset and has returned to normal working service.

Core 3 Lift – Out of Order – approx. 2:25pm

We are aware that the Core 3 lift is currently out of order. This has been reported to our lift engineers who will attend as soon as possible.

New Property Manager

Walton&Allen’s Property & Estate Director has attended site with Walton&Allen’s new property manager to familiarise them with the building.

External Cleaning and Painting

Following our comment on 08.09.16, the contractors have confirmed that all of the cleaning that can be reached from the towers and MEWPs has been completed. The remaining cleaning will be carried out by the rope access operatives.

The painting on the Elliott Street elevation and Hermon Street has now commenced and we have been informed that the paint is applying well and the first coat is producing a great impact.

Next week the contractors will continue with the painting across all elevations, when the rope access operatives arrive on Tuesday they will clean down their areas and start painting too.

The works are currently being completed to schedule and advancing smoothly without disruption.

External Cleaning and Painting

Following our comment on 07.09.16, we would like to make residents aware that there there is likely to be water on the floor of the car park whilst the cleaning and painting of the external areas is being carried out. The contractors are working hard to try and sweep away as much water as possible, therefore please take care when walking on the wet floor. Warning signs have been put up around the affected areas.

Lift Service

An engineer from Express Lifts have attended site today and carried out a service to all 3 of the lifts on site.

External Cleaning and Painting

Following our comment on 25.08.16, the external cleaning has now started on-site and many areas have been completed – Hermon Street, Elliot Street and most of Ilkeston Road. The scaffold towers are now being set up in the courtyard and the cleaning on Ilkeston Road and the courtyard will continue for the rest of the week. The contractors are scheduled to start painting in some areas towards the end of this week (Thursday/Friday) and will probably commence on Hermon Street. Please note the contractors will commence at approx. 9:00am on each day.

Sky Q

Following our comment on 01.09.16, AVUK will be returning to site today and tomorrow, Tuesday 06.09.16, to continue the free enhancement of Sky Q to the Cigar Factory building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Door Repair

A security contractor has attended site today to carry out a repair to the Core 2 courtyard door to improve the security of the door.

Sky Q

Following our comment dated 31.08.16, AVUK will be on site today to carry out the free Sky Q enhancement to the Cigar Factory building.

Sky Q

Following our comment on 25.08.16, the date for the free Sky Q enhancement for the building has been bought forward, meaning AVUK will be on site from Thursday 01.09.16 to carry out the free Sky Q enhancement to the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

External Cleaning and Painting

Following our comment on 24.08.16, Walton&Allen’s Construction and Maintenance Team have met with the paint manufacturer’s representative today at 10am to colour match the existing render to get as nearest match as possible to the colour the original render would have been. We have received a sample of the paint today and have been on site painting three areas.  The areas chosen were one which was in the shade, one which was semi-exposed and one in sunlight. The paint system used is manufactured by a German company and is to the latest technology. The paint is a pigmented silicone resin emulsion paint, the coating contains a film preservative to protect the surface at risk of infestation with alga or fungi. The characteristics of the paint is that it is used as a water repelling, highly water vapour permeable protective coating for cementitious building materials. The building will be pressured washed down prior to the application of the 2 coats of the paint.

Please see the pictures below of what the finished building will look like.

Sample 1 Sample 2 Sample 3

Sky Q

AVUK will be on-site from Monday 12.09.16 until Wednesday 14.09.16 to carry out the free Sky Q enhancement to the building.

Meeting with Landscape Gardener

Walton&Allen’s Property and Estate Director has attended site today and met with a landscape gardener on site to look at ways of improving the plantations in courtyard.

External Cleaning and Painting

Following our comment on 19.08.16, the Section 20 painting of the render on site will commence on Thursday 01.09.16 with the site setup, and the works will commence on Friday 02.09.16.  These works will be carried out by Building Transformations and are expected to last for approx. 8 weeks depending on the weather. There was also a letter drop yesterday to all the apartments regarding the painting and cleaning works, advising the dates the works will be carried out and that the dates are subject to change, however we will notify residents of any changes via this page.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

External Cleaning and Painting

The following letter has been sent to all leaseholders and residents today:

To maintain the standard of Park West it has been highlighted that external decorative works are required to the buildings. These works are intended so that the overall aesthetics and future maintenance costs are reduced in the long term.

Therefore we intended to carry out cleaning & painting of the external render and washing down of balconies and balcony doors by our contractors Building Transformations.   The work will be carried out by using powered access equipment and abseilers between Thursday 1st September and Monday 24th October. 

The following dates are scheduled for each elevation, please can you ensure all balconies are cleared to allow the abseilers to carry out their works.  There is a copy of the programme in the link below and as with any project and particularly large projects like this, it is possible that this will change.  Any changes that we do make will always be communicated to you in advance via the Walton & Allen website.  

Set up                                   Thu 01/09/16    

Hermon Street                  Fri 02/09/16        to            Mon 12/09/16

Elliot Street                         Tue 06/09/16     to            Thu 08/09/16

Ilkeston Road                    Tue 13/09/16     to            Wed 21/09/16

Courtyard                            Thu 22/09/16     to            Mon 10/10/16

Snagging                              Tue 11/10/16     to            Mon 24/10/16

 

The schedule of works is included in the link below:

PWCF – 16 08 19

Smart Meter Upgrade

Siemens will be attending site today to upgrade 2 landlord supply meters to smart meters. Please note the power in communal areas will be down for approx. 30 minutes.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

BT Survey

BT are going to be attending site and carrying out free surveys to determine whether it is eligible for free super fast BT broadband upgrades. We are currently awaiting a date that BT will be attending and will updated this page once this information has been received.

Pest Control

The contracted pest controllers have attended site today as part of a routine visit.

Service Charges – Advanced Demands

Walton&Allen’s Credit Controller has sent the Service Charges Advanced Demands to all leaseholders  today.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Upper Exit Car Park Shutter

Following a report that the upper exit shutter was not closing, the gate contractor attended site on the same day to resolve the issue.

Redecoration of Externals

Walton&Allen’s Construction Director and Planner has met Contractors on site to carry out preparation work for the painting of the externals of the building planned for September.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Smart Meter Upgrade

Siemens will be attending site on Friday 19.08.16 to upgrade the current landlord supply 1 and landlord supply 3 meters to smart meters. Please note, power within the communal areas will be down for approx. 30 mins whilst this is being carried out.

 

Fire Panel Test

A member of the Walton&Allen’s Maintenance team has attended site today and carried out a fire panel test.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance team has attended site today and carried out an emergency light test and sweep of the communal areas.

Jet Washing of Paving

A member of the Walton&Allen Maintenance team has been attended site everyday this week to carry out the jet washing of the paving.

WP_20160627_15_08_28_Pro WP_20160628_10_57_50_Pro WP_20160628_12_38_48_Pro

WP_20160628_12_39_01_Pro WP_20160628_16_20_27_Pro WP_20160629_14_42_03_Pro

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Weeding

A member of the Walton&Allen Maintenance team has attended site today to carry out the weeding of both the Park West and Cigar Factory courtyards in preparation for the pressure washing of these areas.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test today rather than tomorrow when it would normally be tested.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Site Visit & Caretaker 1 to 1

Walton&Allen’s Property and Estate Director and Block Management Administrator have attended site today with the Roaming caretaker to carry out a site visit 1 to 1 meeting with the roaming caretaker of the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Lift Service

The lift company have attended site today and carried out a service visit to all 3 lifts.

Lower Car Park Shutter

The lower car park entrance shutter safety cells have been upgraded today.

Emergency Light Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Cleaning of Car Park

Walton&Allen’s Roaming caretaker has attended site today as per their usual rota and concentrated on cleaning the badly affected car park surface areas.

WP_20160518_11_44_38_Pro WP_20160518_11_48_23_Pro

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the weekly fire panel test.

Water Tank Clean & Disinfection

Following our comment on 14.04.16, Sterilizing Services will be attending site today to carry out the cleaning and disinfection of the water tank.

Replacement Lights

A member of the Walton&Allen Maintenance team has attended site today and replaced various required lights throughout the communal areas of the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Water Pump

Sterilizing Services have attended site today and replaced 2 expansion vessels for the water pumps.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Water Tank Clean & Disinfection

Sterilizing Services will be attending site on Thursday 05.05.16 to clean and disinfect the cold water tank. We have been informed that there should not be any disruption to the water services.

Light Bulbs

A member of the Walton&Allen Maintenance Team has attended site today to replace the light bulb in Core 1 on the top floor.

Mansafe Test

Omega are due on-site today to carry out the mansafe test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Water Tank & Pump

Sterilizing Services are due on site toady to carry out the water tank and water pump checks.

Cleaning of Car Park Floor

The Roaming Caretaker has attended site today to carry out the daily duties. The car park floor was also cleaned on this visit.

PW cp before PW before 2

PW cp after PW cp after 2

Water Pump Repair

Following our comment on 22.03.16, the Sterilizing Services pump engineer has attended site today and fitted the new replacement pumps as required.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the fire panel test a day early due to our office being shut on Friday 25th March for Good Friday.

Please contact the office in the event of an emergency and the voicemail will supply you with the current out of hours contact number.

Lightning protection test

Omega are due on-site today to carry out the annual lightning protection test.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an emergency light test and light bulb sweep of the communal areas.

Water Tank

Following our comment on the 18th March our pump engineer has attended site to look at the possible pump leak issue. It has been confirmed that one set of the pumps is leaking and beyond repair . The required replacement parts have been ordered.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Water Tank

Following our comment below, Sterilizing Services will be attending site today to check a suspected leak from the water tank.

Water Tank

Sterilizing Services will be attending site tomorrow, Friday 18.03.16, to check a suspected leak from the water tank.

Lightning Protection Test

Omega will be attending site on Wednesday 23.03.16 to carry out a Lightning Protection Test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Pedestrian Gate

Following our comment on 18.02.16, our gate and security engineer has attended site today and fitted the new keypad that was required for the pedestrian gate. Residents can use this gate as normal.

Service Charges

The 2016 – 2017 service charges have been sent to all leaseholders today.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Site Visit

A member of the Walton&Allen Maintenance Team has attended site today and cleared out a blocked hopper on the drain pipe.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Emergency Light

A member of the Walton&Allen Maintenance Team has attended site today and replaced the failed emergency light.

PLP Fire

PLP Fire will be attending site today to carry out the FEB services.

New Roaming Caretaker

A member of the Walton&Allen Block Management team has attended site today with the new roaming caretaker to carry out a walk around inspection and to familiarise the caretaker with the building. The daily duties to be carried out at the building were also explained on this visit.

 

Repair to Light

A member of the Walton&Allen Maintenance Team has attended site today to repair a light within the communal area of the building.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Gutter Clearing

A member of the Walton&Allen maintenance team has attended site today to clear the gutters.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Pedestrian Gate – approx. 1:50pm

Following our comment below, a new keypad is required for the pedestrian gate. Our gate and security engineer has attended site today and fitted a temporary keypad to be used while we await quotes for a new keypad and until this has been fitted. Residents can now use this gate as normal.

Pedestrian Gate Out of Order – approx. 2:30pm

Unfortunately the pedestrian gate (on the cobbled road opposite the police station) is out of order while we await parts. In the meantime you can access the courtyard via the other pedestrian gate on Derby Road. We apologise for any inconvenience this may cause.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Site Visit

A member of the Walton&Allen Maintenance Team has attended site today and tidied the bin areas. Any excess waste from around the bin area was also removed.

Email System Back Up & Running

Following our comment below, we can confirm that the Walton&Allen email system is now up and running. We apologise for any inconvenience caused.

Email System Down approx 11:15am

The Walton&Allen email system is currently down until further notice. Our IT providers are currently working to resolve the issue. Please call the office on 0115 924 3304 if your query is urgent.

Lower Entrance Roller Shutter

The contractor has attended site today and replaced a required part to hopefully resolve the recent breakdowns of the lower entrance roller shutter.

Debris

A member of the Walton@Allen Maintenance Team attended site today and cleared away large items and litter from the car park/bin area.

Fire Panel Test

A member of the Walton&Allen Maintenance Team attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

 

Fire Panel Test

A member of the Walton & Allen maintenance team has attended site on 29.12.15 & carried out a fire panel test.

Fire Officer Appointment

Walton&Allen’s Property and Estate Director has met with the fire brigade to carry out a proactive review in order to help them improve their procedures in the event of an emergency.

Core 2 Lift OUT OF ORDER. Approx. 10:00am

We are aware that this lift is currently out of order and stuck on the 6th floor. We have reported this to our lift engineers who will attend as soon as possible.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Light Test

A member of the Walton&Allen Maintenance team has attended site and carried out an emergency light test and light bulb sweep of the communal areas.

Salt/Grit

A Walton&Allen operative has attended site today and filled the grit bin(s) on site.

Please note it is responsibility of residents to distribute where necessary.

Steel Supports – Car Park

Following our comment on the 13th November, a member of the Walton&Allen Maintenance Team has been on site completing the works to the steel supports in the car park.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Steel Supports – Car Park

Walton&Allen’s Trainee Property Manager and our Maintenance & Contracts Manager has attended site to inspect the recent painting to the steel supports in both car parks. The job is not complete and we are awaiting a date that someone can attend.

Core 1 Lift Approx. 10:30am

Our lift engineers have attended site today and resolved s door issue with the Core 1 lift. They have also serviced all three lifts.

Site Visit

A member of the Walton&Allen Block Management Team has attended site today and carried out a walk around with the new roaming caretaker.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Steel Supports – Car Park

A member of the Walton&Allen maintenance team is due on site today to paint the steel supports in the car park with yellow hammerite to make them more visible for drivers.

Water tank check

Sterilizing Services are due on site today to carry out a service visit to the water tank/pump.

Light Test

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Final Reminders – Service Charge

Final reminders have been sent in the post today to leaseholders who have not paid or made a contribution towards their service charge & those who have not made contact with Walton&Allen to discuss payment plans.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Core 1 Lift – WORKING approx. 4:30pm

Following our comment below, our lift engineers have attended site and returned the lift to full working order.

Core 1 Lift – OUT OF ORDER approx. 1:30pm

Following our comment on the 1st October, the required parts have been delivered and the engineers are on their way to carry out the repair.

NEW APP!

Check out our new free App!

Keep updated as to what’s happening at your building through this Notice Board. The App has many features, including Sat Nav to help people find your building. Whether it be friends, family or delivery companies, all can download the App to their smartphone or tablet – and it’s completely free.

Simply go to www.waltonandallenapp.co.uk and download it.

 

app app2 app3 app4

Site Inspection

Walton&Allen’s Property and Estate Director has attended site and carried out a walk around inspection with the Director of Park West and Cigar Factory RTM.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Emergency Light Test

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Dumped Items

Our contractors City & Country have attended site today and removed any dumped items left near the bin area(s).

Site Visit

A member of the Block Management Team has attended site today to carry out a walk around inspection.

Core 1 Lift – OUT OF ORDER approx. 3:00pm

Following our comments below we have instructed the quote for the lift engineers to repair the core 1 lift. Parts are required and once they are delivered they will attend site asap.

Litter Pick

A member of the Walton&Allen maintenance team has attended site and carried out litter pick. They have also cleared the substation roof that can be seen from Core 2, from any litter. 20151001_122816

Core 1 Door

Our security contractor has attended site today and carried out a repair to the Core 1 Door.

The door was left in full working order. Residents will need to input the code to enter the block and use the green ‘push to exit’ button when leaving the building.

Core 1 Lift OUT OF ORDER approx. 2:00pm

We are aware this lift is currently out of order and stuck on the 2nd floor. We have reported this to our lift engineers who will attend asap

Service visit

Our fire contractors PLP are due on site today to carry out a routine service visit.

Core 1 Lift – OUT OF ORDER Approx. 4:15pm

Following our comment below, our engineers have attended. The lift will remain isolated as parts are required.

Service charge

Don’t forget your service charges are due on the 1st October 2015. It is very important these are paid on time so the maintenance, repairs and improvements can be funded to the building.

Please call 0115 924 3304 or email info@waltonandallen.co.uk. Alternatively we can offer you standing order payment plans for your service charges to spread the cost

Site Inspection

A member of the Walton&Allen Block Management Team have attended site today and carried out a walk around inspection.

Upper Car Park Bins

We are aware that the bins in the upper car park have not been emptied. This has been reported to our contact at NCC.

Fire panel test

A member of the Walton&Allen maintenance team has attended site today to carry out a weekly fire panel test.

Core 3 Lift

We are aware that this lift is not opening on the 1st floor. This has been reported to the lift engineers and they will attend asap.

Upper car park, entry roller shutter.

Our security contractor has attended site following a resident kindly reporting the upper car park entry roller shutter was stuck in the open position. They have returned the shutter to full working order.

Fire panel test

A member of the Walton&Allen maintenance team has attended site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a routine fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Core 3 lift – OUT OF ORDER Approx. 9:45am

We are aware that this lift is out of order and stuck on the first floor. This has been reported to our lift engineers who will attend asap.

Fire Panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Lower Car Park Exit Shutter

Our security contractor has attended site and re-aligned the safety sensors to the roller shutter. The shutter was left in full working order.

Please contact Walton & Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

Fire panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Light Test

A member of Walton&Allen Maintenance team is due on-site today to carry out an Emergency light test and light bulb sweep of the communal areas.

Light Sweep

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen team has attended site today and carried out a fire panel test.

Core 2 lift doors

Following our comment below the lift engineers have attended site and resolved the issue with the lift doors.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Core 2 Lift doors.

Following a recent report that the lift doors fail to open on the 3rd  floor in core 2 we have reported this to our lift engineers and requested that they attend site on Monday and investigate this issue.

 

 

Upper Car Park Exit Car Park shutter – WORKING

Following our comment below the major repair has been successfully carried out and the roller shutter has been left in full working order.

Upper car park exit shutter

Following our comment on the 8th July, our contractor has received the required parts for the repair on the upper car park exit shutter. They will be attending site on Wednesday 29th July, Thursday 30th July and Friday 31st July 2015. Vehicles parked in spaces 1, 2 & 3 in the upper car park will need to find alternative parking during 9:00am and 5:00pm on these days.

We apologise for any inconvenience this may cause but would like to thank you for your patience whilst this major repair is carried out.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

lift Inspection

Zurich have attended site today to carry out an inspection on the lift’s for insurance purposes.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Upper Car Park Exit Shutter

We have now received a quote to repair the upper car park exit shutter, this has been instructed and are awaiting a delivery date for the required parts.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Light Test

A member of Walton&Allen Maintenance team is due on-site today to carry out an Emergency light test and light bulb sweep of the communal areas.

Refuse collection

Following our comment below we have been informed by the Nottingham City Council that the bin crew have returned today and emptied the bins located in the upper car park and removed any waste by the side of the bins.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Refuse collection

We are aware that the bins located in the upper car park have not been emptied. We have contacted the council and reported this to time. they have replied saying they are unable to maneuver their vehicle around the road works that are currently present. The crew will be returning on Saturday to empty the bins.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Tests

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Lift Service

Our lift contractors have attended site and carried out a routine service visit on all the lifts.

Please contact Walton&Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

  • - message archive

     8th May 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    1st May 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    29th April 2015 – Secruity Improvement

    To further improve the security to the building a member of the W&A maintenance team has been on site to carry out lighting improvements to the car park for further preventative security measures.

    Please click the below link to see these improvements.

    files/Park West CP lighting Improvements 29.04.15.pdf

     

    24th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    23rd April 2015 – A member of the W&A maintenance team has attended site today and replaced any required  lights in the Lower Car Park where accessible.

    21st April 2015 Sterilizing Services have attended site today and carried out a water tank and water pump inspection.

    17th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    14th April 2015 Approx. 4:30pm – Core Lift WORKING

    Following our comment below our lift engineers have attended site and returned the lift to working order. Unfortunately the doors had been vandalised.

    14th April 2015 Approx. 1pm – Core 3 Lift OUT OF ORDER

    We are aware that this lift is out of order and stuck on the top floor with the doors constantly opening/closing.

    We have reported this to our lift engineers who will attend ASAP.

    10th April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    8th April 2015 – Lift Lights

    A W&A operative is due on-site today to replace lift lighting as required.

    7th April 2015 – A W&A operative has attended site today and carried out a litter pick of the site and a light sweep in the lifts.

    2nd April 2015 – A member of the W&A maintenance team has attended site today and replaced the door handle on the Core 1 door from the Lower Car Park and Core 2 door from the Upper Car Park.

    2nd April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    25th March 2015 Approx. 10am – Core 3 Lift WORKING

    Our lift engineers have attended site and returned the lift to working order. The break down was caused by vandalism.

    24th March 2015 – Core 3 lift OUT OF ORDER

    We are aware that this lift is currently out of order. We have reported this to our engineers who will attend asap.

    20th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    16th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel Test

    12th March 2015 – Upper Car Park Entrance Shutter

    Following the unfortunate vandalism, our gate contractor has been on-site today and carried out all of the required repairs to this shutter.

    6th March 2015 A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    5th March 2014

    Our cleaners have a found a wallet today within the Car Park. This has now been handed in to the local police station.

    3rd March 2015 – Bulky Waste Disposal

    May we remind residents to not abandon large/furniture items in the underground car park. Not only is this causing issues with items being placed in peoples parking spaces but these items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    27th February 2015 A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    25th February 2015 – Our fire contractors are due on site today to carry out a routine maintenance service visit.

    23rd February 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    20th February 2015 – A member of W&A maintenance team is due on-site Monday 23rd February 2015 to carry out a Fire Panel test.

    13th February 2015 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test

    6th February 2015 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    30th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    29th January 2015 – Bulky Items

    May we remind residents to not abandon large/furniture items in the underground car park. Not only is this causing issues with items being placed in peoples parking spaces but these items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    29th January 2015 A member of W&A maintenance team has attended site today and:

    • Carried out an emergency light test in both blocks.
    • Carried out a light bulb sweep of the communal areas of both blocks.
    • Weeded the Cigar Factory courtyard.
    • Removed dumped bulky furniture items from the car park. – May we remind/ask residents to kindly contact Nottingham City Council to arrange them to collect these items for FREE.

     

    26th January 2015 Approx. 2pm A member of our maintenance team has attended site and fixed the Core 1 courtyard entrance door following the unfortunate vandalism over the weekend.

    16th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    9th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th January 2015 If you have any building concerns or issues that you would like to discuss or report, Please contact Walton and Allen on 0115 924 3304.

    2nd December 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    23rd December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    18th December 2014 Approx. 2:20pm – Refuse Collection

    Following our comments below the bins within the lower car park have now been emptied.

    16th December 2014 – Refuse collection

    Following our comment on the 11th December 2014, we have chased the council and they have arranged for the refuse team to return tomorrow and empty the bins in the lower carpark.

    15th December 2014 – Core 3 Lift WORKING

    As far as we are aware the lift is in full working order.

    12th December 2014 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test

    11th December 2014 – Refuse collection

    Our roaming caretaker has attended site today and reported that the bins in the Lower Car Park have not been emptied. We have reported this to the Nottingham City Council and emailed the supervisor. We have been supplied the reference: 997589. We have asked that the refuse team return and empty the bins as soon as possible.

    5th December 2014 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    28th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

     

    25th November 2014 – Core 3 Lift

    Following our comment on 20/11/14, the lift manufacturers are due on-site today to fit the further required part.

    24th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

    20th November 2014 – Core 3 Lift

    Following our comment on 14/11/2014, the lift manufacturers have ordered a further required part for this repair. We do not have an ETA for this part and their attendance at this moment.

    18th November 2014 – Lower Car Park Bins

    We are aware that the lower car park bins have not been emptied today. We have contacted Nottingham City Council about this issue.

    18th November 2014 – Core 3 Courtyard Door

    Following our comment on 6th November 2014, unfortunately someone had tampered with the Core 3 Courtyard Door again causing it to stay open. Our security contractor has been on-site today and resolved this problem. This door is now secure again.

    18th November 2014 Approx. 11am – Our security contractor is on-site looking at possible improvements to the car park door handles.

     

    14th November 2014 – Core 3 Lift

    Following our comment on 11.11.14, the lift manufacturers are on-site this afternoon starting the repair to this lift.

     

    14th November 2014 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th November 2014 A member of W&A Maintenance team is due on-site today to carry out an emergency light test and a light bulb sweep of the communal areas.

    12th November 2014

    A member of W&A Maintenance team has attended Park West today and carried out an emergency light test & light bulb sweep of the communal areas.

    11th November 2014 – Core 3 Lift

    Following our comment below, we have today instructed the repair to this lift. Due to the amount of parts that are required, we do not have an ETA for these parts as of yet.

    7th November 2014 – Core 3 Lift

    Following the continious breakdowns and problems with this lift, we have had no other choice than to arrange the lift manufacturers to attend site to quote for resolving this issue. This lift company is due on-site today.

    7th November 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    6th November 2014 Approx. 4pm – Security/Courtyard Doors

    Our Security contractor has attended site and fixed all 3 courtyard doors following the unfortunate vandalism. As of today, all 3 courtyard doors are in full working order.

     

    5th November 2014 – Security/CCTV

    A member of W&A Maintenance team has attended site today and fitted CCTV cameras around the building.

     

    31st October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    28th October 2014 We have found a pair of sunglasses in the car park. If you believe that these are your sunglasses, please contact us on 0115 9243304 providing a detailed description of them.

    28th October 2014 – Core 3 Lift

    Following our comment below, our lift company have arranged for an engineer to attend site this afternoon.

    24th October 2014 – Core 3 Lift OUT OF ORDER

    We are aware that this lift is out of order. Our lift company is arranging a lift technician to attend site ASAP.

    24th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    20th October 2014 Following our comment below, a member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    17th October 2014 The fire panel test will be carried out on Monday 20th October instead of today.

     

    16th October 2014 Approx. 10:30am – Core 3 Lift

    Following our comment on 14.10.14, a Lift Technician is on their way to site.

    16th October 2014 – Park West Fire System

    Following our comment on the 13/10/2014, the new fire system was successfully finalised and installed yesterday (Wednesday 15/10/2014).

    15th October 2014 – The 1st reminders have been sent out to any Leaseholders who have not yet been in contact with us or paid the Service Charge that was due on 1st October 2014 for the 2nd Half year (1st October 2014 – 31st March 2015).

    14th October 2014 – Core 3 Lift

    Following our comment on 10.10.14, a lift engineer is due on-site today to look at this lift following information provided by the lift technician.

    13th October 2014 – Park West Fire System

    Our Fire contractors are on-site today, tomorrow & Wednesday 15.10.14 fitting a brand new fire system to Park West to further improve the safety of the building.

    10th October 2014 – Core 3 Lift

    Following our comment on 2nd October, we have been informed that this lift is being temperamental. We are awaiting advice and a report from the lift technician’s visit.

    10th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    8th October 2014 Our security contractor has been on-site this morning along with a member of our maintenance team and fixed the Park West Core 3 Courtyard door.

    8th October 2014 Sterilizing Services are due on-site today to complete their contracted water tank check.

    3rd October 2014 The following notice has been hand delivered to ALL residents today:

     

    Fire Alarm

    On the 13th October 2014 a new fire system is being installed at Park West.

    In the meantime, can residents please STOP silencing the fire panel when the fire alarm sounds. If the fire alarm sounds, please follow the fire instructions outlined around the building.

    If we catch or can prove who is silencing the fire panel, we will Fine them £2,500.

    Reducing Crime

    May we ask that residents STOP dumping expensive items in the bins and car park areas. Please dispose of these items another way as these items are luring undesirables into the car park.

    Please DO NOT leave any valuables on show in your car. This includes in the front, rear and boot of your car. If you use a satnav, we also recommend that you wipe your windscreen to remove any signs that this type of equipment is stored in your car. This recommendation has come directly from the Police.

    Security

    If we see or find evidence of people tampering with door or gate systems, we will Fine them £1,000. We are currently studying the CCTV to find any evidence of this. This behaviour is directly leading to undesirables entering the building.

    Using items as door stops on security doors is directly undermining any security improvements we have made to the building so please STOP. Any information we have that can identify the individuals doing this, we will Fine them £200.

    We all have to work together to reduce the risk of crime. Residents are also responsible for the security to the building and car park.

    If you see any suspicious behaviour, please report this to the Police on the number 101.

    3rd October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    2nd October 2014 – Core 3 Lift

    Following our comment below, a lift technician is due on-site today to investigate the continuous breakdowns further.

     

    1st October 2014 – Core 3 Lift WORKING

    Following our comment below, the lift is back in working order.

    Notice to Residents:

    Please restrain from holding the lift doors open while moving in and out of the block

    This is the cause for the continuous breakdowns

    Please have consideration for other residents in the Block

    1st October 2014 The second half year (1st October 2014 – 31st March 2015) Service Charge is due today.

     

    1st October 2014 A member of W&A Maintenance team is due on-site today to carry out an emergency light test and light sweep of the communal areas.

     

    1st October 2014 Approx. 11:30am – Core 3 Lift OUT OF ORDER

    Following our comment below, our lift engineers were on-site yesterday afternoon and returned the lift to working order however the lift did not provide a fault code to why this lift had gone down.

    We have just been informed by a resident that this lift has gone down again with the same fault. We have reported this to our lift engineers Manager and are currently awaiting their advice on this matter.

    30th September 2014 – Core 3 Lift OUT OF ORDER

    We are aware that this lift is unfortunately out of order. We have reported this to our lift engineers who will hopefully be attending today.

     

    30th September 2014 Approx. 1:30pm – Refuse Collection

    Following our comment below, the bins have now been emptied.

    A Manager at the Council has apologised for the delay and explained that the refuse van was in the garage due to a break down.

    30th September 2014 Approx. 11:30am – Refuse Collection

    We are aware that the Council have now not emptied the bins for 2 weeks. We have contacted the Council again and have been provided the reference number 980 602 for our call. We have also emailed a Manager at the Council to stress the urgency of these bins being emptied this week.

    26th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    25th September 2014 Our glazing company has been on-site this morning and re-glazed the vision panel on the Core 1 upper car park door following the unfortunate vandalism.

    24th September 2014 W&A Block Manager is on-site this morning reviewing possible security improvements.

    20th September 2014 Approx. 3:45pm – Core 3 Lift

    Following our comment below, our lift engineer has attended site and resolved the lift issue which was caused by Misuse. The lift was left in working order.

     

    20th September 2014 – Core 3 Lift

    We are aware that this lift has unfortunately gone down. We have reported this to our lift engineers and asked that they attend today.

    19th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    16th September 2014 W&A’s Block Manager is meeting a crime prevention officer on-site this morning to try and get their involvement on-site.

    12th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    8th September 2014 A member of W&A maintenance team is due on-site this afternoon to look at the Core 2 Courtyard door.

    5th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    3rd September 2014 –  The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date, and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please scan the barcode located throughout our apartment blocks or visit www.waltonandallenapp.co.uk. You can also download this app for FREE from the Apple or Google Play Stores.

    29th August 2014 Walton and Allen operative carried out fire panel tests

    27th August 2014 A member of W&A maintenance team is due on-site today to jet wash the Cigar Factory Courtyard.

     

    22nd August 2014 Park West Core 3 Lift – WORKING

    Following our comment on 20th August 2014, our lift technician attended site yesterday and fitted the repaired required part. As there was still an issue with the doors, an engineer attended site today to resolve.

    The Lift is in full working order.

     

    22nd August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    20th August 2014 A member of W&A Maintenance team is due on-site at Cigar Factory today to:

    • Weed the courtyard
    • Clear rubbish from the courtyard
    • Prepare render for the courtyard wall

     

    20th August 2014 Park West Core 3 Lift

    Following our comment on 13th August 2014, our lift engineers are due on-site today to remove the faulty part for repair.

     

    15th August 2014 A member of W&A maintenance team has attended site today and resolved the issue with the Core 1 courtyard door.

    15th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    13th August 2014 – Park West Core 3 Lift

    Following our comment on 29th July, our lift engineers are due on-site on:

    • Wednesday 20th August 2014 – to remove the required part for repair off site
    • Friday 22nd August 2014 – to refit the repaired part

     

    8th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    1st August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

     

    29th July 2014 – Park West Core 3 Lift

    Following our meeting with our lift company this morning, we have today instructed the costly repair to this lift.

    Please note – due to the extent of the damage, caused by vandalism, this is a major repair

    We have not been informed of the timescale for this repair as of yet but will update this page when we have further information.

    28th July 2014 – Park West Core 3 Lift

    W&A are having an urgent meeting with our lift company tomorrow about the current lift situation.

     

    25th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    24th July 2014 A member of W&A is due on-site this afternoon to carry out a walk around inspection.

    24th July 2014 A member of W&A maintenance team is due on-site this afternoon to carry out an emergency light test & light sweep of the communal areas.

    22nd July 2014 – Park West Core 3 Lift

    Following our comment on 15th July 2014, we are still awaiting a report and quote from the independent lift engineer.

     

    18th July 2014 A member of W&A has been on-site today and carried out a walk around inspection.

    18th July 2014 A member of W&A is due on-site to carry out emergency light repairs and a fire panel test.

    18th July 2014 – The Park West Core 3 courtyard door has been repaired.

    15th July 2014 – Park West Core 3 Lift

    Following our comment on 11th July, we have an independent lift engineer attending site tomorrow to investigate the works required.

    15th July 2014 A member of W&A maintenance team is due on-site today to carry out emergency lighting repairs & replacements.

    11th July 2014 – Park West Core 3 Lift

    Due to size of repair and damage that was caused by vandalism, we are carrying out further investigations into the works required.

     

    11th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    10th July 2014 Members of W&A Maintenance team are on-site this morning finishing the painting the lower level entrance lobbies.

    8th July 2014 Members of W&A Maintenance team are on-site today and tomorrow painting the lower level entrance lobbies from the car park at Park West.

     

    7th July 2014 A member of W&A Maintenance team is due on-site today to weed the ramp from the Ilkeston Road exit roller shutter.

     

    7th July 2014 A member of W&A Maintenance team is due on-site today to carry out an emergency light test & light sweep of the communal areas in both Park West & Cigar Factory.

     4th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    3rd July 2014 – Park West Core 3 Lift

    Following our comment below, W&A have received a response from the lift manufacturers and they are looking into this repair and what parts are required.

     

    1st July 2014 – Park West Core 3 Lift

    Following our comment on 24th June 2014, as our lift engineers have still not received a response from the lift manufacturers, W&A have today contacted the lift manufacturers direct to see if we can accelerate the resolution. We will await their response.

    1st July 2014 The required part for the courtyard Core 3 door has been ordered.

    1st July 2014 Following our comment below, The Core 2 Lift lights were changed successfully and W&A’s Block Manager has attended site and confirmed that they are in working order.

    30th June 2014 Following our comment on 26th June, our electrician will be returning to site today to replace the lights in the Core 2 Lift.

    27th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    26th June 2014 A member of W&A maintenance team is due on-site today to replace the lights in all 3 lifts now that we have received the required parts.

    24th June 2014 – Park West Core 3 Lift

    Following our comment on 19th June, our lift engineers are waiting on feedback from the lift manufacturers with regards to the required motor support bracket as unfortunately this part is not off the shelf.

     

    25th June 2014 Following our comment below, our glazing contractors attended site yesterday however unfortunately they had the wrong type of glass. They have returned to site today, with the correct glass, and re-glazed the car park door window.

    24th June 2014 Our glazing contractors are due on-site today to replace the glass in one of the car park doors following vandalism.

    20th June 2014 Our glazing contractors are due on-site on Tuesday 24th June to replace the glass in one of the car park doors following it being vandalised.

    20th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th June 2014 – Park West Core 3 Lift

    Following our comment below, our lift engineers are currently trying to source the required motor support bracket from the lift manufacturers.

     

    17th June 2014 Approx. 2:30pm – Park West Core 3 Lift

    Following our comment below, our lift engineer has attended site to fit the required rollers. While testing and running the lift our engineer heard a noise emanating from the motor. On closer inspection they found a bracket has sheared and for health & safety reasons had no other choice than to isolate the lift while we await further recommendations.

    17th June 2014 A member of W&A maintenance team is due on-site at Cigar Factory today to investigate a stack leak.

    16th June 2014 Approx. 3pm – Park West Core 3 Lift

    Following our comment on 11th June, our lift engineers have received the required parts and are due on-site tomorrow morning to fit them.

    13th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

     

    11th June 2014 Approx. 10:30am – Park West Core 3 Lift

    Following our comment below, we are unfortunately still awaiting the delivery of the required parts. We have chased our lift engineers who are currently chasing the supplier.

     

    4th June 2014 Approx. 10am – Park West Core 3 Lift

    Following our comment below, we have today instructed a quote for our lift engineers to replace the top floor landing door kicking rollers and realign the door.

    The required parts have been ordered and the estimated time for delivery is 2 days.

    This lift has been isolated for health & safety reasons until the parts have been received and work complete.

    Sadly this was caused by vandalism.

     

    2nd June 2014 Approx. 11am – Park West Core 3 Lift OUT OF ORDER

    Our cleaners have sadly informed us that the Park West Core 3 Lift is unfortunately out of order and stuck between 5th and 6th floor and looks like it has been vandalised along with other doors in the building. We have reported this to our lift engineers who will attend as soon as possible.

    30th May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    28th May 2014 A member of W&A Maintenance team is due on-site today to change the bulbs in the Core 1 Lift.

    23rd May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    15th May 2014 Unfortunately a police incident was reported due to criminal damage to the meter cupboard car park door and car park entrance doors

    14th May 2014 Park West Core 3 lift reported to contractors to be repaired.

    13th May 2014 Fire panel test carried out by W&A

    7th May 2014 Cleaners reported an issue with the roller shutter in Ilkeston Road. W&A maintenance attended the site and repaired the issue. This was potentially caused by someome driving into the roller shutter.

    6th May 2014 Bin Collection

    The council have confirmed that they will return to site to empty all bins as only the Drby Road side bin were collected

    2nd May 2014 Car Park security door improvements

    Our contractors have completed all the improvements to the security doors including a full metal replacement of Core 1 Lower car park door, strnethening to Core 1 Upper car park and Core 3 lower car park door

    1st May 2014 – 6 monthly Water Tank Checks

    We are pleased to inform you that our contractors have carried out the 6 monthly water tank checks

    30th April 2014 – Security/Car Park Doors

    Following our comment below, TSS are due on-site today to complete the job on improving security measures to the car park doors.

    28th April 2014 – Security/Car Park Doors

    TSS has been on-site today to improve security measures to the car park doors and will return to complete the job on Wednesday 30th April 2014.

    28th April 2014 Sterilizing Services are due on-site today to carry out the contracted water tank and pumps service visit.

    25th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out:

    • An emergency light test
    • A light sweep of the communal areas
    • A fire panel test

    17th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    11th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    4th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    2nd April 2014 – Upper Exit Roller Shutter

    Following our comment below, Walton & Allens block manager has attended site this morning to test the upper exit roller shutter. The work carried out yesterday has significantly reduced the loud banging noise.

    1st April 2014 – Upper Exit Roller Shutter

    Following our comment on 19.03.14, Arnold Security are on-site this morning to carry out the rehanging of the upper exit shutter to reduce the loud banging noise that occurs when the shutter is approx. halfway up.

     

    1st April 2014 – The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please scan the barcode located throughout our apartment blocks or visit www.waltonandallenapp.co.uk where you can email or text a link to your phone.

     

    28th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    27th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a light test & light sweep.

    26th March 2014 – Security

    The emergency stop button to the lower shutter has been disabled to prevent the shutter from being tampered with.

    25th March 2014 – Upper Entrance Roller Shutter

    Arnold Security on-site this morning to service the upper extrance roller shutter.

     

    19th March 2014 – Upper Exit Roller Shutter

    We have instructed the upper exit shutter to be taken off and rehung to stop the loud banging noise which occurs when the shutter is approx. halfway up. Due to work commitments, our contractors can’t give us a date that this work can be completed until after the 24th March 2014.

     

    18th March 2014 A member of Walton & Allen maintenance team is due on-site today to make required emergency light repairs.

    14th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    11th March 2014 Following our comment on 21st February 2014, a member of Walton & Allen maintenance team is due on-site today to:

    • Upgrade the two remaining lifts to LED light fittings which will help reduce the wattage on the circuit and the chance of them blowing.
    • Carry out an emergency light test

    10th March 2014 Approx. 10.30am – Abandoned Items

    Our removal contractor is on-site to remove ALL of the abandoned items in the car park.

    May we remind residents to please dispose of unwanted bulky items rather than dumping them in the car park. The Nottingham City Council will collect these free of charge if a resident phones them on 0115 915 5555.

    7th March 2014 Approx. 10am – Vomit

    It appears that someone has vomited all over the top stair case in core 3 at Park West.

    Our cleaning team will be on-site shortly to clean this up and get rid of the smell but we would like to ask the culprit to take more care as extra cleaning cost the building and landlords money.

    7th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

     

    6th March 2014 – Abandoned Items

    We have arranged for a contractor to remove ALL of the abandoned items in the car park on Monday 10th March 2014.

    May we remind residents to please dispose of unwanted bulky items rather than dumping them in the car park. The Nottingham City Council will collect these free of charge if a resident phones them on 0115 915 5555.

     

    6th March 2014 – Lower Car Park Roller Shutter

    Our roller shutter contractor has been on-site and fixed the fault with the lower car park roller shutter.

    5th March 2014 Approx. 3pm – Core 3 Stairwell Lights

    Following our comment below, our maintenance engineer has resolved the issue with the stairwell lights on the 2nd floor in Core 3.

    5th March 2014 Approx. 12pm – Core 3 Stairwell Lights

    We have been informed by our cleaners that the stairwell lights on the 2nd floor in Core 3 are not working. We have arranged for a member of our maintenance team to attend today to investigate this fault.

    5th March 2014 – Cigar Factory Courtyard Area

    A member of Walton & Allen maintenance team is due on-site today to clear the Cigar Factory courtyard (at the top of the Derby Road stairs) of any rubbish or items that do not belong to residents.

    3rd March 2014 Approx. 3:50pm – Core 3 Lift WORKING

    Following our comment below, our lift engineer has attended site and resolved the lift issue. The issue was that the roller to the doors had collapsed and the runners were bent which has now been straightened up. The lift was left in full working order.

    3rd March 2014 Approx. 1pm – Core 3 Lift OUT OF ORDER

    We have been informed that unfortunately the Core 3 lift went down during the weekend. We have reported this to our lift engineers who will attend as soon as possible.

    3rd March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    27th February 2014 Walton & Allens Block Manager has visited site this afternoon.

    21st February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    21st February 2014 – Core 1 Lift Lights

    A member of Walton & Allen maintenance team has been on-site this morning and replaced the light fittings to LED fittings which will help reduce the wattage on the circuit and the chance of them blowing. We intend to upgrade the other 2 lifts in the near future.

     

    19th February 2014 Following our comment below, our maintenance engineer replaced all of the required lighting in the communal areas however unfortunately could not complete the Core 1 lift lights as we were sent incorrect parts from our supplier. As soon as we receive the new delivery we will return to site.

    19th February 2014 Following our comments below, a member of Walton & Allen maintenance team is on-site today to:

    • Continue with replacing lights in the communal areas (now we have received our delivery of bulbs)
    • Upgrade the Core 1 Lift lights to LED Fittings which will help reduce the wattage on the circuit and the chance of them blowing.

     

    17th February 2014 Following our comment below, our maintenance team has completed the light sweep to see what bulbs/parts are required. They have replaced some bulbs in Core 3 however did not have enough bulbs to replace the remaining. We have ordered more bulbs and once delivered they will return to site.

    17th February 2014 A member of Walton & Allen maintenance team is due on-site today to complete a light sweep of all blocks.

    17th February 2014 Approx. 3:30pm – Vomit

    It appears that someone was sick on Level 2, Core 3 of Park West. Our cleaning team will be on-site shortly to clean this up and get rid of the smell but we would like to ask the culprit to take more care as extra cleaning cost the building and landlords money.

    17th February 2014 – Core 1 Lift Lights

    Following our comment below, unfortunately the problem with the Core 1 lift lights could not be resolved on-site. The problem found was that the fittings were temperamental/failing so we have ordered not only new fittings but LED fittings which will help reduce the wattage on the circuit and reduce the chance of them blowing, like they were doing.

    We are currently waiting for delivery of these fittings and dependant on delivery we hope to return to site by Thursday.

     

    11th February 2014 A member of Walton & Allen maintenance team is due on-site today to attend to the Core 1 & Core 3 lift lights. They will also be investigating a possible connection fault with the core 1 lift lights.

    10th February 2014 Walton & Allens Block Manager & Block Administrator have visited site this afternoon to meet another security expert and to also discuss the noise from the shutters.

    10th February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    4th February 2014 Walton & Allen’s Property Manager is on-site this afternoon to carry out a walk around inspection. They will also be meeting our gate contractor to investigate the noise from the shutters and a security expert.

    31st January 2014 A member of Walton & Allen maintenance team is due on-site on Monday to carry out a Fire Panel test.

    24th January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    20th January 2014 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

     

    8th January 2014 The Rubbish in the bottom car park has been reported to our contracted cleaners and will be cleaned this afternoon.

    7th January 2014 We are aware that someone has vomited on the 3rd floor in Core 3. We have instructed our contracted cleaners to arrange for their supervisor to clean this affected area.

    7th January 2014 A member of Walton & Allen maintenance team is due on-site today to investigate the fault with the Core 2 Lift lighting.

    3rd January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    30th December 2013 – CORE 3 LIFT

    Following our comment on 23rd December 2013, our lift engineer has attended site and resolved the issue with the lift. The lift has been returned to working order.

    27th December 2013 Grit bins installed at the site in the upper car park for the exit slope and in the courtyard. For residents use.

    23rd December 2013 On Friday 27th December 2013, A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    23rd December 2013 Approx 11am – CORE 3 LIFT DOWN

    We are aware that the Core 3 Lift is unfortunately down. We have reported this to our lift engineers who will attend to this problem as soon as possible.

    20th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    16th December 2013 A member of Walton & Allen maintenance team is due on-site today to make repairs and replace lighting in the communal areas.

    13th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Light Sweep of the communal areas and a Fire Panel test.

    11th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    9th December 2013 A member of Walton & Allen maintenance team is due on-site today to complete a light sweep of the communal areas.

    6th December 2013 Someone has unfortunately stolen the hand rail out of the Core 2 Lift and scratched the mirror.

    This type of behaviour won’t be tolerated as it costs the building to have this repaired.

    If anyone has any information on this incident please report it to us by phoning 0115 9243304 or emailing info@waltonandallen.co.uk

    6th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    6th December 2013 approx. 9:30am – Refuse Collection

    We have been advised that ALL bins have been emptied.

    6th December 2013 Walton & Allens Property Manager is on-site this morning carrying out a site inspection.

    5th December 2013 A member of Walton & Allen maintenance team is due on-site today to replace the Core 3 Lift lights.

    5th December 2013 approx. 10:30am – Refuse Collection

    Following our comment below, we have received an email back from a manager at Nottingham City Council who has said that they are returning to site today.

    4th December 2013 approx. 1pm – Refuse Collection

    We are aware that the bins were not emptied yesterday. We have reported this to the Nottingham City Council and have been provided with the reference number 894739. We have also emailed a manager to help us get this problem rectified.

    2nd December 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    29th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    22nd November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    20th November 2013 A member of Walton & Allen maintenance team is due on-site today to check the working order of all the Core Doors.

    18th November 2013 We are aware that the Core 3 lift lights are out. We have received the new bulbs and a member of our maintenance team is due on-site tomorrow to fit them.

    15th November 2013 A member of Walton & Allen is due on-site today to carry out a Fire Panel test.

    8th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    7th November 2013 – Core Doors

    A member of Walton & Allen maintenance team attended site last night to fix the Core 2 door. They are also due on-site today to check the other core doors.

    6th November 2013 Approx 10am – Our lift engineer is on-site now to complete the contracted service visit on all three lifts.

    1st November 2013 – Fly Tipping

    Rubbish is being dumped on the Park Hill Street near Park West & The Cigar Factory. We have reported this to Nottingham City Council who are investigating this as potential fly tipping.

    Please place your rubbish in the correct bin areas at Park West, which are located in the car park. Do not place it near the rubbish which has already been dumped as it will only make the matter worse and you may put yourself at risk from being investigated for fly tipping.

     

    1st November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    31st October 2013 Walton & Allens Property Manager is on-site this morning to carry out a walk around inspection.

    30th October 2013 Sterilizing Services are due on-site today to carry out their contracted water tank & water pump service visit.

    25th October 2013 A member of Walton & Allen is due on-site today to carry out a Fire Panel test.

    22nd October 2013 Our Fire System contractors are on-site this morning to carry out their contracted maintenance visit.

    21st October 2013 A member of Walton & Allen maintenance team is due on-site today to remove any broken bollards in the car park which were fitted by residents or leaseholders.

    14th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    11th October 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    4th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    3rd October 2013 A member of Walton & Allen maintenance team is due on-site to carry out a light sweep of the communal areas.

    3rd October 2013 – Cigar Factory

    A supervisor from Spotlight Cleaning was on-site yesterday to clean up the bird fasces in the main entrance.

    1st October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Light sweep, litter picking the courtyard and checking that all the core doors are working correctly.

    2nd September 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    28th August 2013 Our lift contractors have been on-site today to attend to the out of order lift in Core 3 which had a problem with the doors. This has now been solved and the lift is back up and running. They also serviced all the lifts while on-site.

    20th August 2013 a member of Walton & Allen maintenance team is due on-site today to carry out an emergency lighting test.

    12th August 2013 Following our comment below, we have instructed the quote for the required door improvements.

    30th July 2013 Our contractor is on-site today with his door specialist to look at the Cigar Factory main door. A quote will then be provided to us.

    26th July 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel & emergency light test.

    26th July 2013 – Water Pumps

    Following our comment below, The pump engineer is on-site this morning to re-fit the repaired water pump.

    18th July 2013 – Water Pumps

    Following our comment on the 17th July, the pump engineer has found that the following parts are required:

    1 x mechanical seal, 2 x o rings, case joints, 2 x motor bearings.

    This pump will be re-fitted once the parts have been fitted and the repair has been completed.

    18th July 2013REFUSE COLLECTION

    We have arranged a meeting with Alvin the new Waste Collection Manager on Friday 2nd August 2013 at 11:00am to discuss the problems we have experiences and ensure that this does not happen again.

    18th July 2013REFUSE COLLECTION

    THE BINS IN BOTH CAR PARKS WERE EMPTIED LAST NIGHT

     

    18th July 2013 REFUSE COLLECTION

    At approx. 10:30am we phoned the Nottingham City Council, as we have not received a call back, and were advised again that a manager would phone us back.

    Shortly after this phone call we received a call back from Alvin the new manager of the Waste Department who is starting his official job role on the 1st September. He wanted to personally phone us back so this problem could be resolved before he starts his job role. We were advised that the bins were emptied last night. We are currently trying to arrange a meeting with Alvin to discuss the problems we have experienced.

    17th July 2013REFUSE COLLECTION

    As we have still not received a call back, we phoned the Nottingham City Council again at approx. 3:15pm. We spoke to Tony who said that he would get his line manager of the Contact Centre to phone us back within 20-30 minutes.

    At approx. 4:00pm we received a call back from Ian the manager of the Contact Centre. He unfortunately couldn’t help us as he is not the manager of the Waste Collection. All the managers are in a meeting but he will ask them to call us back first thing tomorrow.

    17th July 2013REFUSE COLLECTION

    As we have not received a call back this afternoon, we have phoned the Nottingham City Council at approx. 1:30pm. We were on hold for approx. 10 minutes while Paul was trying to connect us through to the manager Jason but Jason REFUSED to take our call. Paul advised us to keep calling back and he will inform his manager as this is not good enough.

    We then phoned the Environmental Health to express our concerns but we were advised that there is nothing they can do as they are a different department to waste collection and we would need to speak to waste collection about this. We informed them that they were refusing to take our calls and have not emptied the bins for weeks but they would not help.

    17th July 2013 REFUSE COLLECTION

    Following our comments below, we would like to urge residents to also phone the Nottingham City Council on 0115 915 5555 quoting the latest reference number 855857 to complain.

    Walton and Allen are not happy with this service. We pay over £3,000.00 per year on top of the proportion of residents council tax, so in effect the council are being paid twice to do a poor job.

    17th July 2013 REFUSE COLLECTION

    Following our comment below, as we have not received a call back from the manager Jason, we have phoned the Nottingham City Council at approx. 11:20am and stressed the urgency again on this situation to which the gentleman understood and produced a report for our call. He said he would print two copies of the report, put one on the manager Jason’s desk and put another on the other manager Paul’s desk. He did try to phone both of them but both lines went to answer phone. We are to expect a phone call back this afternoon; if we don’t then we will phone them again.

     

    17th July 2013 REFUSE COLLECTION

    Our cleaners informed us yesterday, Tuesday 16th July 2013, that the bins have still not been emptied. We have phoned Nottingham City Council at approx 9:50am and asked to speak to the manager Jason. We could only request a call back so we have stressed the urgency of receiving the managers call back this morning as this situation is getting ridiculous. We also mentioned that we would like to arrange a meeting with the manager to discuss this. We were provided the reference number 855857 for our call.

     

    17th July 2013 – Water Pumps

    Following our recent walk around inspection it was noted that one the water tank pumps seem to be leaking. An engineer attended site to look at this but due to the low lighting they could not investigate fully where the leak was coming from. Therefore they have removed the pump from site to investigate further in the workshop. This will have no impact on the working order of the other pumps.

    12th July 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    9th July 2013 We are aware that there is a problem with the Cigar Factory main door. A member of Walton and Allen maintenance team is on-site today to look at this problem.

     

    10th July 2013 REFUSE COLLECTION

    Jason the manager at Nottingham City Council phoned us to report that the bins have been emptied. We informed him that our cleaners have told us that the top end car park was but NOT the bottom end car park off Ilkeston Road. Jason mentioned that the bin crew said their fobs work intermittently, sometimes they work, sometimes they don’t. We explained to him that the bin crew were sent new fobs a few months ago so if there is a problem with them they need to tell us and they need to come into our office for us to re-programme them or provide them with new fobs as they need to access the bins to empty them. Jason will speak to the drivers to see if they can come to the office.

     

    9th July 2013 REFUSE COLLECTION

    Our cleaners have informed us that the bins in the top car park have been emptied as a member of our maintenance team was on-site at the time and let them in. However as he did not have a fob to the bottom end car park off Ilkeston Road, they did not empty these.

     

    5th July 2013 REFUSE COLLECTION

    Following our comment below, we received a call back at approx. 3:45pm from the manager Jason. He doesn’t understand why the bins are not being emptied but the team have gone home now so he cannot question them to find out why. He is confused as it is a new bin team as the old team were unreliable. He will look into this issue and get it sorted by Monday 8th July 2013. He will phone us back on Tuesday to update.

     

    5th July 2013 REFUSE COLLECTION

    Following our comment on 3rd July 2013, we have not received a call back from a manager. We phoned Nottingham City Council at approx. 2:30pm and spoke to Jade who tried to put our call through to a manager but informed us that he is just going into a meeting but Jason will call us back in 1 hour.

     

    4th July 2013 Our buildings manager is meeting a member from the recycling department at Nottingham City Council on-site this morning in order for them to fit more hooks so that we can provide more recycling bags. Can residents please make sure that they use this facility to the full potential and do not abuse it.

    3rd July 2013 REFUSE COLLECTION

    Our cleaners have informed us that the bins were not emptied yesterday, Tuesday 2nd July 2013. We have phoned Nottingham City Council who has said the drivers will revisit site to empty them. As they could not provide us with a reason why the bins have not been emptied we requested a call back from a manager. We spoke to Daniel who provided us with the reference number 850925 for our call.

    1st July 2013 Following a recent pump service visit, it was noted that the Cigar Factory pumps are not operating correctly. Current only one pump is operating as lead which will result in this pump being over used and worn. Our pump engineer is due on-site today to fit an impulse relay part which will allow both pumps to operate as lead.

    26th June 2013 Following our comment below, the bins have been emptied.

    25th June 2013 Two members of Walton & Allen maintenance team are on-site today and tomorrow making repairs to the water damaged car park ceiling.

     

    26th June 2013 – REFUSE COLLECTION

    The cleaners have confirmed that the bins were emptied yesterday, Tuesday 25th June 2013.

     

    20th June 2013 REFUSE COLLECTION

    We have been informed that the bins have not been emptied again. We have had strong words with Nottingham City Council and they have assured us that they will get emptied in the next 3 working days and they have requested for bins to be emptied without fail every Tuesday. We spoke to Daniel who provided us with the reference number 846774 for our report.

    19th June 2013 It has been reported to us that several lights near the entrance to Park West lower car park are out so the area is dark. A member of Walton and Allen maintenance team will be on-site tomorrow to investigate this problem.

    12th June 2013REFUSE COLLECTION

    We have been informed that the bins have not been emptied for 2 weeks. We have contacted the Nottingham City Council and spoke to Tony who has provided us with a reference number for this report of 843731. They have informed us that they will get someone to site as soon as possible.

     

    3rd June 2013PARK WEST CORE 2 LIFT

    A “temporary” fix is being attempted today by the lift manufacturer, Morris Vermaport.

     

    31st May 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a fire panel test.

    29th May 2013 Following our below comment, we can confirm that all of the dumped items of furniture in the car park have been removed.

    28th May 2013 Following our comment below, unfortunately our maintenance team could not remove these dumped items on friday due to an emergency job. A member of Walton and Allen maintenance team is due on-site today.

    22nd May 2013 Our cleaners have informed us that several large furniture items have been dumped in the Park West car park. A member of Walton and Allen maintenance team is due on-site Friday 24/05/2013 to remove these items.

    20th May 2013 We are aware that the majority of the lights are out in the Park West Core 1 Lift. We have now received the order of bulbs and a member of Walton and Allen maintenance team is on-site today to fit them.

    10th May 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a fire panel test.

    15th April 2013 We have been informed that the bins are again full. We are still in contact with Nottingham City Council about this problem.

    12th April 2013 Following our comment below, the refuse collectors phoned us and said they could be on-site if someone would meet them to give them access. A member of Walton and Allen maintenance team met them on-site and gave them access to the upper block car park and provided them with that fob. We informed them that they will need to collect a lower block car park fob from our office.

    12th April 2013 Following our comment below, our cleaners have reported that the bins have still not been emptied. We have phoned Nottingham City Council again and have been informed that they are having major problems with their bin wagons. They have apologised for this and the bins should be collected either today or tomorrow. They have provided us with a reference for this log of 824055.

    11th April 2013 We have been informed that the bins have not been collected. We have phoned Nottingham City Council and this issue has been logged.

    8th April 2013 Sterilizing Services are due on-site today to carry out their routine checks on the water tanks and booster pumps.

    5th April 2013 Two members of Walton and Allen maintenance team are on-site today investigating/attending to a stack leak in the building.

    28th March 2013 Please click the below link which shows the letter that was sent out in yesterdays post to all leaseholders and residents of the flats in Core 2 with an update on the lift.

    files/Park West Core 2 lift letter to residents and leaseholders 27.03.13.pdf

     

    25th March 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a fire panel test.

    20th March 2013 Following our comment on 11.03.13, PLP are due on-site on today to service the Fire alarm, Emergency Lighting and Dry risers.

     

    19th March 2013 – PARK WEST CORE 2 LIFT

    Following our below comment, please see the following pdf document which is the report from our independant lift engineer on the process they carried out below on 13.03.13.

    files/Park West Core 2 Independent Lift Report 18.03.13.pdf

    We have instructed the independent lift engineer to produce a quotation based on his recommendations shown on the above link.

     

    14th March 2013PARK WEST CORE 2 LIFT

    Our independant lift engineer attended site yesterday, 13.03.13, and went through the following process:

    1. Check the continuity of the following cable connections between the control panel and the lift car:

    a. ASC, this is the car serial connection cable, i.e. that which allows the processor software to talk directly to the car components such as the indicators, push buttons and door gear.

    b. P, this is the connections to the shaft positioning devices and maintenance controls mounted on the car top, i.e. the switches that cause the lift to decelerate and stop at the floor levels and the engineer maintenance controls.

    c. ALG, this is the car devices connection cable, i.e. car lighting, alarm systems etc. But also carries the very important earthing wiring of the lift car that is critical to this type of system.

    2. Check the connections of the car top Concentrator, this is the car top connection box which contains the connectors and circuitry to allow the systems on the car to connect correctly with and talk to the main control panel and control processor.

    3. Check the continuity of the cable connections between the car door gear, type 2300, and the car top concentrator, this is an extension of the ASC cabling providing the car serial link as detailed above in 1.a.

    4. Check the operation of the car top positioning sensors ZD, ZS, ARS and ARD. These are the switches that tell the control processor the position of the lift car in the lift shaft and also tell the controller that the lift is at floor level and to allow the doors to open.

    5. Using the diagnostics section of the MP5000 manual view the status of the lift and carry out a review of the status.

    6. Test the door motor and connections between the door motor control card and the door motor, Tacho/pulse generator. The Tacho is the system that tells the control card the speed of the doors and was considered the root of the problem being seen.

    7. Verification of the serial signalling between the control processor  and the lift shaft and car equipment via the diagnostic indicators DL1-24V, TXE-shaft serial transmission and TXI-car serial transmission, this is the actual talking between the control panel processor and the shaft and car components.

    8. Carry out various operational tests as described in the MP5000 manual with regard to verification of the actual operation of the lift.

    After carrying out these checks, the current conclusion is that there is a fault with the door gear card. This item controls the opening and closing of the doors. The card is receiving sufficient signal strength from the central processor unit which points to this malfunctioning. The independent engineer will be looking into this further today at his office utilising the manual. We have instructed him to report his findings along with the cost to replace this card (if this is the fault). If the card cannot be replaced due to its age then the engineer has been instructed by us to provide alternative solutions along with the associated costs. We shall keep you updated with any further progress.

     

    11th March 2013 Following our comment below. Unfortunately due to snowy weather conditions, PLP have had to postpone the maintenance visit to Wednesday 20th March 2013.

    7th March 2013 PLP are due on-site on Thursday 14th March 2013 to service the Fire alarm, Emergency Lighting and Dry risers.

    7th March 2013 The contractor is on-site today carrying out door code checks. Doing this will check the system for any errors before the full code change takes place. He will also be on-site with the electrician to look at the wiring works for the CCTV and preparing the side entrance gate for the new safety strip to be fitted.

    27th February 2013 – PARK WEST CORE 2 LIFT

    Please see the below link which shows the letter that was sent out 1st class post to all Core 2 leaseholders on 25.02.13. This letter was hand delivered to all Core 2 residents yesterday, 26.02.13.

    files/Park West Core 2 Lift letter to Residents and Leaseholders 25.02.13.pdf

     

    27th February 2013 The cleaners are due on-site today to clear the cigarette ends in the courtyard. May we remind you that this building is a no smoking building. Please dispose of your cigarette ends correctly as it is creating litter.

    25th February 2013 The engineer is due back on-site today to continue the repair to the lower car park roller shutter. He will be fitting the new sensor/ strip and correcting the gate system.

    The Side entrance shutter is still awaiting the correct part to be delivered. Due to the different strip types which were originally fitted on each shutter, the part needed to be sourced from elsewhere and has taken longer to be delivered.

    A Walton and Allen representative is meeting with the CCTV engineer tomorrow to discuss the various options and dates for the works to be carried out.

    21st February 2013 A contractor will be on-site tomorrow to carry out works on the upper gate sensors on the car park gate. Parts for the lower gates are still on order.

    12th February 2013 A technician is due on-site Friday 15th February 2013 to survey the lifts.

    8th February 2013PARK WEST CORE 2 LIFT UPDATE

    Another lift engineer will be on-site this afternoon. We will update you as soon as we have further information.

     

    6th February 2013PARK WEST CORE 2 LIFT UPDATE

    We have been informed by Otis Lifts that the way the lift was originally made is so that only the lift branded parts can be fitted to the lift. Therefore they have confirmed that the lift parts cannot be modernised to new universal parts. The only door gear tacho part that will work on the lift is the part that is obsolete and has to be specially made from a company in Italy.

    The only other suggestion is upgrading the whole lift but as this is an expensive procedure we would have to provide 3 quotes for this work and gain authorisation. We have already requested 3 companies to gain these quotes so that we are prepared. We are currently trying to find out if the door gear tacho part that Schindler originally ordered to be made was ever delivered to them. If they do have this part then we will ask them if they can fit it so that the lift can be in working order.

    4th February 2013 A roller shutter engineer from Armourpost Limited is due on-site this week on Wednesday 6th February 2013 or Thursday 7th February 2013 to carry out a survey.

    24th January 2013PARK WEST CORE 2 LIFT UPDATE

    Due to the on-going problems that we have had with getting hold of this required door gear tacho part which has to be specially made from a company in Italy, Walton and Allen have instructed for our new lift company to quote to modernise the lift and parts to the lift. We are currently waiting on our lift company to work out what parts are required and then they will inform us of a price and date that this job can be completed. We can only apologise for the inconvenience that this has caused.

    23rd January 2013 Due to the weather conditions, a representative of Walton and Allen is due on-site today to grit the courtyard and steps.

    23rd January 2013 Following our below comment, Otis Lifts should be due on-site today to investigate the Core 3 lift problem.

    22nd January 2013 We are aware that the Park West Core 3 lift is jolting whilst in motion. Our new lift engineers will need to carry out a full inspection on the lift to investigate the problem. We are currently waiting on them to provide us with a date when a technician can be on-site.

    19th January 2013 – PARK WEST CORE 2 LIFT UPDATE

    We apologise that this lift is still out of service and for the inconvenience that this has caused. We are currently waiting on the required lift parts in order to fix the lift. Our lift engineers have received a few of these parts however our engineers are waiting on the door gear tacho part which is the crucial required part. They have sourced this part but are currently waiting on delivery. We are hoping to have this lift working intermittently by the end of next week. We can confirm that Schindler Lifts are no longer servicing these lifts and we no longer have a contract with them.

    We apologise again for this lift being out of order but would like to assure you that we are taking this matter very seriously and are working very closely with our new lift engineers to resolve this problem as soon as possible.

    15th January 2013 Otis Lifts are due on-site today to carry out a survey visit.

    14th January 2013 – PARK WEST CORE 2 LIFT UPDATE

    Due to the lift being down for a long amount of time and having no success with Schindler Lifts, we got another lift company, Otis Lifts, out Last week W/C 07.01.13. They have confirmed that there is no bypass switch or temporary fix that can be made to the lift and that the door gear tacho part is required which unfortunately this part isn’t readily available and has to be specially made. This part should be received, fitted and the lift in working order by 24th January 2013. Otis lifts are due on-site one day this week to carry out a survey visit to see what can be done to these lifts to stop this problem happening again. We apologise for the inconvenience that this has caused.

    11th January 2013 A Walton and Allen maintenance engineer is due on-site today to carry out a fire panel test.

    4th January 2013 Please see the following link for free removal of your Christmas tree through Nottingham City Council: http://www.nottinghamcity.gov.uk/index.aspx?articleid=20361

    4th January 2013 A Walton and Allen maintenance engineer will be on-site today to carry out a fire panel test and test all of the roller shutter doors.

    20th December 2012 – Signs have been put up around the core 2 lift today to keep everyone informed:

    PARK WEST CORE 2 LIFT

    The Lift maintenance contractor, Schindler Lifts, have had difficulty in obtaining a vital part called a ‘door gear tacho’.

    We tried to get the lift working temporarily but without the door gear tacho, users could be ‘crushed’ by the doors.

    It has been confirmed today that the part won’t now be with Schindlers until the 23rd January 2013 and fitted shortly thereafter.

    We can only apologise for the delay and inconvenience.

    If you need any further information then please contact Kerrie at Walton and Allen on 0115 924 3304.

     

    19th December 2012 With regards to the two faulty main doors, our locksmith contractors have taken away both faulty maglocks. One maglock has a wiring fault which will be rectified. The other maglock has a faulty part and a new part has been ordered. Once both maglocks are fully functioning they will return to site and fit them.

    18th December 2012 Following our comment below, the lift company is still chasing the suppliers daily to find out what the situation is on this required lift part and when it will be delivered.

    11th December 2012 Park West Core 2 Lift

    Following our comment on 12th November 2012, we were expecting the door gear tacho part to be delivered by the end of last week. We have chased our lift engineers who are currently chasing the parts supplier to find out the situation on this. We will update you once we have further information on this.

     

    5th December 2012 – PARKING SPACE TO RENT

    There is a parking space available to rent in the Park West basement level car park for £70.00 per month ONO. If you are interested in renting this space, please phone the office on 0115 924 3304.

     

    4th December 2012 Walton and Allen representatives will be on-site today to look at the car park issues.

    3rd December 2012 It appears that someone was sick on the top floor in core 2 at Park West. Our cleaning team will be on-site today but we would like to ask the culprit to take more care as extra cleaning cost the building and landlords money.

    27th November 2012 Please contact Walton and Allen on 0115 924 3304 if you have any issues with the building that you would like to discuss or report.

    15th November 2012 We have received reports of rats sighted at the Park West development, particularly around dumped rubbish bags near the main gates. Pest Control have been contacted and shall be onsite tomorrow. Please will tenants be considerate with their waste; carelessly dumping rubbish bags on the ground has caused this issue and vermin problems will persist if it continues. Thank you for your cooperation.

    13th November 2012 We are aware that the Parkwest Core 3 main door is not locking. Our contractor will attend to this problem immediately.

    12th November 2012 Signs have been put up around the core 2 lift to keep everyone informed:

    PARK WEST CORE 2 LIFT

    We are fully aware that this lift has not been functioning since 24th September 2012. This is due to a fault with the door print and door gear tacho.

    The lift contractors have been trying to source the part which has proven to be difficult as there has been a disagreement between the lift company and the Italian part supplier.

    However the new door gear tacho part has been sourced and ordered from another company which will arrive in this country early to mid December and will be fitted shortly after.

    We know how inconvenient this is but we want to assure you that we are doing everything possible.

    If you need any further information then please contact Kerrie at Walton and Allen on 0115 924 3304.

     

    7th November 2012 Our lift engineers have informed us that they are immediately attending to the lift in Core 3 as it is out of order and a person is trapped inside.

    31st October 2012 The lift engineers have confirmed that the new part supplier can supply the door gear tacho part that is required to fix the lift. This part is on order but please be aware that unfortunately the delivery is between 28 and 35 days.

    29th October 2012 Our lift engineers are still waiting on a response from the possible supplier with regards to the difficult part required to fix the lift.

    24th October 2012 If you have an emergency outside of office hours, please contact 0115 924 3304 and you will be re-directed to our out of hours service.

    19th October 2012 Due to our lift engineers still waiting to get hold of the difficult part required to fix the lift, our engineers have now contacted another company who may be able to supply this part. We apologise for the inconvenience and thank you for your patience.

    19th October 2012 An engineer has been on-site and repaired the Cigar Factory main entrance door. The door is now in full working order and building secure.

    18th October 2012 It has been reported to us that the Cigar Factory main entrance door is not locking. We have instructed our engineer who will attend immediately.

    12th October 2012 Following our comment below, The Core 3 external door is now fixed and back in full working order.

    12th October 2012 We are aware that there is a problem with the Core 3 external door not locking. We have informed our contractors who will attend to this problem as soon as possible.

    10th October 2012 Unfortunately due to vandalism the main gate at the top end of the building is now out of service. We ask that all residents use the other gate to gain access in and out of the building area. We apologise for any inconvenience caused and endeavour to have the situation resolved as soon as possible.

     

    9th October 2012 Unfortunately our comment below still applies. The engineers are still waiting on this difficult part and we will update you once we have further information.

    2nd October 2012 The lift engineers have informed us that the new door print part for the lift in Core 2 has been ordered. Once received, this part will be fitted as soon as possible. We will update you as soon as we have further information and we apologise for the inconvenience.

    28th September 2012 The engineers have confirmed that the full repairs to the upper car park roller shutter were carried out on 26th September 2012 and it is now in full working order.

    26th September 2012 Following our below comment, the engineers attended to the upper car park roller shutter yesterday. The spiral cord/safety edge had been damaged which they temporary fixed so that it was in working order. The engineers have provided us with a quote for the full repairs which we have given the go ahead for this work to be completed. The engineers will be on-site as soon as possible to carry out this work and we will update you when we have further information.

    25th September 2012 We are aware that there is a problem with the upper car park roller shutter not returning to a closed position. We have reported this to the engineers who should be able to attend this afternoon.

    24th September 2012 The lift engineers have informed us that the lift in Core 2 is out of order due to a fault with the door print or encoder. They are currently waiting on parts and we will update you as soon as we have further information on this.

    24th September 2012 We have been informed that the lift in Core 2 is out of order. We contacted our lift engineers immediately who will be on-site as soon as possible.

    21st September 2012 The lift engineers have confirmed that the lift in Core 3 is back in full service.

    19th September 2012 We are aware that the Core 3 lift lights are not working. We have informed the lift engineers who will be on-site as soon as possible.

    19th September 2012 The lift engineers have confirmed that the lift in Core 1 is back in full service.

    18th September 2012 The lift engineers confirmed that the lift in Core 1 was fixed Friday morning. However residents have reported that the lift is now down again. We have informed the lift engineers who will be on-site as soon as possible.

    13th September 2012 Following our update below, the lift engineers have informed us that the safety gear underneath the car needs to be looked at and parts may be required. The repair team will be on-site Friday morning, 14th September 2012. We apologise for the inconvenience and we will keep you updated.

    12th September 2012 Following an engineers lift inspection, the lift in Core 1 has now been shut off due to the break pad contacting the grid which is creating a loud noise which could result in the lift breaks to possibly not work correctly. The lift engineers will resolve this problem as soon as possible and we will update you as soon as we have further information.

    12th September 2012 The engineers have been on-site and repaired the lift in Core 1. The lift is now in full service and no longer makes a noise when in operation.

    11th September 2012 The engineers have confirmed that the lift in Core 2 is back in full service.

    We are aware that the lift in Core 1 is making a noise when in operation. We have reported this to the lift engineers who should resolve this problem as soon as possible.

    10th September 2012 The lift in Core 2 has been reported as down. Walton and Allen have contacted the lift engineers who will be on-site in due course. We apologise for any inconvenience this may cause you and thank you for your patience. We endeavour to have the issue resolved as quickly as possible.

    7th September 2012 The engineers have confirmed that the lift is back in full service. We thank you for your patience.

    7th September 2012 A representative of Walton and Allen is on-site today.

    5th September 2012 Following our update below. The engineers have confirmed that the new part has now been delivered and they are due on-site tomorrow afternoon. We will update the bulletin board with any further details in regards to when the lift will be in full service.

    5th September 2012 We are aware that the lift in Core 2 is still out of service. We are currently waiting on the engineers to inform us of when the repairs can be carried out. We apologise for the inconvenience and thank you for your patience. We will update you as soon as we have further information.

    29th August 2012 Unfortunately the lift in Core 2 has been shut off by the lift engineers due to faulty equipment. A part has been ordered however at this time we cannot estimate how long it will take to fix the lift. We apologise for the inconvenience. We will update you as soon as we have further information.

    28th August 2012 The lift in Core 2 has been reported faulty. The lift engineers were called immediately and shall be on site to fix it at some point today.

    22nd August 2012 If you have any building concerns or issues that you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help

    31st July 2012 A Walton and Allen maintenance engineer is on-site today.

    27th July 2012 If you have any building or maintenance issues please contact the office on 0115 9243304.

    16th July 2012 We have again called the council regarding the bin situation they have advised that it should be collected this afternoon up until around 7pm tonight but could not give an exact time.

    16th July 2012 The lift in core 1 has been reported as down. An engineer will be on site in the next 2 hours.

    13th July 2012 We have called the council regarding the bins not being emptied. They will attend site monday morning and ensure all the rubbish is collected.

    12th July 2012 Gate engineers have been on-site today carrying out maintenance works to the entrance gate.

    6th July 2012 A pipe has been reported to have burst in the car park area. Our contractor will be attending site as soon as possible to asses the situation.

    6th July 2012 The lifts are all up and running.

    6th July 2012 Due to adverse weather conditions please be aware that there will be excess water in certain areas of the building especially in the car parks. Please take extra care when walking through the car park areas, main entrances and where excess water is forming large puddles.

    6th July 2012 An engineer will be on site this morning to ensure that the lift is back up and running. Please await for further updates. Many thanks for your patience in the matter.

    4th July 2012 an engineer has been working on the motor for the lift in core 2. Please wait for further details for when the lift will be up and running. Apologies for any inconvenience this may cause.

    3rd July 2012 The lift in core 2 is still down. We are currently working on getting this up and running as soon as possible.

    29th June 2012 The lift in core 2 has been reported as down. Walton and Allen have contacted the lift engineers who will be on-site in due course. We apologise for any inconvenience this may cause you and thank you for your patience. We endeavour to have the issue resolved as quickly as possible.

    27th June 2012 All lifts are up and running.

    26th June 2012 IMPORTANT NOTIFICATION/Gas Boilers – Flues in voids – new legislation

    In November 2010 the Health & Safety Executive issued new compulsory guidelines for property owners to arrange for inspection hatches to be fitted to concealed flues, originating from a gas boiler.

    This situation usually occurs where the boiler is sited on an internal wall. The purpose is to be able to inspect joints that may be leaking carbon monoxide and other noxious gases.

    These works will be required to be completed by 31st December 2012. After 1st January 2013 any gas engineer working on a system where the complete flue is not visible will advise the owner that the system is ‘at risk’ and turn off the gas supply to the boiler so that it cannot be used. This does not mean that your flue system is suddenly unsafe.

    Walton and Allen is able to organise and carry out the necessary works (if applicable to your property), with a fixed price per hatch. Should you wish to discuss any of the above then please contact Brent Weightman on 0115 924 3304 or email brent@waltonandallen.co.uk.

    26th June 2012 Both the core 2 & core 3 are up and running but seem to have a fault with them. Our engineers are working on this issue to ensure it is up and running.

    25th June 2012 A contractor will be on site shortly to take a look at the lift in core 2.

    25th June 2012 The lift in core 3 is now up and running.

    22nd June 2012 Our contractor will be out first thing Monday morning to take a look at the lift in core 3.

    22nd June 2012 Our contractors will be on site today carrying out an assessment of the building.

    20th June 2012 A Walton and Allen property manager were on-site today carrying out an on-site inspection.

    20th June 2012 Walton and Allen contacted the lift engineers who have been out repaired the lift in Core 1. The lift is now in full service.

    19th June 2012 A property manager will be on site tomorrow carrying out a site inspection.

    19th June 2012 The lift in core 1 is down. A contractor will be out this evening to take a look at this.

    14th June 2012 Walton and Allen maintenance engineers are on-site today

    8th June 2012 Again we have had to get a contractor out as tenants have been driving into the lower roller shutter and also resetting the upper roller shutter due to them not having the correct fob access. This is costing the RTM a considerable amount to repair tenant damage on a regular basis. If you see or know anyone that does not have the correct access please contact us immediately.

    1st June 2012 Walton and Allen contacted the lift engineers who have been on-site and repaired the lifts. Both lifts are in services.

    29th May 2012 Our engineer will be on site first thing tomorrow to check the issues that core 2 & 3 lifts are having.

    29th May 2012 Walton and Allen maintenance engineers are on-site today
    22nd May 2012 The lift in core 1 is now all up and running. There are a few lights which are out but an engineer will be on site tomorrow to ensure these are replaced.

    18th May 2012 We are currently working closely with both our lift contractors and Morris Vermaport on getting the lifts in core 1 back up and running. A new printed circuit boards within the control system are to be replaced. Please wait for further update. Many thanks for your continued patience.

    18th May 2012 We have again noticed that residents are dumping their rubbish outside the shutter door. This makes the building look untidy. If you see anyone doing this please call the office straight away as this is an on-going issue at the site.

    14th May 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    10th May 2012 Engineers have been on site throughout the day carrying out tests and repairs to the fire alarm system. They still have not reported whether or not it’s repaired but they will be in contact with us by tomorrow.

    10th May 2012 We are aware that the fire alarm is sounding. An engineer has been called and will be on-site as soon as possible.

    8th May 2012 we currently have no further updates on the lift. We are waiting for the manufacturer to reply to us with a response to resolve the on-going issue.

    3rd May 2012 We are aware that the lift doors are not operating correctly and appear to be sticking.  Contractors have been called and will be on-site in due course to investigate the issue.

    1st May 2012 Further to the ongoing issue with the lift in core 1, please see below for the report that has been provided to us from the engineers. They are working tirelessly to ensure this can be resolved as quickly as possible. The ongoing issue with the lift at Park West is that the unit will not accept calls from the landing push buttons.

    We have had the whole string of push buttons off the lift and checked over every aspect of it trying to find the cause of the fault. Our engineers have had some telephone support from Morris Vermaport as they are the UK agents for the control manufacture.

    In an attempt to pin point the route cause we have exchanged circuit boards between the lifts on site although on all occasions the fault remains with the same unit. This has indicated that the fault is not from the control circuit is so much as a failed printed circuit board.

    It was suggested that the lift has microswitch overload sensors fitted and these can isolate the landing calls if the lift is fully loaded. This was checked and again cleared as not the cause of the fault.

    We have employed Morris Vermaport directly to site themselves at which point they changed a variety of circuit boards in a hope of identifying the cause and clearing the fault but again this proved to be fruitless and in the main a repeat of the actions we had already taken.

    Morris Vermaport have now e-mailed technical support in the control manufacture. This outlines the fault and the codes the control system is displaying so there technical department have a full understanding of the issue we are facing.

    Currently we are waiting on an answers from them to resolve this issue. Please be assured that we are calling daily to progress this as soon as possible.

    Many Thanks for your ongoing patience and co-operation with this issue. We will keep you updated with any further developments.

    24th April 2012 To All Residents – When you are moving out of your apartment please do not dispose of any unwanted furniture or Items by leaving them around the building or in the bin store. If you have large Items to dispose of then please contact the council on 0115 9155555.

    20th April 2012 The manufacturer are due on-site Monday morning to investigate the on-going lift issue in Core 1.

    20th April 2012 We are aware that the door to core one is broken. A contractor will be on site this afternoon to take a look at this.

    19th April 2012 The issue with the lift is on-going. The manufacturers are going to attend the site as soon as possible. Please await a further update with a date for the visit.

    17th April 2012 The main pedestrian gates have now been repaired.

    16th April 2012 We are aware that the front pedestrian gate does not appear to be working correctly. An engineer has been called and will be on site shortly.

    13th April 2012 The lift will be out of action for the weekend as the main circuit board has been sent away as there is a major fault with this. We hope it will be back and running by early next week. Many Thanks for your patience.

    12th April 2012 An engineer will be on site today to take a further look at the ongoing issue with the Core 1 Lift. Thank you for your patience in getting the matter resolved.

    12th April 2012 Contractors will be on site today doing a general inspection of the building.

    11th April 2012 The roller shutter gate has now been fixed. Again it appears there is a resident at Park West who does not have a access fob and is compromising the security of the whole building by leaving the shutter open. If you see anyone doing this please call the office immediately.

    11th April 2012 The lift in Core 1 is still experiencing technical faults even after many visits. The engineers are working hard to get this sorted as soon as possible. Please await for further updates.

     10th April 2012 We are aware that the main gates at Park West are open. A contractor has been called and will be on site tomorrow.

    Easter Weekend opening times Walton and Allen head office will be closed Good Friday 6th April and Easter Monday 9th April. Business will resume as normal from the Tuesday 10th April 2012.

    An out of hour’s emergency line will be in service over this period, in the event of an emergency please call: 07940219547

     

    5th April 2012 Lift engineers have apologized for the delay in getting the lift repaired. After several conversations with the engineer he has advised that the unit has a fault where it cannot take landing calls. The engineer has taken the whole set apart and still the fault remains. He has changed some of the control parts which were ordered. The engineer has advised that he will be back on site today to continue with repairs. The engineer will be contacting us today with schedule of repairs and updates.

    Walton and Allen would like to apologies about the delay and any inconvenience that this may be causing. We thank you for your patience and hope to have the issue resolved as soon as possible.

    4th April 2012 Works on the entrance doors where carried out on the 30th March 2012. This was due to the locking mechanisms being vandalised. The doors have been repaired and the building is secure.

    4th April 2012 The lift in core one is still out of service we are currently waiting on parts to be delivered to the engineers.

    3rd April 2012 It has been reported into us that the lift in core 1 is out of service. An engineer has been out to investigate and they are currently waiting on parts to be delivered. We apologise for any inconvenience and thank you for your patience. We endeavour to have this issue resolved as soon as possible.

    30th March 2012 It has been reported that damage has been caused to all the entrances. Switches and locking mechanisms have been vandalised and currently the doors are not working correctly. A contractor has been called and will be on-site this morning to secure the building once again

    28th March 2012 We are aware that the lift in Core 1 is out of service. An engineer has been called and will be on-site in due course. We apologise for any inconvenience which may be caused and thank you for your patience and co-operation.

    27th March 2012 Contractors have been out to the broken exit gates on Ilkeston Road side. They have confirmed that the gates have been breaking down due to a resident trying to gain entry by flicking switches in the junction box in order to gain entry into the building. This resident obviously does not have a key fob. If you do not have a key fob to enter the building or know of someone that does not have an access fob and you are a resident please contact the office 0115 924 3304. If you see any resident trying to gain access without a fob or tampering with the gate and entry system, please report them immediately to head office 0115 924 3304. When the gate is continually broken it leaves the building in a breach of security as the gates are open for extended periods of time. Please always stay vigilant and think of other residents, it’s down to one residents negligence that has caused cars to be damaged.

    26th March 2012 An engineer is on-site today carrying out repairs to the exit roller shutter on Ilkeston road side.

    20th March 2012 A Walton and Allen maintenance engineer is on-site today.

    16th March 2012 The lift button on the ground floor in core 1 has now been repaired.

    14th March 2012 We are aware that the lift button on the ground floor in core 1 is sticking and difficult to press. An engineer has been called out and will be on site tomorrow.

    14th March 2012 A Walton and Allen maintenance engineer is on-site today investigating the intermittent fault with the car park shutters.

    14th March 2012 A Walton and Allen maintenance engineer is on-site today to carry out safety and cosmetic repairs to communal areas of the building.

    14th March 2012 The lift in Core 3 is now in service.

    14th March 2012 A Walton and Allen maintenance engineer was on-site yesterday to investigate the fire alarm system. He found the fault which has now been rectified and the fire alarm system has been re-set.

    13th march 2012 We are aware of the fire alarm going off in core 3. We will have someone out today to take a look and resolve the issue.

    13th March 2012 The engineer is currently on site repairing the lift in core 3.

    12th March 2012 A lift engineer is on-site today carrying out repairs to the core 3 lift.

    7th March 2012 Gas engineers have been on site for the past 2 days rectifying a gas issues to the building. This gas issue has now been resolved and the gas supply is in service.

    7th March 2012 The Lifts in Core 1 & 3 are now in service.

     7th March 2012 A Walton and Allen maintenance engineer is on-site today.

    7th March 2012 A contractor is due on-site today to repair the lifts in Core 1 & 3.

    6th March 2012 We are aware that the lift is down in core 1 & 3 the buttons are sticking on both lifts which is preventing them from working. A contractor has been called and will be on- site in due course.

    6th March 2012 Some apartments are still without gas but majority of the apartments where turned back on yesterday. For the apartments without gas, engineers are on-site today further investigating the issue.

    6th March 2012 The water supply issues have been rectified and supply to the building is back on.

    5th March 2012 We are aware that there is an issue with the water supply to the building. Seven Trent have reported to be dealing with the situation and engineers will be on site in due course to investigate the issue. A Walton and Allen maintenance engineer has been on-site and also investigated; however this is problem will have to be dealt with by Seven Trent.

    Seven Trent have a website which has a live feed website page which will have updates for the building. Please refer to http://w5.stwater.co.uk/incidents.html?IncidentPostCode=NG7+1LU. We will endeavour to keep you updated, please do not hesitate to contact us on 0115 924 3304 if you have any questions or queries.

    5th March 2012 The roller shutter gate was reported to not be working, A Walton and Allen maintenance engineer has been on – site and rectified the issue.

    5th March 2012 Gas engineers will be on-site from 12pm today.

    5th March 2012 Over the weekend a gas leak was reported in the Cigar factory half of the complex. British Gas attended site and shut off the main feed to the building.

    Walton and Allen are currently on-site looking into the issue and request your patience. Updates will be made available though out the day.

    If you have any question please do not hesitate to call 0115 924 3304

     

    2nd March 2012 A Walton and Allen maintenance engineer is on site Monday 5th March.

    29th February 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    27th February 2012 A Walton and Allen maintenance engineer is of site today carrying out cosmetic repairs to communal areas throughout the building.

    24th February 2012 The main door to the building to core 1 has now been repaired.

    24th February 2012 The main entrance door to Core 1 is stuck closed. A Walton and Allen maintenance engineer will be on site in due course to repair the door.

    24th February 2012 Core 3 lift is now in service.

    24th February 2012 It has be noticed that on occasions rubbish bags are being left outside the roller shutter gate. We have asked the cleaners to remove this rubbish and put in the allocated bins. Please ensure when disposing  of your rubbish that you use the buildings allocated bins. We will monitor the building to try and catch the culprits. If you notice any body leaving rubbish bags in places other than the bins please contact the office 0115 924 3304. It is important to us that the building is kept clean, tidy and presentable.

    23rd February 2012 The lift in core 1 is now in service. The core 3 lift is still down, a contracted engineer will be on-site tomorrow to carry out repairs.

    23rd February 2012 A contracted lift engineer is on site today carrying out repairs to the lifts. We apologies for any inconvenience caused and thank you for your patience. The lifts are currently still out of service.

    22nd February 2012 We are aware that the lifts in core 1 and core 3 are out of service, a lift engineer has been called and will be on site in due course. We thank you for your patience on the matter.

    20th February 2012The lift in core 1 is still out of service, the engineers are currently waiting on parts to be delivered.

    17th February 2012 we apologise for any inconvenience caused regarding core 1 lift being out of action. An engineer will be out to this as soon as possible.

    13th February 2012 Brent Weightman will be on-site Wednesday 15th February carrying out a routine site inspection. If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    13th February 2012 A contracted maintenance engineer has been on-site and repaired the lift in core 1, the lift is now in service. If you experience any further issues or have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    9th February 2012 The lift in service. The engineer will be on site this morning to repair the lift in core 1.

    9th February 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    9th February 2012 A Walton and Allen maintenance engineer is on-site today making repairs to top floor apartment windows.

    8th February 2012 A Walton and Allen maintenance engineer will be on site today conducting emergency light testing. There will be no disruptions to individual apartments but communal area will be without lighting for a short period of time. Please take care when using

    8th February 2012 The lifts in core 1 & 3 are experiencing issues. An contracted lift engineer has been called and will be on site in due course.

    6th February 2012 We are aware that the lift in core 3 has been reported as out of service. A lift engineer has been called and will be on-site in die course.

    26th January 2012 Brent Weightman and Graham Stevenson are on-site today carrying out and on-site inspection. They will be looking at the car park area and lighting system, the exterior of the cigar building and other communal areas. If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help, or you can find Brent and Graham on-site today.

    23rd January 2012 The Lighting issue has now been resolved.

    21st January 2012 The lighting issue are still on going. Walton and Allen maintenance engineers are on-site today repairing the lighting system and replacing the fault part. Please take care when using the communal areas with no lighting and we apologise for any inconvenience caused. Thank you for your patients and co-operation.

    20th January 2012 We are aware of no lighting in the communal areas on certain floors in the building. An engineer has been on-site and investigated the fault and is currently picking up a replacement part. We endeavour to get this situation resolved by this evening. Please take care when using the communal areas with no lighting and we apologise for any inconvenience caused. Thank you for your patients and co-operation.

    13th January 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    13th January 2012 Walton and Allen maintenance engineers are on-site today carrying out maintenance repairs and touch up painting to communal areas throughout the building.

    13th January 2012 Brent Weightman will be on-site on Wednesday 18th January 2012 to carry out an on-site inspection. If you have any questions or queries and would like to meet with him on-site then please call the office 0115 924 3304 and he will be happy to help.

    11th January 2012 A contracted engineer has been on-site and carried out repair to the lift. The lift is now fully operational.

    10th January 2012 The lift in core 2 has been reported as down. An engineer has been called and will be attending the site tomorrow to rectify the issue.

     

    Christmas and New Year office opening times:

    Friday 23rd December 2011: 9am – 12pm

    Christmas Eve – Closed

    Christmas Day – Closed

    Boxing Day – Closed

    27th December 2011 (Bank Holiday) – Closed

    28th– 30th December 2011 – Open – Closing times may vary

    New Year’s Eve – Closed

    New Year’s Day – Closed

    2nd January 2011 (Bank Holiday) – Closed

    3rd January 2011 9 – 5.30pm

    In the case of an emergency during office closing hours; Please call our emergency contact Dave on 07974941533. An emergency matter can be defined as water leaks, gas leaks, foul drainage or critical electrical faults.

    22nd December 2011 We are aware of an issue regarding the front entrance door to the Cigar factory. A contractor has been on-site and we are looking into cost effective ways of repairing the door.

    13th December 2011 The Roller shutter gate has been ordered, the contractor is awaiting delivery. As soon as the part arrives we will receive a date for the repairs to start in due course.

    12th December 2011 The Roller shutter gate is completely out of action. Due to the gate being driven into on more than one occasion, the shutter gates runner and system no longer work and a full unit will need to be looked into and replaced. The gate will be out of action till further notice, we apologise for any inconvenience that this may cause and thank you for your patience and co-operation. Please take care when using the other gate entrance and exit.

    9th December 2011 We are aware that the roller shutter gate which leads on to Ilkeston road has been driven in to, damaged and knocked off its runners. A contracted engineer has been called and will be on-site in due course. We apologise for the inconvenience and thank you for your patience and co-operation.

    8th December 2011 A Walton and Allen maintenance engineer is on-site today carrying out minor repairs and touch up painting throughout the whole building to noticeable cosmetic damage. The Walton and Allen maintenance engineer is also on-site carrying out vital repairs to emergency fire doors.

    6th December 2011Contracted engineers are on-site carrying out maintenance checks to the fire system throughout the building.

    6th December 2011 Brent Weightman will be at the Cigar Factory side of the building today, he will be carrying out an on-site inspect. If you have any questions or queries and would like to meet with him on-site then please call the office and he will be happy to help.

    6th December 2011 Leaks have been investigated and located in the car park area. Walton and Allen maintenance engineers have been on-site and repaired a majority of the leaks and a contracted plumber has been called who will be on-site in due course to repair leaks and pipe work which require further investigation. Once all leaks have been resolved and the car park area has dried, we endeavour to re-paint the parking spaces so they can be seen more clearly.

    29th November 2011 Brent Weightman will be on-site carrying out an on-site inspection on the 1st December 2011. If you have any questions and queries then please find him on-site or call the office and he will be happy to help.

    29th November 2011 A Walton and Allen maintenance engineer is on-site today carrying out a monthly emergency light test, there will be no disruptions to individual apartments, but all communal areas will be without lighting for a short period of time. Leaks are also being investigated and leak damage is being repaired.

    28th November 2011 A Walton and Allen maintenance engineer is on-site today carrying out works on the Communal doors which are being re weather proofed for the winter.

    22nd November 2011 Brent Weightman will be on-site carrying out an on-site inspection on the 1st December 2011. If you have any questions and queries then please find him on-site or call the office and he will be happy to help.

    21st November 2011 The Roller shutter gate has now been repaired and is fully operational.

    17th November 2011 We are aware that the shutter gate has been down for a few days.  A contracted engineer has been on-site to investigate the issue. The issue has now been identified and the contractor is waiting on a part to be delivered and will be back on-site in due course to repair the gate. We apologies for any inconvenience caused and we thank you for you patients and cooperation.

    16th November 2011 The lift in block one is now fully operational, we thank you for your patience and co-operation whilst repairs were being carried out.

    11th November 2011 We will be holding a two minutes silence at 11am in respect of Armistice Day. Our answer machine will be turned on at this time so please leave a name and number and we will return your call after the two minutes silence. Apologies for any inconvenience caused.

    10th November 2011 Brent Weightman Property and maintenance manager at Walton and Allen will be conducting a monthly site inspection on the 10th November & 1st December 2011 at 11am. If you have any questions and queries then please find him on-site or call the office and he will be happy to help.

    8th November 2011 The lift in block one is down. An engineer has been called and will be on site in due course. We apologise for any inconvenience and we thank you for the patience and cooperation.

    7th November 2011 We are now operating from our new premises:

    Ground Floor, Price House, 37 Stoney Street, Lace Market, Nottingham, NG1 1LS.

    Our email addresses, website address and telephone numbers are the same.

    We would like to thank you for your patience and cooperation whilst we were moving and look forward to continuing our service to you from our new premises.

    7th November 2011 A Walton and Allen maintenance engineer is on-site today carrying out minor repairs and touch up painting throughout the whole building to noticeable cosmetic damage. Another Walton and Allen maintenance engineer is also on site carrying out vital repairs to emergency fire doors.

    7th November 2011 A Walton and Allen maintenance engineer will be on-site in due course to repair the broken shutter door. We apologise for the inconvenience and thank you for your patience and cooperation. We will keep the board updated regarding the progress of this.

    1st November 2011 The lift is still down in the building. A contracted engineer was on-site yesterday and found that the doors have been knocked off there tracks but this time it has damaged the skate on the doors. This is the part that connects the lift doors and landing doors. The contractor will be sourcing the part today, and once found will get the part ordered. We apologise for any inconvenience caused and thank you for your patience and cooperation.

    31st October 2011 We are aware that the lift in the building is down. An engineer has been called and will be on-site today. We apologise for any inconvenience that this may cause and thank you for your patience and cooperation.

    31st October 2011 A Walton and Allen engineer will be on-site as soon as possible to attend to the fire alarm going off.

    28th October 2011 We are aware that the core 2 lift is down.  An engineer has been called and will be on site in due course. We apologise for any inconvenience that this may cause and thank you for your patience and cooperation. We will keep the board updated of any progress regarding this.

    28th October 2011 Brent Weightman is on-site today at 11am, if you have any questions or queries then please find him on-site and he will be happy to help.

    27th October 2011 Brent Weightman will be on-site tomorrow morning at 11am, if you have any questions and queries then please find him on-site and he will be able to help.

    26th October 2011 We are aware that the shutter door to the car park is broken. An engineer has been called and will be on site in due course. We apologise for any inconvenience and thank you for your patience and cooperation.

    26th October 2011 Brent Weightman will be on-site today meeting with an external painting company to survey areas in need of re-decoration. We are still waiting on the report from the damp removal company. We will keep you posted of any updates regarding this.

    24th October 2011 Brent Weightman was on site today meeting with the damp removal company. The engineer has surveyed the areas of damage and will be sending us a report within the week. We will keep the board updated of any further progress regarding this.

    21st October 2011 A Walton and Allen maintenance engineer will be on site today carrying out minor repairs.

    20th October 2011 Brent Weightman Property and maintenance manager will be on site on the 24th October 2011 at 9am, he will be meeting with a Damp removal company to investigate the damp issue which is in parts of the Cigar Factory structure. Brent will also be on site on the 28th October 2011 at 11am till 12pm. If you have any questions or queries then please find him on site or call the office and we can arrange for you to meet him onsite.

    20th October 2011 A Walton and Allen maintenance engineer was on site on the 19th October 2011 to carry out an emergency light test. An engineer was onsite to repair the lift which is now fully operational.

    18th October 2011 The entrance doors leading from the street to the Cigar factory building 1 and 2 are being repaired. They have been already been sanded and primed; A Walton and Allen engineer will be back on site as soon as possible to finish the painting and to put Kick plates on the doors. We will keep you update of any progress regarding this.

    18th October 2011 A Walton and Allen Engineer will be on site on the 19th October 2011 to carry out emergency light testing throughout the whole building. There should be no electrical disturbances to the apartments but all communal areas will be without lighting for a short period of time.

    30th September 2011 The core 3 lift is down, an engineer has been called and will be out in due course.

    26th September 2011 Our contractor has been out today doing work in the communal areas. And will be going back in the next few days.

    19th September 2011 The lift in core 2 has been reported as stuck on floor 3. An engineer has been called and will be out this afternoon.

    17th September 2011 We have had a report that the upper level car park exit door is broken. We will make the contract aware of this and see when they are next available to take a look at this.

    15th September 2011 There is a light in the communal area which is exposed in core 2 on level 3. Our contractor will be out to take a look at this in the next few days.

    22nd August 2011 An engineer will be on site doing  essential maintenance works around the building.

    10th August 2011 In the light of last night’s events please ensure all doors and gates are closed behind you after entering or exiting the property. An inspection has been carried out this morning to ensure all entrances and exits are in full working order. While carrying out this inspection a tenant was caught over riding the roller shutter. If you see anyone doing this please make them aware that this is the cause of the break ins.

    5th August 2011 All of the car park gates are now up and running. We have recently been having a high volume of reports about doors being left open from the car park area to the apartment block. These were all closed off yesterday. Today an inspection has been done and these are again all wide open. We cannot offer good security if residents do not close the gates behind them.  For the sake of all residents please ensure the gates are closed after use so that security of the block is not compromised.

    4th August 2011 We are aware of the recent break ins and have been liaising with the local police on this matter. They are fully aware of the situation and will be stepping up their patrols in the area. The gates will be fixed in the coming days. However please note if tenants continue to misuse the gates unfortunately we cannot guarantee they will be repaired as a priority in the future.

    20th July 2011 Our contractor will be on site this morning doing maintenance around the communal areas.

    19th July 2011 Our contractor will be on site this morning to check the gates as there have been issues reported with them. Another update will follow today.

    16th July 2011 The new bulbs in the communal areas will be fitted on Tuesday 19th July 2011.

    14th July 2011 We are aware that some bulbs in the communal areas are out. We have placed an order for these. Please await further updates.

    23rd June 2011 The gate at Park West has been reported as constantly open. Someone is on site re setting it. If this does not resolve the problem an engineer will be on site this afternoon.

    20th June 2011 We have been made aware of the rubbish situation at Park West. We are going to get this cleared asap. But in the meantime if you are moving out could you please ensure you dispose of your own flat waste/furniture in the appropriate way. Or if you see large items being dumped please call the office.

    16th June 2011 We are in the process of trying to pinpoint the problem with the pad in the core 2 lift. BT is experiencing technical problems. Please await further update.

    15th June 2011 We are aware that the lift in core 2 is down. Someone will be on site within the next 4 hours.

    15th June 2011 An engineer will be on site this afternoon to take a look at the car park gate issue.

    10th June 2011 We are aware that the lift in core 3 is down. This is due to be repaired next week. Please await further update.

    8th June 2011 Our contractor will be on site today resolving an on-going problem with drainage issues.

    4th June 2011 The lift in core 3 is down. We are waiting for parts.

    31st May 2011 Our contractor will be out this afternoon to take a look at the problem with the lights being out in core 1.

    27th May 2011 The water pumps have all been fitted, replaced and tested. Your water pressure will now be back to normal.

    26th May 2011 We are closed for Monday’s bank holiday but will be open as normal Saturday 28th May 2011 between 9-12pm. So if you have an emergency during the bank holiday period please contact Dave on 07974941533. An urgent matter can be defined as water leaks, gas leaks, foul drainage or critical electrical faults. Call out charges are chargeable and if the problem is not considered to relate to communal areas or the external fabric of the building, the caller may be charged personally.

    25th May 2011 The pumps are due to be fixed this Friday morning. Please await further updates.

    19th May 2011 We are aware that the garage door gates have been damaged. We will be getting an engineer to go out to take a look at what can be done.

    16th May 2011 Once again tenants have been tampering with the gates and have manually switched them off. If you see anyone doing this please call the office as this is becoming a continuous issue.

    16th May 2011 The contractor will be on site tomorrow to repair the on-going aerial issue. So if anyone who has encountered problems with receiving certain channels please re tune after 6pm tomorrow evening.

    12th May 2011 An engineer will be on site this afternoon to take a look at the car park gates.

    12th May 2011 We are unable to do vital works on the water pumps in the basement car park. We cannot complete these to due to a parked black Audi registration number DU51 RHE. If you are the owner of this car or know the owner please call the office.

    2nd May 2011 The water pumps went down at the weekend and a temporary fix was put on the pumps. A contractor will be on site at around 10am to rectify the fault with the pumps.

    28th April 2011 We are closed on the dates below. So if you have an emergency during the bank holiday period please contact Dave on 07974941533. An urgent matter can be defined as water leaks, gas leaks, foul drainage or critical electrical faults. Call out charges are chargeable and if the problem is not considered to relate to communal areas or the external fabric of the building, the caller may be charged personally.

    28th April 2011 Walton and Allen are closed on the following dates:

    Royal Wedding Friday 29th April and Monday 2nd May.

    18th April 2011 We are aware that there is a faulty garage door. We are waiting on the parts, which we expect to be with us by the end of this week/start of next week taking into account the bank holidays.

    14th April 2011 Walton and Allen are closed on the following dates:

    Good Friday 22nd April and East Monday 25th April.

    14th April 2011 A contractor will be on site tomorrow morning to asses further damage to the core entry door and the entry door also.

    14th April 2011 Walton and Allen are closed on the following dates:

    Good Friday 22nd April and Easter Monday 25th April. We will be open as normal on Saturday 23rd April from 9am-12pm.

    13th April 2011 Please re-tune your T.V.

    13th April 2011 The lift last night in core 3 was reported faulty. This has been shut down and the engineer will be out this morning to carry out maintenance on the lift.

    12th April 2011 The digital switchover will be taking place over the course of the year. If you find that you are having problems with your signal or missing channels then please ensure you attempt to retune and take the necessary steps before contacting us.

    5th April 2011 A contractor will be on site around lunch time tomorrow doing an inspection on the lifts.

    5th April 2011 A site walk is being done this morning to asses the works that are required at the Park West site.

    1st April 2011 Lifts are now fully operational and working.

    31st March 2011 The lift in block 3 will be out of action this evening due to essential maintenance works. But will re-open tomorrow morning.

    29th March 2011 We have conducted a site inspection on garage entrances. The contractor has confirmed the garage doors are fully operational. There are a number of tenants on site who are using the manual override button and leaving the gates open. This is unacceptable and is the main cause for recent breaks ins and damage. If you do not have or have lost a fob please call you’re letting agents or us to arrange payment and delivery. The cost is £50 plus VAT. If you see someone using the manual override please inform us immediately.

    23rd March 2011 Had reports of the gates in the car park area being broken today. We have found that the gates are being put on manual over ride. If tenants could ensure gates are closed at all times after being used.

    22nd March 2011 A contractor will be on site tomorrow to take a look at the lifts.

    21st March 2011 The car park gates have now been repaired and tested.

    21st March 2011 Security will be onsite tonight patrolling the building. And contractors are due on site this afternoon to carry out repairs on the shutter in the car park area. We are also liaising with the police on the recent break ins over the weekend. If you leave the property or car park via any exit please ensure the door is closed firmly behind you.

    17th March 2011- Contractors will be on site attending to general maintenance issues. Also the bulb in the lift in core 3 will also be looked at and replaced.

    15th March 2011 15:40pm: The fire alarm had been reported activated. We visited the site and silenced the alarm. Problem was due to damp sensors in the car park. Going forward we are looking into a long term solution to prevent this.