Welcome to the Lexington Place bulletin board for landlords, tenants and agents providing up to date information on building issues.

Meter Readings

To request a meter reading, please fill in the form on your main entrance noticeboard. If your building does not have a noticeboard form, please use the Walton&Allen app or click here to request one via our website.

Refuse Collection

Bins are located next to the car park and are collected weekly on Tuesdays. If you have larger items that cannot be disposed of in the bins please contact Nottingham City Council on 0115 9155555 to arrange a FREE collection.

Fire Alarm Testing

A fire alarm test is carried out every week on a Friday. The testing should last approx. 30 minutes.

Other information

  • Cleaning – The cleaning is done once a week per block on a Tuesday and Thursday. The communal flooring area is cleaned in the week between these days. The bin areas and building are checked every Monday.
  • Anti-social behaviour – If notice any anti-social behaviour please report to Nottingham City Council 0115 915 2020.
  • Out of Hour Emergency Line: In the event of an emergency please call the office on 0115 924 3304/0115 924 1813 the answer phone message will give you the current emergency call out number. Please note: If the callout is deemed not to be an emergency or to be the fault of the tenant then you may incur a charge for the callout.

Notice Board

Keep up-to-date on all of the scheduled and adhoc maintenance at your building.

Caretaker on annual leave

Please be aware that the roaming caretaker is on annual for the w/c 11/09/2017. If you notice anything around your building please report this directly to the office.

Upper Car Park Roller Shutter

– Following the recent repair, Residents have contacted us to advise that their access fobs are no longer working. Joes UK Ltd are on their way to site now to investigate and are approx.. 30 minutes away

Roller Shutter repair. Approx. 5:00pm

Following our comment below, the new motor has been fitted.

Upper Roller Shutter repair

Following our notice sent to all Residents on 30th August 2017, Joe’s UK Ltd will be on site today to fit a new motor to the Upper roller shutter. The car park entrance will be out of action while this replacement motor is fitted.

Once the contractor has started the work, they will not be able to let anyone in or out of the car park until the work is complete due to the use of scaffolding.

Fire Audit

Walton&Allen Rear fire panel stopped working. Fire safety procedures of security were put in place and Friday lunch new fire panel system installed

Water Disruption. Approx. 5:30pm

Following our below comments our contractors are now on site.

Water Disruption approx. 3:00pm

Following our comments below we can confirm that a contractor will be on site between 5:00pm and 5:30pm to investigate. Unfortunately due to their current work location they are not able to attend earlier.

Water Disruption

Following the comments below we can confirm that the water supply has now been restored to the building. The Engineers believe that at some point within the day the supply had been cut-off for a period which allowed two of the pumps to airlock. The pumps were bled and left working.

Water Disruption. Approx. 1:00pm

Following our comment below a member of the Walton&Allen Maintenance Team has attended but unfortunately cannot resolve the issue. Severn Trent have also attended to ensure that water is being supplied to the building. We are currently sourcing a contractor to attend.

Water disruption – Approx. 11:30am

We are aware that resident’s are experiencing issues with the water supply at present. There doesn’t appear to be an issue with Severn Trent, a Walton&Allen Operative will be attending soon to investigate.

Water
Fire System

Walton&Allen’s Fire Contractors attended site to look into fire system issue

Appliance Testing

Walton&Allen PAT Testing at appliances at the following sites on Wednesday 23/8/2017

 

 

Weekly Fire Panel Testing

Please be aware that the weekly fire panel test will now be completed on a Thursday.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and completed the weekly fire panel test.

Insurance works

WALTON&ALLEN’S maintenance  operatives will be on site replacing the timber structure ceiling to the lower car park.

Emergency lighting

A member of WALTON&ALLEN’S maintenance team have attended today and carried out the Emergency light test.

Lightning Protection Test

A quote for the annual lightning protection test that is due in August has been instructed. We are currently awaiting an attendance date from the contractors.

Fire Safety

A Chartered Surveyor visited site today to inspect any cladding used on the building

Fire Safety

Walton&Allen’s Property and Estate Director  met the NCC Safe homes team on site to have a walk around regarding fire safety. They left happy with what we showed them and did not raise any major concerns.

 

Fire Safety

Walton&Allen’s Property & Estate Director has carried out a walk around looking at fire safety within the block

Emergency lighting

A member of the WALTON&ALLEN Maintenance team has attended site today and carried out an emergency light test and sweep of the communal areas.

Bin Collection

Unfortunately due to roadworks at the top of Plumptre Street the bins on site have not yet been emptied. Walton&Allen’s Block Management Administrator has contacted the local council who have confirmed that they will try and attend today. If access is restricted they will continue to try and empty the bins before the next collection due Tuesday 27th June.

Lift Service

The lift engineers have attended site and completed a routine service visit to the lifts.

Site Visit

Walton&Allen’s Block Manager has attended site and completed a walk around inspection of the communal areas.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and completed the weekly fire panel test.

Service Charges

Walton&Allen’s Credit Controller has sent the Advanced Ground Rent Demands to all Leaseholders of the following buildings today by 1st class post:-

  • Riddles Court
  • Lexington Place
  • The Pines (Backdated from 25th March 2017)
Fire Safety visit

MWE are on site today completed the routine fire safety service visit.

Upper Block Entrance Door

A member of the Walton&Allen Maintenance Team has attended site today and carried out a repair to the upper block entrance door following a temporary repair by the out of hours team.

Window Cleaning

Jordan’s Cleaning Services are on site today to complete the window cleaning.

Site Visit

Walton&Allen’s Property Manager has attended site and completed a walk around inspection of the communal areas.

Roaming Caretaker Service

Please note that the Roaming Caretaker is on annual leave until Thursday 25th May. If you have any issues that you would like to report please contact the office directly.

Block 34-62 intercom

Following our comment below AST have called from site to report that there was a fault with the power supply to the block, this has been rectified. A small handful of apartments may still be without an intercom and a second part has been ordered. Delivery of the part will hopefully be 2-3 days and will be fitted on receipt.

Block 34-62 Intercom. Approx. 9:00am

Following our comment on the 13th May AST are on site this morning to complete a repair to the intercom.

Block 34-62 – Intercom

We are aware that there is a fault with the intercom at this block. It has been reported to our contractors who will hopefully be able to attend on Wednesday 17th.

Fire Damage in the car park

Following our comment on the 25th April, Walton&Allen’s Maintenance Director has attended site and met with potential contractor in order to obtain a quote for repairs to the beams. Walton&Allen have also provided their quote. Both quotes will be presented to the insurance company for approval.

Fire Damage in the car park

Walton&Allen’s Maintenance and Contracts Director has attended site today and met with contractors in relation to the insurance claim for the fire damage in the car park.

Fire Damage in the car park

Unfortunately there was a  out of hours call out to the building for a fire on the beams in the car park last night. A resident took the correct action and activated the fire panel and called the Fire Services. Walton&Allen’s Maintenance Team has attended site and removed any damaged beams.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and completed the weekly fire panel test.

Site Visit

Walton&Allen’s Property Manager has attended site and completed a walk around inspection of the communal areas.

Fire Panel Test

Walton&Allen’s Roaming Caretaker will be attending site today to complete the weekly fire panel test.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and completed the weekly fire panel test.

Upper Roller Shutter

Following our comment on 30th March, we are aware that this shutter is still making a noise when moving. Walton&Allen’s Block Management Administrator has spoken with the contractor again. The contractor will be attending site on Friday 7th April to grease the bearings at the top of the gate.

Upper Roller Shutter

We are aware that there is a ‘screeching’ noise when this shutter moves, our contractor has attended site to grease the shutter. We will monitor this noise, we have been advised that the shutter will need to move in order for the grease to travel.

Lift Service

Kone have attended site and carried out a routine service visit to both lifts.

Water Tanks & Pumps. Approx. 12:30pm

Following our comment below, we can confirm that there was a air bubble trapped in the pipe preventing water to the apartments, this has now been resolved.

Water Tanks and Pumps. Approx. 11:30am

Following our comment on February 24th, Sterilizing Services are on site today to carry out the repair required.

We are aware that residents have experienced disruption to their water supply, the engineer has advised that the whilst the repair is carried out the building is connect to the bypass supply. They are still on site investigating.

Water Tanks & Pumps

Following our comment on the 15th February Sterilizing Services have confirmed that they will be attending site on the 7th and 8th of March 2017.

Stack Leak Repair – Lower Car Park

A member of the Walton&Allen Maintenance Team has attended site carried out a repair to a stack leak in the lower car park.

Water Tanks & Pumps

Following our comment on 1st February the quote from our contractors for a repair on the pipe work has been received and approved. We are currently awaiting their attendance date.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Fire System Contracts

Walton&Allen’s Property and Estate Director has been in correspondence with a fire contractor today in regards to the fire system contract for the building.

Pest Control Visit

The pest control contractors have attended site and carried out a routine service visit.

Water Tanks & Pumps

Following our comment on 30th January 2017 Sterilizing Services have contacted our office and advised that the new pumps are all working okay. Unfortunately repairs are required on the pipe work and a leak is still present. A quote for these works will be provided for approval.

Water Tanks & Pumps

Following our comment on January 24th Sterilizing Services are on site this morning.

Water Tanks & Pumps

Following our comment on the 18th January 2017, Sterilizing Services will be instructing their pump servicing engineer to attend site on Monday 30th January 2017 to see if any of the settings may need adjusting following their install.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a walk around inspection.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an Emergency Light test and light bulb sweep of the communal areas.

Lower Car Park Roller Shutter

Our security contractor has attended site and re-fitted the safety edge to the lower car park roller shutter. We apologise for any inconvenience caused whilst the shutter was open. The shutter has been left in working order.

Water Tanks & Pumps

Sterilizing Services are due on site today to fit 3 x Booster Pumps to the water tanks. They have advised that this will not cause any disruption to residents.

Window Cleaning

Following our comment below the contractors have returned to site today and cleaned the windows at the roof level.

Window Cleaning

Our cleaning contractors have attended site today and completed the external window cleaning. To the lower levels. They will be returning tomorrow 17th January to complete the roof level windows.

Communal Painting

Walton&Allen’s Maintenance Director and Block Management Administrator have attended site and colour matched the paint for the up coming redecoration works.

Fire Panel Tests

A Walton&Allen Maintenance operative has attended site today and carried out the weekly fire panel tests.

Salt/Grit within the Communal Areas

We would like to politely remind all residents that the responsibility for salting/gritting the communal areas is the responsibility of the residents. Please note; even if salt/grit has been provided by the management company, Walton&Allen or the management company take no responsibility for salting/gritting the communal areas.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Lift Service

Kone have attended site and carried out a routine service visit to the Lower & Upper Block Lift

Upper Block Handrail

Following our comment on the 12th December 2016 a member of the Walton&Allen Maintenance team has attended site and made good the wall where the handrail was removed.

Upper Block Handrail

A member of the Walton&Allen Maintenance Team has attended site removed the handrail min the lobby area.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Changes to Christmas and New Year Bin Collections

Please see below a letter from Nottingham City Council advising of any changes to the bin collections at Lexington Place.

changes-to-christmas-and-new-year-bin-collections-20162017

 

 

 

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

2017 Service Charge Budget

The 2017 budget for Lexington Place as been sent to all Leaseholders today.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a monthly site inspection.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Lower Block Entrance Door

Following the new door being fitted we have experienced some settlement issues, Edwards Metal Windows have re-attend today and made adjustments where necessary. The door was left locking securely.

Lower Block Entrance Door. Approx. 3:00pm

Following our comment below the door has been fitted successfully.

20161024_162637

Lower Block Entrance Door. Approx. 9:00am

Following our comment on 04.10.16 our contractors are currently on site replacing the door to the lower block. Our security contractor is also on site to re-connect the fob entry system.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a walk around inspection.

Window Cleaning

Jordan’s Cleaning services attending Lexington Place to clean all accessible windows

Fixed Wire Test

An electrician will be attending site today to carry out the 5 year fixed wire test to the building.

Sterilizing Services

Sterilizing Services will be on-site today to carry out the water tank checks and the booster pump servicing.

Lower Block Entrance Door

Following our comment on 22.08.16 our contractors have confirmed that they will be on site 20th October 2016 to replace the lower block entrance door.

Window Cleaning

Following our comment on 21st July 2016 our cleaning contractors are due on site W/C 10th October 2016 to clean all accessible external windows.

In order for the cleaning to be completed please ensure that your windows remain closed during these days.

2017 Budget Preparation

The initial 2017 budget preparation work by WALTON&ALLEN’s Property Manager has commenced this week.

 

Fire Exit

South Notts Fabrications have attended site and fitted a new secure fire exit gate to the side of the building from the car park.

20160927_164736

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and carried out the weekly fire panel test.

Lift Service visit

Our lift engineers have attended site and carried out a routine service visit to both lifts on site.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Insurance Valuation

BCH will be attending site today to carry out an Insurance re-instatement survey (valuation) for insurance purposes.

New Property Manager

Walton&Allen’s Property & Estate Director has attended site with Walton&Allen’s new property manager to familiarise them with the building.

Fibre Optic Broadband

BT have been instructed to carry out a FREE survey of the site to see if they can propose a way of getting BT’s ultra-fast broadband to individual apartments up to speeds of 300MB. Map Group UK (who work on behalf of BT) will be attending site today to carry out their survey.

Water Services

Sterilizing Services are on site today to carry out the monthly temperature checks.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Lower Block Entrance Door

Following our comment on 05.08.16, the replacement entrance door has been authorised and instructed. We are currently awaiting a time frame from the contractors for the manufacture of the door and once advised we will update this page. This door will be like for like in the basis that it will be glazed units but the door handles will be a different colour to comply with DDA regulations.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Accounts

Walton&Allen’s Property and Estate Director has been working with the accountants to finalise the accounts for 2015.

Lower Block Entrance Door

Although this door is currently secure, it is starting to reach its end of life, therefore we have obtained a quote for a replacement door which has been sent to the Directors of Lexington Place Management Company Ltd to ensure there are no objections to replacing this budgeted item. A deadline of Friday 12.08.16 has been provided for any objections otherwise the replacement door will be instructed.

Coded Lock

A member of the Walton&Allen Maintenance Team has attended site today and replaced a coded lock on a door in the lower block. The door to the post room was also altered to make it more secure on this visit.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

BT Survey

BT are going to be attending site and carrying out free surveys to determine whether it is eligible for free super fast BT broadband upgrades. We are currently awaiting a date that BT will be attending and will updated this page once this information has been received.

Service Charges/Ground Rent

Any Leaseholders that have not made any payments towards Service Charges or Ground Rent, or have not contacted the office, have been sent to Solicitors today in relation to debt collection.

Water Services

Sterilizing Services are on site today to carry out the monthly temperature checks.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Decoration Review

Walton&Allen’s Construction Director and a surveyor have been instructed to carry out a review of the decoration in lobby areas which will be presented to the Directors of the Lexington Place Management Company Ltd.

Fencing

Extra fencing to improve security has been ordered and the expected time for the installation of the fencing is 6 to 8 weeks.

Service Charges – Final Reminders

Walton&Allen’s Credit Controller has sent the Service Charge Final Reminder letters to all leaseholders today.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Window Cleaning

Please see below the dates supplied by the window cleaners for the external windows (accessible):

Week commencing 3rd October 2016

Week commencing 10th April 2017

All window cleaning carried out if weather permitting. Our window contractors will inform us of the actual date the week before in which we will update this page.

Emergency Light Test & Sweep

A member of WALTON&ALLEN ‘s Maintenance team has attended site today and carried out an emergency light test and sweep.

Service Charge Reminders

The 1st Reminders for Service Charges have been sent to all leaseholders today.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and carried out a fire panel test.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site today to carry out a fire panel test.

Emergency Light Test & Sweep

A member of the WALTON&ALLEN Maintenance Team has attended site today to carry out an emergency light test and sweep.

Water Services

Sterilizing Services are on site today to carry out the monthly temperature checks.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance team has attended site today and carried out an emergency light test and sweep of the communal areas.

Service Charges

The second half service charges are due today.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Sky Q Survey

AVUK will be attending site today to carry out a survey to in order to make the apartments Sky Q compatible.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test today rather than tomorrow when it would normally be tested.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Water Services

Sterilizing Services are on site today to carry out the monthly temperature checks.

Site Visit & Caretaker 1 to 1

Walton&Allen’s Property and Estate Director and Block Management Administrator have attended site today with the Roaming caretaker to carry out a site visit 1 to 1 meeting with the roaming caretaker of the building.

Carpet Cleaning

Following our comments below, ChemDry have completed the cleaning of the communal cleaning of the corridors and lift landings of both blocks.

WP_20160602_08_50_12_Pro WP_20160603_10_59_06_Pro WP_20160603_10_59_16_Pro

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Carpet Cleaning

Following our comment below, Chemdry will be returning to site today to continue with the cleaning of the communal carpets in the corridors and lift landings of both blocks.

Carpet Cleaning

Chemdry will be attending site today to carry out the cleaning of the communal carpets in the corridors and lift landings of both blocks. The stairwells are not being cleaned on this visit.

Upper Block Lift – Out of Order – approx. 2:20pm

We are aware the upper block lift is currently out of order. This has been reported to our lift engineers who will attend as soon as possible.

Emergency Light Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Carpet Cleaning

Chem-Dry professional carpet cleaners will be on-site on Thursday 02.06.2016 and Friday 03.06.2016 to clean the corridor and lift landing carpets to both the upper and lower blocks. The stairwell carpets will not be cleaned on this visit but will hopefully be carried out later in the year.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Upper Lift – Working – approx. 1:05pm

Following our comment below, the lift engineers have attended site and adjusted components to the lift. The lift has been returned to full working order.

Upper Lift – Out of Order – approx. 12pm

Following our comment below, the lift engineers are currently on site to investigate the issue with the upper block lift.

Upper Lift – Out of Order – approx. 9:30am

We are aware the upper block lift is currently out of order. This has been reported to our lift engineers who will attend as soon as possible.

Upper Lift – Working – approx. 10:35am

Following our earlier comment on 18.05.16, the lift engineers have attended site and returned the lift to full working order.

Clearing of Cobwebs

Walton&Allen’s Roaming caretaker has attended site this morning as per usual and concentrated on removing the lower car park cobwebs.

WP_20160518_08_12_28_Pro WP_20160518_08_13_11_Pro

 

Upper Lift – Out of Order – approx. 9:00am

We are aware the upper block lift is currently out of order. This has been reported to our lift engineers who will attend as soon as possible.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Advanced Demands – Service Charges

The advanced tenant demands which are due on 01.07.16 have been sent to all leaseholders today.

Top Floor Red Wall

Walton&Allen’s Roaming caretaker has attended site today and wiped down the top floor red feature wall along with the red corridor wall and removed the scuff marks.

WP_20160511_07_35_48_Pro WP_20160511_07_43_51_Pro

WP_20160511_07_42_04_Pro WP_20160511_07_45_57_Pro

Light Replacement

A member of the Walton&Allen Maintenance team has attended site today and replaced any failed emergency lights with LED’s.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Lift Survey

Our lift engineers will be attending site today to carry out a condition survey to the lifts.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site today and carried out a fire panel test.

Upper Block Lift – Lights approx. 4:25pm

Following our comment on 15.04.16, we have contacted the lift company today to ask for an update on the lift. The lift company advised that the parts have been ordered and are due to be delivered within 2-5 working days. Once the parts have been delivered, a lift engineer will return to site to carry out the repair.

Communal Carpets

Following our comment on 13.04.16, Walton&Allen’s Property and Estate Director and Block Management Administrator has met ChemDry on site this afternoon to measure up to provide a quote for the cleaning of the communal carpets.

Upper Block Lift – Lights

Following our comment on 12.04.16, the lift engineers have attended site to try and resolve the issue with the lights. Unfortunately, new light fittings need to be ordered in order to carry out the repair to the lights in the lift. We are currently awaiting an estimated delivery date from the lift company.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Communal Carpets

A member of the Walton&Allen Block Management team has contacted a cleaning company today to obtain a quote for the cleaning of the carpets in the communal areas.

Upper Block Lift – approx. 1:20pm

We are aware that the lights in the lift require attention. This has been reported to lift engineers who will attend as soon as possible.

Hyperoptic Installation

Walton&Allen’s Property and Estate Director has signed off the first stage of the Hyperoptic installation this afternoon.

Fire Panel Training

A member of the Walton&Allen Block Management Team and the Roaming Caretaker has met with our fire contractors PLP on-site today to be trained how to carry out the weekly fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Water Tank & Pump

Sterilizing Services are due on site toady to carry out the water tank and water pump checks.

Bin Store

 

The Roaming Caretaker has attended site yesterday and cleared and cleaned the bin store. Can we please remind residents to keep the bin store area clean and tidy by placing the waste inside of the bins and by using all of the bins provided. Please do not leave waste on the floor (as refuse collectors will refuse to remove waste that has not been placed in the bins) & please break down any boxes rather than leaving them on the floor. Please refrain from abandoning any large bulky items or furniture in the bin store as it is the responsibility of the residents to dispose of these items. 

We would like to remind residents that they can contact Nottingham City Council and arrange a FREE collection of these items. Please note this call must come from a resident of the building, Nottingham City Council do not offer this free service to companies.

Lex Bin

 

Site Visit

The Roaming Caretaker has attended site today to carry out the daily duties for the building. The side alley and steps were also litter picked and cleared on this visit.

Lex Before Lex Before 2

Lex After Lex After 2

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance Team has attended site today to carry out an emergency light test and sweep.

Upper Roller Shutter – WORKING

Following the unfortunate vandalism to the upper shutter resulting in a brand new shutter being required, Walton & Allen obtained quotes and have been working closely with the Directors of Lexington Place Management Company Ltd to discuss the various design options and decide the best design for the building and most cost effective option. The new like for like replacement with painted yellow safety lines was fitted yesterday and left in full working order today. A picture of the new shutter is below:

Shutter

Light Sweep

A member of the Walton&Allen Maintenance Team has attended site to carry out an emergency light sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the fire panel test a day early due to our office being shut on Friday 25th March for Good Friday.

Please contact the office in the event of an emergency and the voicemail will supply you with the current out of hours contact number.

Lower Car Park Shutter – WORKING

Our security contractor has attended site and fitted a new motor and control panel to the shutter. Walton&Allen’s Trainee Property Manage has also attended site to sign off the works. The shutter was left in full working order.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Bulky Waste Removal

City & Country will be attending site today to remove the bulky waste items from the bin store area.

Lexington Before Lexington Waste Removal C&C

 

 

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Upper Block Lift – Out of Order

Unfortunately the upper block lift is currently out of order. This has been reported to our lift engineers who will attend as soon as possible.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Site Visit

A member of the Walton&Allen maintenance team has attended site today and repaired a stack pipe leak that was leaking into the bin store.

Monthly Legionella Checks

Sterilizing Services have attended site today and carried out the communal monthly legionella checks.

Communal Lights

A member of the Walton&Allen Maintenance Team has attended site today to replace the failed lights within the communal areas.

PLP Fire

PLP Fire will be attending site today to carry out the FEB services.

New Roaming Caretaker

A member of the Walton&Allen Block Management team has attended site today with the new roaming caretaker to carry out a walk around inspection and to familiarise the caretaker with the building. The daily duties to be carried out at the building were also explained on this visit.

 

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Lower Block Lift

Following our comment on 19.02.2016, Kone attended site yesterday and replaced the floor indicator module to the ground floor.

Lower Block Lift Repair approx. 11:00am working

Walton&Allen’s Trainee Property Manager has attended site and met the technician who carried out the repair and the area supervisor on site to personally check the repair works carried out.

The new upgraded modification drive unit provides a smoother ride quality, lower noise levels and offers energy savings due the unit going into standby when not in use.

The Ground floor elevator indicator display requires replacing after faulting whilst the lift was isolated. A replacement has been ordered and will be fitted upon delivery.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Emergency Light Test & Light Sweep

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Lower Block Lift Repair – approx. 1pm

Following our comment below, our lift engineers KONE attended site yesterday as planned to install and wire the new drive equipment for the lift. We have only just been advised by KONE today that the repair should take 2 to 3 days to complete (to install the lift and to test and commission the lift) and that a technician will be returning today to hopefully complete the major modification repair.

Lower Block Lift Repair

Following our comment below, our lift engineers KONE are due on site today to carry out the repair to the lift.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Lower Block Lift Repair approx. 1:30pm

Kone have informed us that a Lift Technician should hopefully be attending site tomorrow to fit the new upgraded drive unit. Unfortunately this job can only be completed by a technician rather than an engineer. This appointment will only change if the technician is called out to an emergency.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Email System Back Up & Running

Following our comment below, we can confirm that the Walton&Allen email system is now up and running. We apologise for any inconvenience caused.

Email System Down approx 11:15am

The Walton&Allen email system is currently down until further notice. Our IT providers are currently working to resolve the issue. Please call the office on 0115 924 3304 if your query is urgent.

Lower Block Lift Repair

Following our comment on 05.02.16, the Management Companies Directors have approved the required major repair of the drive unit, therefore we have instructed Kone to go ahead with replacing and upgrading the lift drive unit. The ETA for this part is approx. 5 days so depending on delivery, realistically we are looking at next week for the repair to be carried out as an lift technician is required for this repair, rather than an engineer.

Lower Block Lift Repair

Unfortunately the main drive unit has failed in this lift. The drive unit is basically the motor that drives the whole lift. Without this replacement, the lift cannot run. Unfortunately the current sealed drive unit is obsolete therefore the only option is to fit the new upgraded modification drive unit. Due to the extensive cost of this repair, we have had to send the quote to the Directors of Lexington Place Management Company Ltd (who are our clients) for their approval.

Lower Lift – Out of Order

Following our comment below, Kone Lifts have sent us the repair quote for the lift. Due to the cost of the quote, we will have to send this to the Directors of Lexington Place Management Company Ltd (our Clients) for approval. Before we do this, we are currently in conversations with Kone to confirm details (such as the warranty etc.)  before all of the information is sent to the Directors.

Legionella Checks

Sterilizing Services attended site to carry out their contracted Monthly Legionella checks to the communal facilities.

Lower Block Lift – Out of Order

Following our comment below and Kones attendance on 29th January 2016, we are awaiting a report from Kone on the issue and a resolution.

Fire Panel Test

A member of the Walton&Allen Maintenance Team attended site today and carried out a fire panel test.

Lower Block Lift OUT OF ORDER Approx. 9:00am

We are aware that this lift is out of order. We have reported this to our lift engineers who will attend as soon as possible.

CCTV

Walton&Allen’s Property and Estate Director has attended site and viewed CCTV. They have reported an act of vandalism to the local police.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Bin Store Area

A member of the Walton&Allen Maintenance Team has attended site and cleared the bin area and washed the floor surrounding the bins

Lower car park roller shutter

Following a report from a resident that the shutter is currently out of order, our contractor has attended site and returned the shutter to full working order.

Communal Aerial

Following our comment on the 6th January, CableGuys have returned to site and fitted a new communal dish. If residents are still experiencing problems, CableGuys have advised that you re-boot your box.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Communal Aerial Approx. 11:00am

Following our comment below CableGuys have re-attended site and gained access to the roof. Unfortunately it was not a case of simply realigning the dish as originally thought, a new dish and aerial is required as they have been damaged by the recent bad wind. Parts have been ordered and CableGuys are due to re-attend on Friday 15th January 2016 to fit the new parts.

Sterilizing Services

Sterilizing Services have attended site today and carried out their contracted monthly legionella checks to the communal facilities.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

 

Graffiti Removal

A member of the Walton&Allen Maintenance Team has attended site and removed the graffiti on the door in the car park in the upper block.

Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an Emergency Light test.

Communal Ariel – Upper Block approx. 4:00pm

Following our comment below, CableGuys have attended site and reported back that the communal aerial on the roof will need re-aligning. Due to access restrictions, CableGuys will re-attend on Wednesday 6th January 2016.

Communal Arieal – Upper Block

Following reports from residents that they are experiencing problems with their TV signal, our contractors CableGuys have been instructed to investigate this issue in the communal areas.

Fire Panel Test

A member of the Walton & Allen maintenance team has attended site on 29.12.15 & carried out a fire panel test.

Lower Block Door

Following our comment on the 30th November, Edwards Metal Windows have attended site and re-glazed the panel on the lower block door.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Lower Block Front Door

We are aware that one of the panels on the lower block door requires re-glazing, we have instructed Edwards Metal Windows who will attend on Friday 4th December.

Light Test

A member of the Walton&Allen Maintenance team has attended site and carried out an emergency light test and light bulb sweep of the communal areas.

Salt/Grit

A Walton&Allen operative has attended site today and filled the grit bin(s) on site.

Please note it is responsibility of residents to distribute where necessary.

2016 Budget

The 2016 budget and 1st half year tenant demand (1st January 2016 to 30th June 2016) due 1st January 2016 has been sent to all leaseholders today.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Site visit

Following our comment on the 23d October Walton&Allen’s Trainee Property Manager and our Maintenance & Contracts Manager has attended site to inspect the redecoration works carried out to the Upper Block.

Site Visit

A member of the Walton&Allen Block Management Team has attended site today and carried out a walk around with the new roaming caretaker.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Water tank check

Sterilizing Services are due on site today to carry out a service visit to the water tank/pump.

Investigations

Maintenance Manager and Property Manager carried out investigations on behalf of the police in relation to clamping down Anti-social behaviour at the block.

Redecoration

A member of the Walton&Allen maintenance team has attended site and carried out touch up paint works throughout the building.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

NEW APP!

Check out our new free App!

Keep updated as to what’s happening at your building through this Notice Board. The App has many features, including Sat Nav to help people find your building. Whether it be friends, family or delivery companies, all can download the App to their smartphone or tablet – and it’s completely free.

Simply go to www.waltonandallenapp.co.uk and download it.

 

app app2 app3 app4

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Site Inspection

A member of the Walton&Allen Block Management Team have attended site today and carried out a walk around inspection.

Service Visit

Our fire contractors PLP are due on site today to carry out service visit.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Window Cleaning

Following our comment on 03.06.16, all accessible external windows will be cleaned on 23.09.15, 24.09.15 & 25.09.15, weather permitting. In order for this to be carried out, please ensure that during this time frame your windows remain closed and locked.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today to carry out a fire panel test.

Fire Alarm Test

A member of the Walton&Allen maintenance team has attended site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a routine fire panel test.

Window Cleaning

Today we have instructed our cleaners to clean the windows at Lexington Place. We are currently awaiting a date from them when they can attend.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire Panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Please contact Walton & Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

Fire panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Water Tank Check

Sterilizing Service’s have attended site today and carried out their bi-annual tank check.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Tests

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Lower Lift

Following our comment below a lift technician attended site today and parts are on order which should improve reliability to the lift. We have requested they keep us updated when the parts will be delivered and when they can return to site to fit the parts.

Upper Block Lift

Following our comment on the 15th of May the lift Technician is due on site today  to assess the lift operation and hopefully find a solution to the continuous breakdowns.

Emergency light test

A member of Walton&Allen Maintenance team is due on-site today to carry out an Emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Upper Block Lift.

Due to the constant breakdowns in the last 6 months with no explanation provided, we emailed the head office of our lift company on the 07.05.15 to express our concerns.

We have received a reply today informing us that a lift technician (rather than an engineer) has been booked in to attend site on Tuesday 19th May to assess the lift operation and hopefully find a solution.

Please contact Walton&Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

  • - message archive

    8th May 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    5th May 2015 Approx. 2.30pm – Upper Lift WORKING

    Following our comments below, our lift engineers have attended and the lift has been returned to working order. Unfortunately no fault was found.

    5th May 2015 Approx. 1pm – Upper Lift

    Our lift engineers are on-site.

    5th May 2015 Approx. 12:45pm – Upper Lift OUT OF ORDER

    We are aware that this lift is out of order and have reported it to our lift engineers for their urgent attention.

    1st May 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    24th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    23rd April 2015 – Refuse Bins

    An additional bin should be delivered to site tomorrow as clearly 6 bins are not sufficient for the site.

    21st April 2015 – Communal decorating

    W&A Maintenance manager has attended site today to check the progress of the communal decorating.

    20th April 2015 – Communal decorating

    Our decorating contractors are on site re-decorating the Walls in the communal areas. They are scheduled to be on site for the 2 days.

    17th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    10th April 2015 – A W&A operative has attended site today and carried out a litter pick of the car parks and removed any leaflets/flyers from the post room.

    10th April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    8th April 2015 – A W&A operative has attended site and secured the lock from the Mail Room to the Lower Car Park.

    7th April 2015 – A W&A operative has attended site today and carried out a litter pick of the car park and swept the bin area.

    2nd April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    20th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    18th March 2015 – A member of W&A maintenance team is due on site today to carry out a light bulb sweep of the communal areas.

    16th March 2015 – A member of the W&A maintenance team has attended site and carried out the following:

    • A Fire panel test
    • Repaired a hanging light reported near apartment 41.

    10th March 2015 – A member of the W&A maintenance team has attended site today and replaced 3 failed Emergency lights in the lower block.

    6th March 2015 – A member of W&A maintenance team is due on site today to carry out the following:

    • a Fire Panel test.
    • Replaced a failed emergency light with a new LED Emergency Light.

    3rd March 2015 – Bulky Waste Disposal

    May we remind residents to not abandon large/furniture items in the underground car park. Not only is this causing issues with items being placed in peoples parking spaces but these items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    3rd March – Lower Lift WORKING

    Following our comment on 27th February 2015, our lift engineer has attended site and replaced the lift lighting therefore returning the lift to working order.

    2nd March 2015 A member of W&A Maintenance team has attended site today and carried out an emergency light test & light bulb sweep of the communal areas.

    27th February 2015 – Lower Lift OUT OF ORDER

    Following our comments below, our lift engineers attended at approx. 3:10pm yesterday. Unfortunately due to the size of the light fittings they have had to order these in. The lift has been isolated for health & safety reasons until they receive the new lights. The ETA for their re-attendance is early next week.

    27th February 2015 A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    26th February 2015 Approx. 10:30am – Lower Lift Lights

    Following our comment below, our lift company have advised us that an engineer should be on-site within 4 hours.

    25th February 2015 – Lower Lift Lights

    We are aware that the lower lift lights are unfortunately out. We have reported this to our lift engineers who shall attend ASAP.

    25th February 2015 – Our fire contractors are due on site today to carry out a routine maintenance service visit.

    23rd February 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    20th February 2015 – A member of W&A maintenance team is due on-site Monday 23rd February 2015 to carry out a Fire Panel test.

    16th February 2015 – Following the vandalism to the lower block car park door our door contractor has been on site for the majority of the afternoon repairing/re-securing this door.

    13th February 2015 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    13th February 2015 Approx. 4pm – Upper Block Lift WORKING

    Following our comment below, our lift engineers have attended site and returned the lift to working order. A member of the Block Management team has also attended site to test the lift, which was in full working order.

    12th February 2015 Approx. 3:30pm – Upper Block Lift OUT OF ORDER

    A resident has kindly reported that unfortunately the lift has gone down again. We have reported this to our lift engineers and ask that they attend ASAP. We have also asked them to look into why this lift is faulting so regular.

    11th February 2015 A member of W&A’s maintenance team has attended site today and replaced the bulb to the U/G lift foyer light. They have also carried out an emergency light test and light bulb sweep of the communal areas, replacing bulbs as required. They do however need to return to site this week to replace some emergency light starters.

    11th February 2015 Approx. 3:30pm – Upper Block Lift WORKING

    Following our comment below, our lift engineer has attended site this morning and returned the lift to working order. A member of W&A Block Management team has attended site to test the lift, which was in working order.

    10th February 2015 – Upper Block Lift OUT OF ORDER

    A resident has kindly informed us that unfortunately this lift is out of order. We have reported this to our lift engineers and asked that they attend ASAP.

    6th February 2015 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    2nd February 2015 – Bulky Waste Disposal

    May we remind residents to not abandon large/furniture items in the underground car park or bin area. These items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on 0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    30th January 2015 – Refuse Bins

    An additional bin has been ordered for site as clearly 6 bins are not sufficient for the site. Nottingham City Council have not provided us with an ETA for this bin as of yet.

    30th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    16th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    9th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th January 2015 If you have any building concerns or issues that you would like to discuss or report, Please contact Walton and Allen on 0115 924 3304.

    5th December 2014 A member of W&A Maintenance team has attended site today and carried out an emergency light test & light bulb sweep of the communal areas.

    2nd December 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    31st December 2014 Approx. 9:00am -Upper Block lift

    Following our comment below the lift engineers have attended site first thing this morning and returned the lift to full working order.

    30th December 2014 Approx. 2:50pm – Upper Block Lift

    A Resident has kindly informed us that this lift is unfortunately out of order. We have reported this to our lift engineers who shall attend ASAP. Due to the festive period, we asked that they mark this as high priority.

    23rd December 2014  Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    23rd December 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test.

    19th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    10th December 2014 A member of W&A Maintenance team is due on site today and carried out an emergency light test & light bulb sweep of the communal areas.

    5th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    5th December 2014 – Upper Block (Block A) Lift

    Following our comment below our lift engineers returned to site fitted the required part and returned the lift to full working order.

    3rd December 2014 Approx. 1:15pm – Upper Block (Block A) Lift

    Following our comment below, our lift engineers attended site this morning at approx. 9:45am. The lift was left isolated by our lift engineers as a part is required. The ETA for this part is tomorrow.

    3rd December 2014 Approx. 8:45am – Upper Block (Block A) Lift OUT OF ORDER

    We are aware that this lift has unfortunately gone down again. We have reported this to our lift engineers who will be on-site ASAP.

    2nd December 2014 Approx. 10am – Upper Block (Block A) Lift WORKING

    Following our comment below, our lift company has advised us that their engineer returned to site yesterday at approx. 3:45pm and returned the lift to working order.

    1st December 2014 Approx. 2pm – Upper Block (Block A) Lift

    Following our comment below, we have been informed that our lift engineers attended site today and left site at approx. 1:20pm with the lift in working order. A member of W&A has just attended site to test the lift and found the lift in non-working order. We have reported this to our lift company and asked them for a recall visit to attend to this issue urgently.

    28th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

    27th November 2014 Approx. 2pm – Upper Block (Block A) Lift OUT OF ORDER

    Residents have kindly informed us that this lift is unfortunately out of order and not responding. We have reported this to our lift engineers and asked that they attend ASAP.

    24th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

    14th November 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test

    13th November 2014

    A member of W&A Maintenance team has attended site today and carried out an emergency light test & light bulb sweep of the communal areas.

    11th November 2014 A member of W&A Maintenance team has attended site today and replaced the light near flat 32 in the upper block.

    7th November 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    31st October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    24th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    21st October 2014 Approx. 3pm – Upper Block Lift WORKING

    Following our comment below, our lift engineers have attended site and returned the lift to working order.

    20th October 2014 Approx. 11:30am – Upper Block Lift OUT OF ORDER

    We have been informed that this lift has unfortunately gone down. We have reported this to our lift engineers who will attend as soon as possible.

    20th October 2014 – Upper Roller Shutter

    Our Roller Shutter contractor has attended site and returned the upper car park Roller Shutter to working order.

    20th October 2014 Following our comment below, a member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    17th October 2014 The fire panel test will be carried out on Monday 20th October instead of today.

    14th October 2014 Approx. 1pm – Upper Block Lift WORKING

    Following our comment below, our lift engineers have attended site and returned the lift to working order.

    13th October 2014 Approx. 11:25pm – Upper Block Lift OUT OF ORDER

    We have been informed by a resident that this lift is unfortunately out of order. This has been reported to our lift engineers who will attend ASAP.

    13th October 2014 A member of W&A Maintenance team is due on-site today carrying out lighting repairs.

    10th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    8th October 2014 Sterilizing Services are due on-site today to complete their contracted water tank check.

    3rd October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    26th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    16th September 2014 – Lower Lift WORKING

    Following our comment below, our lift engineers have informed us that the lift has been returned to working order.

    12th September 2014 Approx. 12.45pm – Lower Lift OUT OF ORDER

    We are aware that this lift is out of order and stuck on ground floor with the doors open. We have reported this to our lift engineers who will attend as soon as possible.

    12th September 2014 – Window Cleaning

    All accessible external Windows will be cleaned w/c 15th September 2014, weather permitting.

    In order for this to be carried out, please ensure that during next week your windows remain closed and locked.

    Thank you for your co-operation.

    12th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    5th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    29th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    27th August 2014 A member of W&A maintenance team is due on-site today to carry out an emergency light test & light sweep of the communal areas.

    22nd August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    20th August 2014 A member of W&A Maintenance team is due on-site today to complete light replacements/repairs.

    15th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    14th August 2014 A member of W&A Maintenance team is on the roof today clearing the gutters.

    11th August 2014 A member of W&A maintenance team is on-site making repairs to the guttering following the heavy downpour of rain during the weekend. Our operative may have to access certain balconies but a notice has been sent to any residents that this would affect.

    8th August 2014 A member of W&A maintenance team is due on-site today to carry out:

    •   A Fire Panel test
    • Emergency Lighting repairs

    6th August 2014 A member of W&A is due on-site today to carry out a walk around inspection.

    1st August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    30th July 2014 A member of W&A is due on-site today to carry out a walk around inspection.

    28th July 2014 Following our comment on 17th June, we have been informed that the perpetrator admitted to all crimes and has been sentenced to 22 weeks in Prison.

    25th July 2014 Approx. 10:45am W&A’s Block Manager has just had a meeting with the Police on-site. The Police will now be carrying out walk around patrols in the building.

    25th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    25th July 2014 Our fire contractors PLP are on-site today to carry out their contracted Fire Alarm & Emergency lighting service visit.

    23rd July 2014 A member of W&A is due on-site today to carry out a walk around inspection.

    22nd July 2014 A member of W&A maintenance team is due on-site today to carry out an emergency light test & light sweep of the communal areas.

    18th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    17th July 2014 Following our comment on 10th July, members of W&A maintenance team are on-site today finishing the decoration to the entrance lobbies.

    16th July 2014 A member of W&A has attended site this morning and carried out a walk around inspection.

    15th July 2014 – The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date, and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please scan the barcode located throughout our apartment blocks or visit www.waltonandallenapp.co.uk. You can also download this app for FREE from the Apple or Google Play Stores.

    11th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    10th July 2014 Members of W&A Maintenance team are due on-site this afternoon to start painting the entrance lobbies.

     4th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    1st July 2014 The second half year (1st July 2014 – 31st December 2014) Service Charge is due today.

    27th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    26th June 2014 A member of W&A maintenance team is due on-site today to carry out an Emergency Light test.

    20th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th June 2014 Approx. 3:30pm – Lower Block Lift WORKING

    Following our comments below, our lift engineer has attended and the lift was left in working order.

    19th June 2014 Approx. 11am – Lower Block Lift

    Following our comment below, our lift engineer is on-site now. Another lift engineer is currently on their way to site to assist them.

    18th June 2014 Approx. 1pm – Lower Block Lift OUT OF ORDER

    We are aware that the lower block lift is unfortunately out of order. We have reported this to our lift engineers who will attend as soon as possible.

    17th June 2014 Approx. 12:30pm Contractors are on-site replacing the glass to the lower and upper car park doors following criminal activity and vandalism.

    17th June 2014 – Robbery Foiled by Walton & Allen Employees

    Unfortunately a car thief attempted to attack Lexington car park yesterday (16.06.14) at approx. 5:00pm.

    Due to the car park being secure the disorientated suspect became trapped in the car park but unfortunately caused damage to several doors but no cars or bikes were stolen due to W&A’s Maintenance manager and operative interfering.

    W&A managed to catch a criminal in the act, view the CCTV, chase the suspect and our operative did a citizens arrest all within 30mins.

    Due to the HD quality of the footage showing the suspect causing criminal damage to the door and looking into car windows, the police arrested him, held him in custody and are looking to charge him for several types of crimes including criminal damage and assault on our operative and members of the public.

     

    13th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    10th June 2014 Our cleaners are scheduled to carry out a car park clean today.

    9th June 2014 Approx. 12:45pm Our cleaners are on their way to site to tidy up the bin area.

    5th June 2014 A member of W&A Maintenance team is due on-site today to make further security improvements to the car park fire exit.

    3rd June 2014 A member of W&A maintenance team has attended site today and carried out the following:

    • Emergency light test & light sweep of the communal areas
    • Repaired the lower shutter push button

    3rd June 2014 Our cleaners will be carrying out a full car park clean on Tuesday 10th June 2014.

    30th May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    29th May 2014 A member of W&A maintenance team is due on-site today making repairs to car park doors.

    23rd May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th May 2014 – CCTV

    W&A Block Manager met the police on-site this afternoon to provide footage of the trespassing and vagrants attacking the bin stores.

    19th May 2014 – Door Release

    Our Security contractor has attended site to reset the upper block mag lock as residents have used the break glass instead of the button to exit. A Sign has been erected to prevent this.

    16th May 2014 Sterilizing Services have attended site and carried out a water tank clean.

    16th May 2014 Mag lock to be fitted to the upper entrance door.

    15th May 2014 CCTV footage taken of suspected person who has been attacking the bin stores. This incident has been reported to the police. CCTV footage also used to highlight incorrect disposal of waste in the building and individuals involved spoken too

    14th May 2014 Security contractor on site to repair upper shutter. Parts ordered so repair can be completed on the 16th May 2014

    14th May 2014 CCTV INSTALLATION IN CAR PARK COMPLETE

    13th May 2014 Internal Light sweep carried out by W&A.

    12th May 2014 CCTV INSTALLATION STARTED

    AST have started the installation of the CCTV system at Lexington Place. If you park a car in Bay 40, 41, 11 and 4 please contact Matt Pearson from AST on 07718913458, as they will need to carry out some works around your car parking space and would like to know a time when they can carry these out without the car being in the space

    9th May 2014 Weekly fire check carried out by W&A.

    9th May 2014 – Lower Block Lift WORKING

    Following our comment below, our lift engineers have attended site and the lift was left in working order.

    8th May 2014 – Lower Block Lift OUT OF ORDER

    A resident kindly reported at 9:00am that this lift is unfortunately down. We had a W&A operative on-site for 10am but could not fix the issue therefore we have reported this to our lift company who will attend site ASAP.

    8th May 2014 Repair carried out to Lexington closer on the door from the lower block to the car park.

    7th May 2014 Upper block front door had combi locks added to the main door. This repair has been carried out so a mag lock can be fitted to the main door so that it automatically closes when shut to increase security. Please make sure that all doors in the block are closed to when you enter and exit the property to increase security

    6th May 2014 Block Manager and security contractor met on site to agree the installation and placements of the CCTV system at Lexington. Installation date TBC in the next few days.

    2nd May 2014 Water tank clean to be carried out on Thursday 15th May 2014

    2nd May 2014 CCTV Improvements

    The Directors are pleased to announce that instruction has been given to install CCTV at the building. A date for the completion of these imporvements is TBC

    2nd May 2014 Adjustment made to the closer of the main access door to the higher block. Please be vigilante and close all doors behind you and do not allow anyone suspicious into the building

    28th April 2014 6 monthly water tank checks and pump service carried out by our contractors

    28th April 2014 Sterilizing Services are due on-site today to carry out the contracted water tank and pumps service visit.

    25th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    23rd April 2014 A member of Walton & Allen is due on-site today to complete an emergency light test.

    17th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    16th April 2014 The following letter has been put on each notice board and hand delivered to all residents today:

    Lexington Place Management Letter – Please do not ignore

    Housekeeping

    Please can all residents use the bins for disposing of waste items, this means placing the waste in the bins and not just dumping the waste items in the bin area as refuse collectors often refuse to dispose of any waste that is not in the actual bins. Large items like cardboard boxes need to be broken down. We recommend that electrical items are not thrown away in the bins but taken away to a waste site.

    The cleaners believe that due to the type of rubbish, items not being flattened down and items being left in the bin area rather than the actual bins, that it is attracting vagrants to attack the bin store. We may consider putting a combination lock on the bin area but at this moment in time we are wary of doing this due to a minority of residents who do not dispose of their rubbish responsible and correctly and we are concerned that rubbish will be left in front of the bin area if the code is lost etc.

    If over the next month or so we see an improvement of rubbish being disposed of and can trust all residents to throw it within the bins, we will look at a combination lock on the bin store.

    By carrying out these actions you are adding to the problem. Please take pride in the place you live and place rubbish correctly in the bins.

    Security

    We have a tailgating problem at the building. Please be vigilant of who you allow access to the building. Do not allow people to tailgate you as if a visitor is legit they will know the contact number for the resident they are visiting or their flat number in order to contact them and gain access via the intercom.

    Please make sure that the door is closed when entering and leaving the building as we have found evidence of the doors being tampered with so that they remain open. Please stop this type of behaviour as it is severely reducing security to the building.

    We are currently carrying out a full review of security of the building which includes CCTV being installed throughout the building within the next few months. This will help deter potential crime but the building also needs an improvement in the security awareness of the residents. If you do see any suspicious characters please report these to the local police number of 101 unless it is an emergency then call 999.

    Residents must stop using the fire exit in the car park as a way of entering and exiting the building. This is only to be used in the event of a fire.

    Parking

    A minority of residents are abusing the car parking at the building. Please make sure you park in your allocated space. To find out if you have an allocated space, please check your tenancy/lease agreement or check with your letting agent and if you do have a parking space your number should correlate with your flat number. We do not want to bring in more restrictive parking measures but ourselves and the Directors are under increasing pressure due to some resident’s lack of respect for people’s parking spaces.

    If you have an individual problem with someone parking incorrectly please inform Walton & Allen on 0115 9243304.

    Noise & Antisocial Behaviour

    We have recently had an increase in noise complaints. We always recommend that Residents call 101 at the time of the incident and email the details over to Walton & Allen so that they can investigate. In some of our other buildings that we manage in Nottingham these incidents have even lead to the police being involved due to being able to trace the whereabouts of the noise after the event.

    May we please ask that you respect your neighbours and keep the noise down during unsociable hours.

     

    11th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    9th April 2014 – Lower Block Lift

    Following our below comment, our lift engineer has attended site and resolved the lift issue. The lift was left in working order.

    8th April 2014 Approx. 9.45am – Lower Block Lift

    We are aware that the Lower Block Lift is unfortunately out of order and stuck on 1st floor with the doors closed, not responding. We have reporting this to our contracted lift company who will attend site ASAP.

    4th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    1st April 2014 – The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please scan the barcode located throughout our apartment blocks or visit www.waltonandallenapp.co.uk where you can email or text a link to your phone.

    31st March 2014 Approx. 3:20pm A member of Walton & Allen maintenance team has just attended site and:

    • Replaced the bulb in the light outside the lift on lower ground floor in the upper block.
    • Resolved the issue with the upper block main door not shutting.

    28th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    25th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a light test & light sweep of the communal areas.

    14th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    14th March 2014 Following our comment below and obtaining parts, a member of Walton & Allen maintenance team has repaired the corridor light by apartment 53.

    11th March 2014 A member of Walton & Allen maintenance team is on-site this morning to:

    • Attend to a corridor light that is out by apartment 53
    • Access an apartment that may be causing a leak above space 26 in the upper car park

    10th March 2014 Approx. 9.00am – Abandoned Items

    Our removal contractor is on-site to remove ALL of the abandoned items in the bin area.

    May we remind residents to please dispose of unwanted bulky items rather than dumping them in the car park. The Nottingham City Council will collect these free of charge if a resident phones them on 0115 915 5555.

    7th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    6th March 2014 – Abandoned Items

    We have arranged for a contractor to remove ALL of the abandoned furniture items in the bin store on Monday 10th March 2014.

    May we remind residents to please dispose of unwanted bulky items rather than dumping them in bin store. The Nottingham City Council will collect these free of charge if a resident phones them on 0115 915 5555.

     

    4th March 2014 Following a member of Walton & Allens Block Management team visiting site on Friday 28/02/2014 it was noted that several lights were out in the communal areas. A member of Walton & Allen maintenance team is on-site today replacing lighting.

    May we urge residents to please report issues like this to Walton & Allen via our new app or by phoning 0115 9243304.

    3rd March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    21st February 2014 Approx. 3pm – A Member of Walton & Allen maintenance team has been on-site to fill in the hole in the wall outside the lift on ground floor which residents have damaged. We will return to site next week to apply another coat of filler, finish & paint.

    21st February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    7th February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    31st January 2014 A member of Walton & Allen maintenance team is due on-site on Monday to carry out a Fire Panel test.

    30th January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    24th January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    23rd January 2014 Colt is due on-site this morning to complete their contracted smoke vent service visit.

    20th January 2014 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    3rd January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    23rd December 2013 On Friday 27th December 2013, A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    20th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    18th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a light sweep of the communal areas.

    16th December 2013 A member of Walton & Allens Block Management team is due on-site this morning to carry out a site inspection.

    13th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    6th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    6th December 2013 approx. 12:30pm Lower Car Park Roller Shutter

    Following our comment below, the roller shutter has been fixed and returned to working order for the weekend.

    6th December 2013 approx. 11am – Lower Car Park Roller Shutter

    Our gate contractor is currently on-site fitting the required part and making repairs to the lower car park roller shutter following someone unfortunately damaging it by driving into it.

    2nd December 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    29th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    27th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency lighting test.

    22nd November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    21st November 2013 Our cleaners will be sweeping the car parks today to clear litter and leaves.

    20th November 2013 A member of Walton & Allen maintenance team is on-site today replacing out of order lights in both blocks. They will also be fixing the damaged car park door that leads from upper block to the car park.

    19th November 2013 A member of Walton & Allen maintenance team is due on-site today to investigate a possible stack pipe issue.

    18th November 2013 A member of Walton & Allens Block Management team is due on-site this morning to carry out a site inspection.

    15th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    11th November 2013 – Car Park Gates

    At approx. 11am today we were informed that both car park gates were stuck in the up position. We immediately reported this to our gate engineer and by 11:40am both of these gates were back in working order. The problem was caused by condensation on the reflectors.

    8th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    1st November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    30th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency lighting test.

    25th October 2013 A member of Walton & Allen is due on-site today to carry out a Fire Panel test.

    23rd October 2013 – Security

    We would appreciate it if residents would help improve security at the building by not letting anyone suspicious follow or tail gate you into the building. If you do, then call the police immediately on 101.

    Please do not hold the doors open for any people entering the block as all residents require a fob and any guests can contact the person they are visiting via their personal intercom.

    Please do not use the car park roller shutter as a way to enter or exit the building on foot. This increases chances for vagrants to tailgate you.

    14th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    11th October 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    8th October 2013 Following our comment below, a member of Walton & Allen maintenance team is on-site again today to apply the final coat of emulsion over the old stains on the 4th floor ceiling now that the stain block has been applied.

    7th October 2013 A member of Walton & Allen maintenance team is on-site today to stainblock the 4th floor ceiling and emulsion the old stains. They will also be clearing out the bin store of abadoned items.

    7th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a light sweep of the communal areas.

    4th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    3rd October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    2nd October 2013 A member of Walton & Allen maintenance team is on-site today carrying out a light sweep, attending to the car park door handle and to the carpet at the upper block main entrance which is raised.

    2nd October 2013 A member of Walton & Allens Block Management team is on-site today to carry out a site inspection.

    1st October 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    4th September 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency lighting test.

    3rd September 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    30th August 2013 Lotus Care are on-site today carrying out their contracted major service visit on the Fire Alarm system.

    30th August 2013 A member of Walton & Allen maintenance team is on-site today finishing off replacing failed emergency lighting with new 28watt fittings and 28watt emergency gear trays.

    21st August 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    9th August 2013 – The buildings external windows will be cleaned on Tuesday 13th August 2013 & Thursday 15th August 2013. Please ensure that on these days, your windows remain closed and locked.

    2nd August 2013 Fire Panel Update – Lotus have been on-site today to programme and attached the new smoke detector head. They have reset and tested the panel.

    26th July 2013 Fire Panel Update – Following our comment on 18th July 2013, Lotus are still waiting on the head detector part to arrive which is unfortunately taken longer than expected due to the fact this part is not off the shelf.

    24th July 2013 A member of Walton and Allen maintenance team is on-site today carrying out installations of new emergency lighting.

    18th July 2013 Following our comment below, Lotus was on-site yesterday as planned. They have informed us that the head detector requires replacement. They have ordered this new part, along with some spares as these parts are not off the shelf, which is due to arrive tomorrow. Dependant on delivery they will return to site as soon as possible.

    Another engineer from Lotus is on-site today to try and stop the panel printing off fault receipts in the meantime.

    16th July 2013 We are aware that there is a fault showing on the fire panel resulting in it printing off fault receipts. We have reported this to our fire systems contractors who plans to attend tomorrow.

    12th July 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    9th July 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a emergency light test.

    1st July 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    11th May 2013 We are aware that someone has dumped several furniture items in the bin store which has caused the bins to overflow. We are in the process of arranging these items to be removed.

    31st May 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a fire panel test.

    23rd May 2013 Lift in Upper Block/Block A

    Following our comment below, this was a false alarm and all is well. When the resident reported that the lift was down, it was because the engineers were on-site changing the lighting in the lift so they had to temporary turn the equipment off while they carried out this out. We can confirm that the lift is in full working order.

    22nd May 2013 Lift in Upper Block/Block A

    Following our below comment, although the lift was up and running, a resident has reported that the lift is unfortunately down again so the lift repairs have not lasted. We will update you with further updates once we have spoken to the lift engineers.

    22nd May 2013 Lift in Upper Block/Block A

    We are happy to announce that the lift engineers have confirmed that they have completed the final works, the lift is back in working order and has been running for the last couple of hours.

    20th May 2013 Out of Order Lift in Upper Block/Block A

    Following our below comments you will know that over the last few weeks, the lift engineers – Kone, have experienced a number of problems in obtaining both correct and complete parts in order to finish the lift repair. This has been extremely frustrating to all and Kone are aware that their service has been incredibly unsatisfactory.

    Following a number of negotiations with Kone, they have committed to re-attending with the correctly programmed drive unit today and tomorrow.

    Understandably this has and continues to be a very difficult situation for residents to endure and I assure you that we continue to work hard through these problems in order to bring the lift back into working order for residents. We thank you for your continued support in helping us do this.

     

    13th May 2013 Out of Order Lift in Upper Block/Block A – Following the site attendance throughout last week, the lift engineers have advised that the drive unit is incorrectly programmed.  This means that the final stage of the work to the lift cannot be completed until this week when they resolve the issue.  Walton & Allen may find the instruction in need of review should the matter not be resolved within this week.

    10th May 2013 A member of Walton and Allen maintenance team is due on-site today to carry out a fire panel test.

    8th May 2013 Out of Order Lift in Upper Block/Block A – A lift engineer had been on site today and the work will be continued tomorrow. The lift is expected to be back in working order by tomorrow (9th May)

    3rd May 2013 Out of Order Lift in Upper Block/Block A – The lift contractor was on-site Wednesday and Thursday of this week. They have carried out part of the works required in order to fit the upgraded element however due to an incomplete parts package delivered by the supplier, the upgrade could not be fully completed. Once the electrification board and lift brake connection arrives with the contractor early next week, they will attend site immediately to fit these remaining parts.

    26th April 2013 – upper block/block A Lift – following our comment below, we have received approval from the directors to go ahead with the works required to fix the lift. we have today instructed our lift company to go ahead with these works. They have ordered the required upgrade parts today and confirmed the delivery lead time of approx 2-3 days. The lift should be fixed by the end of next week subject to delivery of parts. we would like to thank you for your patience and cooperation on this matter.

    22nd April 2013 Out of Order Lift in Upper Block/Block A – Following our below comment, unfortunately the lift company have been forced to withdraw the original quote that we sent out to directors for approval. This is because they wrongly identified the equipment which their original quote was based on and following a site visit by their engineer have found that the equipment in place is a much earlier version of the unit than first thought, therefore requiring different parts to be ordered and fitted. They have provided us with a new revised quote which has been sent out to all of the directors asking for their approval.

    8th April 2013 Out of Order Lift in Upper Block/Block A – We received the quote from our lift company late today. The main driver unit has failed and requires replacement. The drive is a major component and the current unit is becoming obsolete. Due to the cost, we have had to email all of the directors, attaching the quote, and asking them for their approval.

    8th April 2013 Sterilizing Services are due on-site today to carry out the routine checks on the water tank and water booster pumps.

    5th April 2013 Out of Order Lift in Block A – Following our comment below. We have chased the lift company, who have informed us that parts are required for the lift and a quote will be sent to us for the repair. Unfortunately no further details have been explained to us as all will be explained on the quote. We will update you when we have further information.

    5th April 2013 With regards to the Lift in Block A, the lift engineers attended yesterday at approx. 2.00pm. We have been informed today that the lift is out of order. We have contacted the lift company who will get back to us once they have spoken to the lift engineer to find out if they are waiting on a part etc.

    5th April 2013 A member of Walton and Allen maintenance team is on-site today to check/fit door stops throughout the building.

    4th April 2013 Following our comment below, we have chased our lift engineers Kone and they have informed us that an engineer is scheduled to attend site today for the Lift in Block A.

    3rd April 2013 We are aware that the lift in Block A is down. We have reported this to our lift engineers, Kone, who will be on-site as soon as possible.

    25th March 2013 A member of Walton and Allen maintenance team is due on-site today to carry out an emergency lighting and fire panel test.

    13th March 2013 A representative of Walton and Allen is due on-site today to carry out a walk around inspection.

    12th March 2013 Colt are due on-site today to service the smoke vent control system.

    25th February 2013 If you have any building concerns or issues that you would like to discuss or report, please contact head office on 0115 924 3304 one of our team members will be happy to help.

    6th February 2013 Following our comment below, Cable Guys did return to site Monday 4th February and fitted the required parts.

    1st February 2013 As we have had several reports of peoples Freeview is not working, we arranged for Cable Guys to attend today. There is a problem with a device that feeds the signal to certain apartments but not all apartments have been affected. New parts are required which are on order. Cable Guys should hopefully be returning to site on Monday 4th February to fit these parts. In the meantime the engineer has suggested retuning your box.

    23rd January 2013 If you require a meter reading, please contact head office on 0115 924 3304.

    15th January 2013 Please contact Walton and Allen on 0115 924 3304 if you have any issues with the building that you would like to discuss or report.

    11th January 2013 A Walton and Allen maintenance engineer is due on-site today to carry out a fire panel test.

    9th January 2013 We are aware that one of the lifts is stuck on ground floor with the doors open. We have reported this to our lift engineers, Kone Lifts, who will be on-site as soon as possible.

    4th January 2013 Please see the following link for free removal of your Christmas tree through Nottingham City Council: http://www.nottinghamcity.gov.uk/index.aspx?articleid=20361

    4th January 2013 A Walton and Allen maintenance engineer will be on-site today to carry out a fire panel test.

    3rd January 2013 – We are aware that the bins have not been emptied this week. Walton and Allen have contacted Nottingham City Council who have apologised for the delay, caused by Christmas and Bank holidays. A collection has been arranged and refuse will be collected within the next 2 – 3 days’ including Saturdays. We apologise for the inconvenience but ask that you dispose of your rubbish sensible. If the bins are full, please leave all bin bags within the confines of the bin area only, ensuring that they do not obstruct doorways or exits. We would appreciate it if you would try and keep the bin lids shut in the down position as it is a fire hazard if they are left up and open.

     

    12th December 2012

    IMPORTANT NOTICE

    External Decorating Works.

    You will be aware Walton & Allen decorating contractors have been working on the Barker Gate (rear) elevation of Lexington Place painting the windows and patio doors.

    These works are due to be completed by next Wednesday 19th December.

    If your apartment is in the Upper Block No’s 7, 14, 15, 16, 17 & 24 and Lower Block No’s 35, 37, 40, 41, 45, 46, 50, 51 & 56 your apartment windows and balcony doors have not been painted you need to URGENTLY contact our office to arrange a time.

    Our decorators are working from 7:30am to 3:00pm on this Saturday and Sunday (weather permitting) to complete the works to apartments who tenants aren’t around during the week, these works are now a matter of urgency as the decorating works will be finishing next week and the scaffolding will be coming down shortly after, once this has happened your apartment will be left unfinished.

    To carry out the works you will need to leave the windows and patio doors slightly open so they can produce a neat finish and to stop them being painted over which will make them difficult to open once this has been done.

    If you have a patio door with a metal balustrading panel in front could you please move any furniture or fittings from the front of the patio doors so we can open them to gain access to paint the inside face of the metal panels.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient and help our contractors whilst the works are being carried out.

     

    4th December 2012 If you require a meter reading, please contact head office on 0115 924 3304.

    29th November 2012 IMPORTANT NOTICE – External Decorating Works

    You will be aware Walton & Allen decorating contractors are working on the external elevations of Lexington Place building.

    They are now working on the Barker Gate (rear) elevation of the building and will be painting the windows and patio doors.

    This means we require you to leave the windows and patio doors slightly open so they can produce a neat finish and to stop them being painted over which will make them difficult to open once this has been done.

    If you have a patio door with a metal balustrading panel in front could you please move any furniture or fittings from the front of the patio doors so we can open them to gain access to paint the inside face of the metal panels.

    These works will take place between the hours of 7:30am and 5:30pm during Monday to Friday and may also be carried out at the weekend.

    This notice applies to the following apartments:

    5, 6, 7, 8, 14, 15, 16, 17, 22, 23, 24, 25, 30, 35, 36, 37, 40, 41, 42, 45, 46, 47, 50, 51, 52, 55, 56, 57 & 60

    If you have any questions, please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient and help our contractors whilst the works are being carried out.

     

    27th November 2012 Please contact Walton and Allen on 0115 924 3304 if you have any issues with the building that you would like to discuss or report.

    20th November 2012 – External Scaffolding & Decorating Works

    As you are aware Walton & Allen scaffolding and decorating contractors have been working on the external elevations of Lexington Place building over the last few weeks.

    On Thursday 22nd November our scaffolding contractor will need to gain access through the upper car park high level timber slats to erect the scaffold to the rear of the building.

    We would like the owners of cars parked in bays 21, 22, 23 & 24 to park your vehicles in different bays to your allocated car parking bays this will be for Thursday 22nd only and once the scaffold is in place you can park your cars back in your own bays, the car parking control company will be informed of this.

    During the works the scaffolding contractors will be on site between the hours of 8:00am and 4:00pm, for Health and Safety reasons please be aware of this when entering and exiting the car park.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient with each other whilst the works are being carried out.

     

    19th November 2012 – External Decorating Works

    As you are aware a Walton & Allen decorating contractor has been working on the external elevations of Lexington Place building over the last few weeks.

    Starting on Monday 19th November 2012 they will be working on the Barker Gate elevation of the building and will be painting the windows and patio doors.

    This means we will require you leaving the windows and patio doors slightly open so they can produce a neat finish.

    If you have a patio door with a metal balustrading panel in front could you please move any furniture or fittings from the front of the patio doors so we can open them to gain access to paint the inside face of the metal panels.

    These works will take place between the hours of 8:00am and 6:00pm and during this period the scaffolding area will be secure as there will be our operatives in place who will be restricting access to any unauthorised personnel.

    If your windows and patio doors have already been completed please ignore this notice.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient and help our contractors whilst the works are being carried out.

     

    9th November 2012

    As you are aware Walton & Allen scaffolding and decorating contractors are working on the Plumptre Street and Bellar Gate external elevations to the Lexington Place building.

    The upper section to Plumptre Street down to the second car park roller shutter is fully complete and the scaffolding has been removed.

    The lower section of Plumptre Street should be finished by the early part of week commencing 12th November and the Bellar Gate elevation during week commencing 19th November.

    The scaffold to both of these elevations will then be removed during week commencing 19th November.

    The scaffolding is now being erected to the rear elevation of the building (Barker Gate) and this will necessitate the need to incorporate scaffold supporting poles being placed through the open sections of the car park roof to support the structure above, if this work is in the vicinity of your vehicle you will be notified by a letter in your mail box and also on your car.  If this is the case could you please park your car in an alternative bay for a short period of time whilst this work is carried out, we would like all tenants to be patient with each other whilst this is being done.

    When the scaffolding is in place the decorators will be starting work, so again, could all tenants that are on the rear elevation make sure that when the works are nearing your apartment that you leave your windows and patio doors slightly open so they can produce a neat finish.

    If you have a patio door with a metal balustrading panel in front could you please move any furniture or fittings from the front of the patio doors so we can open them to gain access to paint the inside face of the metal panels.

    These works will take place between the hours of 8:00am and 6:00pm and during this period the scaffolding area will be secure as there will be our operatives in place who will be restricting access to any unauthorised personnel.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient and help our contractors whilst the works are being carried out.

    5th November 2012 We are aware that the upper car park roller shutter is stuck in the up position. We have instructed our contractor to attend to this problem today.

    3rd November 2012 We have been informed that the fire alarm is going off, we have contacted our emergency contractor to attend.

    24th October 2012 If you have an emergency outside of office hours, please contact 0115 924 3304 and you will be re-directed to our out of hours service.

    23rd October 2012 As you are aware, a Walton & Allen decorating contractor has been working on the external elevations of Lexington Place building over the last few weeks.

    Starting this week w/c Monday 22nd October 2012, they will be working on the lower section of the building and will be painting the windows and patio doors. This means we will require you leaving the windows and patio doors slightly open so they can produce a neat finish.

    If you have a patio door with a metal balustrading panel in front could you please move any furniture or fittings from the front of the patio doors so we can open them to gain access to paint the inside face of the metal panels.

    These works will take place between the hours of 8:00am and 6:00pm and during this period the scaffolding area will be secure as there will be our operatives in place who will be restricting access to any unauthorised personnel.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    Please be patient and help our contractors whilst the works are being carried out.

     

    19th October 2012 Decoration works have almost been completed on the upper blocks, the lower blocks are due to be started next week. Cleaning works to the fascia’s and re-sealing of the window frames will also be started next week.

    9th October 2012 – A member of Walton and Allen Management team is on-site today.

    3rd October 2012 – External Scaffolding Works.

    As you are aware, a Walton & Allen scaffolding contractor has been working on the Lexington Place building. Starting from the 6th October 2012 they will be working on Saturdays from approximately 8:00am.

    During these works, please take extra caution when entering and leaving the building as there are Health and Safety issues present. Please be patient with each other whilst the works are being carried out.

    If you have any questions please contact a member of staff at our Head Office on 0115 924 3304.

    28th September 2012 Despite adverse weather conditions, the scaffolding has commenced on the upper elevation of Plumptre Street and will be working its way down towards the Bang & Olufsen store over the next week.

    The actual decorating works are due to start on Monday 1st October and will follow the scaffolding around the building, weather permitting.

    As always, please be aware of the scaffolding and treat it with respect.

    27th September 2012 The roofing contractors are on-site today to look at the issue with water ingress.

    24th September 2012 Following our below comment, we can confirm that the required work on the building is being carried out week commencing 24th September 2012. Please be aware, considerate and patient while this work is being carried out on the building.

    14th September 2012 In the next coming weeks we shall be working on the external decoration of Lexington Place to maintain and preserve the look and feel of the building. These works may last up to 3 months and will involve scaffolding over the building. Further details on this shall be provided in due course.

    13th September 2012 We have posted a letter in everyone’s post box to inform you that essential works to the existing car park lighting scheme will be carried out from today until approximately Friday 21st September. The Wheel Clamping Company will be informed. We ask that you please be patient with each other whilst the works are being carried out.

    4th September 2012 We are aware that the fire alarm continues to sound. The engineers have confirmed that at present there is no fire risk. The alarm is sounding due to a part which needs replacing, which should be installed shortly. We apologise for any disruption caused and thank you for your patience.

    3rd September 2012 Unfortunately there is a problem with the fire alarm panel. Walton and Allen have contacted the engineers who should hopefully be on-site today. We appreciate your patience and co-operation.

    30th August 2012 After much searching we have found the leak that was causing water to ingress into the building on the ground floor. We have attributed this leak to heavy rain fall of late. The issue should be fixed this morning and the area will be cleaned soon after.

    22nd August 2012 If you have any building concerns or issues that you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help

    16th August 2012  As I am sure you are aware, the gate is still out of use. It appears that the person who drove into it has short-circuited some of the boards within. Security will be onsite over tonight.

    8th August 2012 Due to the inconsiderate driving of one individual the gate to the upper building is now severely damaged and the bottom section of the gate will need completely rebuilding.

    Walton and Allen have called in security to carry out a night surveillance as the gate will not be repaired for this evening. We would like to reiterate that when using the gate, patience is required as you should only go through the gate once it is fully open.

    The cost of the extra security and re building of the gate is an expense that the landlords do not need and we ask that If anyone witnessed anything please call the head office on 0115 924 3304.

     

    3rd August 2012 Window cleaning will be carried out through the external building on Wednesday the 8th of August (weather permitting) Please ensure you close all your apartment windows on this day.

    2nd August 2012 A Walton and Allen maintenance engineer is on-site today investigating a small leak in the car park area which is affecting parking space 25.

    19th July 2012 A Fire alarm test will be carried out this morning.

    12th July 2012 Fire action notices have be placed around the building, please take the time to read the notice as they are there for your safety.

    12th July 2012 Please be aware that Fire alarm maintenance is being carried out in the building today. All maintenance should be completed by 3pm.

    6th July 2012 Due to adverse weather conditions please be aware that there will be excess water in certain areas of the building especially in the car parks. Please take extra care when walking through the car park areas, main entrances and where excess water is forming large puddles.

    20th June 2012 Works to the signal issues were carried out yesterday and all issue were resolved. If you are still experiencing signal issues please contact head office 0115 924 3304.

    18th June 2012 Contractors will be on site for most of the day carrying out the communal works to the aerial system. So there will be a disruption to T.V signal. If you have any issues please call the office.

    15th June 2012 Contractors will be on site Monday carrying out works to the aerial system of the building. This will cause a disruption with the T.V signal. Please call the office if you have any queries.

    14th June 2012 Walton and Allen maintenance engineers are on-site today

    12th June 2012 we are aware that the bins haven’t been collected. We are currently in contact with the council to arrange for them to be collected as soon as possible.

    1st June 2012 Walton and Allen contacted the Gate engineers who have been out and repaired the car park roller shutter. The Shutter gate is now in service.

    29th May 2012 Walton and Allen maintenance engineers are on-site today.

    29th May 2012 The roller shutter gates are currently out of service. Walton and Allen have contacted the engineers who will be on-site today.

    21st May 2012 The Walton and Allen Maintenance engineer has been on site all last week carrying out works to the re-painting of the car park. These works will be completed today.

    14th May 2012 A Walton and Allen maintenance engineer is on-site today carrying out re-painting to the car park spaces.

    10th May 2012 Walton and Allen maintenance engineers have been on-site carrying out paint works to the car park gates. We have painted them in special hi-vis paint to prevent people from reversing or driving into them.

    1st May 2012 We have a contractor on site checking maintenance work that has been carried out.

    26th April 2012 Our contractor was called out last night to the fire alarm going off. This was due to someone smoking in the communal areas. We would like to remind residents that smoking is not permitted in the building. Please be aware that if found to be smoking you will receive a fine.

    23rd April 2012 A Walton and Allen maintenance engineer is on-site today putting up fire safety signs and instructions around the building.

    13th April 2012 A Walton and Allen maintenance engineer is on-site today.

    4th April 2012 Brent Weightman Walton and Allen Maintenance manager and Andrew Harvey Walton and Allen property manager are on-site today to carry out a routine site inspection.

    4th April 2012 A Walton and Allen maintenance engineer is due on-site tomorrow

    4th April 2012 A Fire risk assessment will be carried out today.

    27th March 2012 Investigations on the building structure have been completed; a report will be written which will include the results for the building movement. If required further information please contact the office 0115 924 3304.

    23rd March 2012 A fire panel test was carried out today

    22nd March 2012 A fire panel test will be carried out tomorrow between 9am – 11am.

    21st March 2012 On the 22nd March 2012 contractors will be on site and window cleaning will take place for the next few days.

    20th March 2012 A second site visit will be carried out this Thursday.

    16th March 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    14th March 2012 A Second site visit will be carried out next week to look at the building structure and any possible building movement.

    7th March 2012 Security – Please always ensure that you properly close entrance doors behind you and please be aware of letting anyone in and out of the building who does not have any entry keys. If you see anything suspicious or have any concerns then please call head office 0115 924 3304 and in the case of an emergency please contact 999.

    6th March 2012 Walton and Allen and CHG were on-site yesterday further investigating the building.

    5th March 2012 Graham Stevenson form Walton and Allen and Dave Hall from CHG are on-site today to further investigate the integrity of the building and to view apartments where building movement is visible.

    1st March 2012 Walton and Allen are on-site next week with Dave Hall our structual engineer to further investigate the integrity of the building structure.

    Letters have been sent to residents of the building in order to gain access into apartments where visible cracks are showing. It is important for us to gather as much information as we can, so if you have any cracks or signs of building movement please contact the head office on 0115 924 3304 as we would like to arrange a time suitable for you to come and view the apartment.

     

    27th February 2012 An emergency light test carried out on the 6th March 2012.

    23rd February 2012 We have had a number of complaints about noise pollution in the building. Please report to the office if you know any information about this 0115924 3304.

    17th February 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    15th Febraury 2012 The roller shutter is now in service.

    13th February 2012 We are aware of the roller shutter not working correctly, A contracted engineer has been called and will be on-site in due course. We apologise for any inconvenience caused and thank you for your patience. We will endeavour to get the issue resolved.

    9th February 2012 A Walton and Allen maintenance engineer is on-site today carrying out Fire stopping throughout communal areas and riser cupboards. This is to keep the building up to fire regulation standards.

    3rd February 2012 A Walton and Allen maintenance engineer will be on-site today carrying out a monthly emergency light test. There will be no disruptions to individual apartments but communal areas may be without lighting for a short period of time.

    26th January 2012 Brent Weightman and Graham Stevenson are on-site tomorrow carrying out an on-site inspection with Dave Hall from the construction company to check the integrity of the building structure.

    25th January 2012A repair option has been looked into for the damaged floor near the lift. Parts are being sourced and we endeavour to have the repairs done by next week.

    25th January 2012A Walton and Allen maintenance engineer is on-site today carrying out an investigation into repairing the damaged floor near the ground floor lift.

    24th January 2012A Walton and Allen maintenance engineer is on-site today carrying out minor repairs to fire doors. This is to keep the building up to fire regulation standards.

    13th January 2012 If you have any concerns or building issues you would like to discuss or report, Please contact head office on 0115 924 3304 one of our team members will be happy to help.

    13th January 2012 Damage to the wall near the 1st floor lift lobby which was caused by vandalism has been repaired. This is a re-occurring act of vandalism and we ask anyone who knows of any information regarding the person causing this damage to contact the office 0115 924 3304.

    Christmas and New Year office opening times:

    Friday 23rd December 2011: 9am – 12pm

    Christmas Eve – Closed

    Christmas Day – Closed

    Boxing Day – Closed

    27th December 2011 (Bank Holiday) – Closed

    28th– 30th December 2011 – Open – Closing times may vary

    New Year’s Eve – Closed

    New Year’s Day – Closed

    2nd January 2011 (Bank Holiday) – Closed

    3rd January 2011 9 – 5.30pm

    In the case of an emergency during office closing hours; Please call our emergency contact Dave on 07974941533. An emergency matter can be defined as water leaks, gas leaks, foul drainage or critical electrical faults.

    13th December 2011 Lexington building RTM members have been invited to meet with Walton and Allen to discuss current building issues

    6th December 2011 If you are having issues with your TV signal then please contact the Walton and Allen office 0115 924 3304. There have been minor issue with the TV signal receiver which we have had contractors out on-site to repair.

    29th November 2011 Brent Weightman will be on-site on the 30th November 2011 carrying out an on-site inspection. If you have any questions or queries then please find him on-site or call the office and he will be happy to help.

    28th November 2011 We are aware of the on-going problem with the refuse area. Our cleaners are constantly clearing the floor and surrounding areas that are becoming littered however this is a reoccurring issue. We have contractors attending site this week to make alterations to the roller shutter, we believe this will prevent the homeless from gaining access and going through the bins.

    24th November 2011 A Walton and Allen maintenance engineer is on-site today carrying out maintenance updates and re programming of the fobs and fob system for door entry access.

    24th November 2011We have been made aware that people have been entering the building whilst still smoking, this is strictly permitted and if caught carrying out this offence, you will be fined.

    22nd November 2011 A contracted engineer will be onsite in due course to further investigate the issue with the sky dish. A date has not yet been set. However this will give us a second opinion on what is causing the sky dish and weak signal issue.

    17th November 2011 The Sky for the building is currently down. We have engineers on-site to resolve the issue and get the sky repaired as soon as possible. We apologise for any inconvenience and thank you for your patience and co-operation.

    15th November 2011 Walton and Allen would like landlords/occupiers to take note of the following.

    1 – Please ensure you park in your own space. Clamping is in operation in both carparks.

    Please note it is an offence to vandalise/remove clamping signs and anyone caught doing so may be prosecuted. It is criminal damage to vandalise the signs.

    2 – The roller shutter gate to the lower car park has been repaired but still requires further work. Please be careful when entering and leaving the carpark ensuring the shutter is fully openwhen you pass through. Please particularly take note if you are entering in a van or have a roof rack!

    3 – Over the last few weeks there have been a number of security issues within the carpark area. Although we wish the carpark to be secure, Walton and Allen and Lexington Place Management Company can never fully guarantee the security in the carpark. Items left there are done so at their own risk.

    14th November 2011 The lower car park shutter gate is currently out of action, the gate has been opened so car park access is still available. A contractor has been called and will be on-site in due course. We apologise for any inconvenience caused and we thank you for your patience and co-operation.

    11th November 2011 We will be holding a two minutes silence at 11am in respect of Armistice Day. Our answer machine will be turned on at this time so please leave a name and number and we will return your call after the two minutes silence. Apologies for any inconvenience caused.

    10th November 2011 Brent Weightman Property and maintenance manager at Walton and Allen will be conducting a monthly site inspection on the 10th, 18th & 30th November 2011 at around 11am. If you have any questions and queries then please find him on-site or call the office and he will be happy to help.

    10th November 2011 A Walton and Allen maintenance engineer is on-site today carrying out emergency light testing throughout the whole building. There should be no electrical disturbances to the apartments but all communal areas will be without lighting for a short period of time.

    9th November 2011 A Walton and Allen maintenance engineer will be on site next week to carry out a monthly emergency light tests. There will be no disturbances to individual apartments but all communal areas will be without lighting for a short period of time.

    7th November 2011 We are now operating from our new premises:

    Ground Floor, Price House, 37 Stoney Street, Lace Market, Nottingham, NG1 1LS.

    Our email addresses, website address and telephone numbers are the same.

    We would like to thank you for your patience and cooperation whilst we were moving and look forward to continuing our service to you from our new premises.

    26th October 2011 Brent Weightman will be on-site tomorrow at 11am till 12pm, If you have any questions or queries then please find him on site or call the office and we can arrange for you to meet him on-site.

    21st October 2011 The Walton and Allen engineer has finished the repairs on the lift wall. If anybody knows of anything relating to how the wall became damaged, please report to the office.

    20th October 2011 A Walton and Allen maintenance engineer will be on-site to continue and finish the repairs to the wall near the lift.

    20th October 2011 Brent Weightman Property and maintenance manager of Walton and Allan will be onsite on the 27th October 2011 at 11am till 12pm. If you have any questions or queries then please find him on site or call the office and we can arrange for you to meet him on-site.

    18th October 2011 We are aware of the damaged wall next to the lift, we will have an engineer coming out today to start the repairs. If anybody knows of anything relating to how the wall became damaged, please report to the office.

    5th October 2011 The roller shutter is not working our contractor will be on site in the 30 minutes to take a look at this.

    29th September 2011 The roller shutter has now been repaired.

    29th September 2011 The roller shutter for the car park has been reported as down. Our contractor is on site now to take a look.

    27th September 2011 Our contractor has had to turn the water off for the next 90 minutes in order to resolve the problem. Sorry for any problems this may cause.

    27th September 2011 Our onsite cleaning team have found a leak within the pump room. You may experience some change in your water pressure. A contractor is on site and is working to rectify the problem.

     

    26th September 2011 The scaffolding has been inspected and will be taking down in the next few days as the remedial works have now been completed.

    17th September 2011

    Please be advised that on Sunday 18th September at 8am Scaffolders will be arriving on site.  Per the council guidelines this is the best course of action and is for the good of the building, as the roofing is in need of attention with immediate effect. The contractors will be on site for the best part of next week.

    We apologize for inconvenience that this may cause if you have any queries or questions please contact our office.

    9th September 2011 As of Wednesday 14th September 2011 Walton and Allen are happy to announce they will be taking over the management of the building. We would like to take this opportunity to thank Jason King for all his hard work on this development.

    If you have any issues or wish to discuss anything please call the office on 0115 9243304.