Welcome to Brook Court bulletin board for landlords, tenants and agents providing up to date information on building issues.

Meter Readings

To request a meter reading, please fill in the form on your main entrance noticeboard. If your building does not have a noticeboard form, please use the Walton&Allen app or click here to request one via our website.

Refuse Collection

The bins are emptied on Mondays (except Bank Holidays). There are 3 bin stores on-site. If you have larger items that cannot be disposed of in the bins please contact Nottingham City Council on 0115 9155555 to arrange a FREE collection.

Gardening/Landscaping

Our Gardening contractors are on-site fortnightly.

Other information

  • Cleaning – Cleaning of the communal areas is carried out fortnightly on Tuesdays, along with a litter pick of the outside areas. The Bin stores are cleaned and tidied weekly.
  • Fire Alarm Testing – A fire alarm test is carried out every week on a Friday. The testing should last approx. 30 minutes.
  • Anti-social behaviour – If notice any anti-social behaviour please report to Nottingham City Council 0115 915 20 20
  • Out of Hour Emergency Line: In the event of an emergency please call the office on 0115 924 3304/0115 924 1813 the answer phone message will give you the current emergency call out number. Please note if the callout is deemed not to be an emergency or to be the fault of the tenant then you may incur a charge for the callout. 

Notice Board

Keep up-to-date on all of the scheduled and adhoc maintenance at your building.

Caretaker on annual leave

Please be aware that the roaming caretaker is on annual for the w/c 11/09/2017. If you notice anything around your building please report this directly to the office.

Site Visit

Walton&Allen’s Block Management Administrator has attended site and completed a walk around inspection of the communal areas.

Weekly Fire Panel Testing

Please be aware that the weekly fire panel test will now be completed on a Thursday.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and completed the weekly fire panel test.

Gutter Clearance and downpipes

Following our comment below, unfortunately Roger Needle were unable to attend site on the 16th June due to the weather. They have attended site today and completed the works.

Site visit

WALTON&ALLEN’s Property Manager is attending site today and carrying out a walk around inspection of the communal areas

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and completed the weekly fire panel test.

Fire Safety

MWE will be on site over the next couple of days to complete the routine service visit.

Bulky Waste Removal

Spotlight Cleaning services have attended site and removed all the bulky waste from site.

Gutter Clearance and downpipes

Following our comment on 18th May, Roger Needle have confirmed that they will attending  on the 16th June to complete the works.

Site visit

Walton&Allen’s Property Manager has attended site today and completed a walk around inspection of the communal areas.

Roaming Caretaker Service

Please note that the Roaming Caretaker is on annual leave until Thursday 25th May. If you have any issues that you would like to report please contact the office directly.

Gutter Clearance & Down Pipes

Following our comment on the 17th May, the quote received has been instructed. The gutters will be cleared from the ground using a vacuum pole system on a wet day. We are awaiting an attendance date from the contractors.

Gutter Clearance & Down Pipes

A quote has been received for the gutters to be cleared on site via a vacuum pole system. Their quote also includes repairing any down pipes as required.

Emergency Lighting

A member of the Walton&Allen Maintenance team has attended site today and carried out an emergency light test and sweep of the communal areas.

Decorating

Walton&Allen’s Maintenance and Contracts Director has attended site today to check on the decorating works.

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and completed the weekly fire panel test.

Site Visit

Walton&Allen’s Property Manager has attended site and completed a walk around inspection of the communal areas.

Energy Tenders

A new energy tender has been agreed for the building today.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and completed the weekly fire panel test.

Block 18-33 – Intercom

A security contractor will be attending site today to carry out investigation works to the intercom following reports from residents.

Drains

Walton&Allen’s Roaming Caretaker has tried to clear any debris from the drains on site as part of his routine visit.

Gate Service

Total Security Systems are due on site today to carry out a routine service visit to the vehicle and pedestrian gate.

Emergency Light Replacements

Following our comment on February 25th, Walton&Allen’s Property Manager has approved a quote provided by the Maintenance Division for any failed emergency lights to be replaced.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site and carried out an Emergency Light Test in the communal areas.

Wall Damage. Block 18-33

Following our comment on January 10th, Walton&Allen’s Maintenance Director has attended site and met with the contractors who completed the work to the wall.  Any snagging works will be completed within the next two days.

Site Inspection

Walton&Allen’s Property Manager has attended site this morning and carried out a walk around inspection of the communal areas.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Street Light

Following our comment on November 25th, the street light in the car park has been replaced by Amptron Electrical Services.

Fire System Contracts

Walton&Allen’s Property and Estate Director has been in correspondence with a fire contractor today in regards to the fire system contract for the building.

Pest Control Visit

The pest control contractors have attended site and carried out a routine service visit.

Block 1-17 Intercom repair

Walton&Allen’s Property Manager has obtained and approved a quote for the failed intercom to Block 1-17 to be reprogrammed.

We are currently awaiting an attendance date from our contractors.

Gate Service Visit

Total Security Systems have attended site and carried out a routine service visit to the vehicle gate.

Block 66-81 Communal Lights

We are aware that there is currently minimum light in this block. A member of the Walton&Allen Maintenance Team has attended site and has replaced 4 lights so far.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a walk around inspection.

Wall damage Block 18-33

City & Country will be commencing works on Saturday morning (14.01.17) to Block 18-33 following an insurance claim.  It appears that a vehicle had hit the building. The works will include the majority of brick removal and reinstatement.

  • They will have a small generator on site on the Saturday but this will not be in use on Sunday as it would be too noisy for the residents and they do not want to cause any unnecessary disruption.
  • They will need to leave the Acro supports in place just for added strengthening of the wall overnight whilst the mortar sets. This will be enclosed using Heras style fencing to ensure no members of the public can tamper with it.
  • City & Country will return on Sunday 15th to remove the supports, point up the holes and remove the Heras fencing from site on Monday 16th January 2017. .

Please can we ask that you refrain from parking adjacent to this block whilst the works are carried out.

Fire Panel Tests

A Walton&Allen Maintenance operative has attended site today and carried out the weekly fire panel tests.

Salt/Grit within the Communal Areas

We would like to politely remind all residents that the responsibility for salting/gritting the communal areas is the responsibility of the residents. Please note; even if salt/grit has been provided by the management company, Walton&Allen or the management company take no responsibility for salting/gritting the communal areas.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Leak in blocks 1-17 & 50-65

Following our comments in July 2016 members of the Walton&Allen Maintenance Team are on site to carry out remedial works following the successful insurance claim.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Western Power

We are aware that Western Power are currently on site outside block 17-33. These works are for an individual property on site.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Changes to your Christmas and New Year Bin Collections

Please see below a letter from Nottingham City Council advising of any changes to the bin collections at Brook Court.

changes-to-christmas-and-new-year-bin-collection-20162017

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

Street Light

Walton&Allen’s Property Manager has obtained a quote for the missing street light in the car park to be replaced. This quote has been instructed and the lamp will be fitted on receipt.

Communal Windows

Following our comment on the 9th November, Edwards Metal Windows have re-attended site and completed the repairs to the communal windows.

2017 Service Charge Budget

The 2017 budget for Brook Court as been sent to all Leaseholders today.

Site Visit

Walton&Allen’s Property Manager has attended site and carried out a monthly site inspection.

Fixed Wire Test

Amptron Electrical Services are on site today to carry out a fixed wire test.

Communal Windows

Edwards Metal Windows will be attending site today to repair any communal window handles.

We would like to remind residents that the building is a no smoking area and there are designated smoking stations outside each block.

Fire Panel Test

Walton&Allen’s Roaming Caretaker has attended site and carried out the weekly fire panel test.

5 Year Fixed Wire Test

Walton&Allen’s Property Manager has instructed a quote for a fixed wire test to be completed. We are currently awaiting an attendance date from our contractors.

Site Visit

Walton&Allen’s Property Manager and Block Management Administrator have attended site and carried out a walk around inspection.

Block 34-49 Communal Door Window Panel

Edwards Metal Windows have attended site today and replaced the broken window panel of the front door to block 34-49.

Emergency Light Replacements

Walton&Allen’s Property Manager has instructed for the emergency lights to be replaced with LED’s.

 

 

Fire Panel Test

Walton&Allen’s Roaming caretaker has attended site and carried out the weekly fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

New Property Manager

Walton&Allen’s Property & Estate Director has attended site with Walton&Allen’s new property manager to familiarise them with the building.

Gate Service visit

TSS have attended site today to carry out a routine service visit.

Broadband Survey

Map Ground on behalf of BT Open Reach have attended site today to carry out a survey to see if fibre optic broadband can be installed at the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Fire Alarm System

Walton&Allen’s Property and Estate Director and Block Management Administrator attended site this morning and met with PLP Fire and Security to sign off the installation of the new fire system works. They were also trained on how to use the new fire alarm system. The manager from the ‘out of hours’ company was also present.

We would like to thank everyone for their patience whilst the works have been carried out and for allowing access into all the properties.

Bulky Waste

The bulky waste items have been removed from site today.

Fire Alarm System

PLP are returning to site today and working on the new fire system within the communal areas in all blocks.

Fire Alarm System

Following our comment on 22.08.16, PLP are returning to site today to carry out the installation of the new fire system to all apartments in Block 34-49, Block  50-65 and Block   66-81.

Fire Alarm System

Following our comment on 16.07.16, PLP are on site today to carry out the installation of the new fire system to Block 1-17 & 18-33.

image1 image2 image3 image4

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Light Replacement

Amptron will be attending site today to replace 3 lights in Block 1- 17 that had been affected by a leak.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Accounts

Walton&Allen’s Property and Estate Director has been working with the accountants to finalise the accounts for 2015.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

BT Survey

BT are going to be attending site and carrying out free surveys to determine whether it is eligible for free super fast BT broadband upgrades. We are currently awaiting a date that BT will be attending and will updated this page once this information has been received.

Pest Control

The contracted pest controllers have attended site today as part of a routine visit.

Service Charges/Ground Rent

Any Leaseholders that have not made any payments towards Service Charges or Ground Rent, or have not contacted the office, have been sent to Solicitors today in relation to debt collection.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Service Charges – Final Reminders

Walton&Allen’s Credit Controller has sent the Service Charge Final Reminder letters to all leaseholders today.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Leak in blocks 1-17 & 50-65

Following our comment below Walton&Allen’s Block Management Administrator and Maintenance Administrator have attended site and met with an emergency electrician who assessed the communal areas in both blocks. Dehumidifiers have also been placed in the communal areas to help dry the affected areas.

Leak in blocks 1-17 & 50-65

Following the unfortunate event Tuesday (19.07.16) evening where residents experienced leaks with their water tanks Walton&Allen’s Property & Estate Director and Maintenance & Contractors Director have attended site this morning to carry out an initial assessment of the damage. They also instructed a cleaning company to clean the communal carpets of any excess water today.

Fire Alarm System

Following our comment on 19.07.16, Walton&Allen’s Block Management administrator has written to all leaseholders today in relation to arranging access into all apartments for the installation of the new fire system.

Fire Alarm System

Following our comment on 15.07.16, please see the schedule for the installation of the new fire system below:

Monday 22nd August 2016

Block 1-17

Block 18-33

Tuesday 23rd August 2016

Block 34-49

Block  50-65

Block   66-81

Wednesday 24th August 2016

Common area work all blocks

Thursday 25th August 2016

Final inspections all blocks

Service Charge Reminders

The 1st reminders for the Service Charges have been sent to all leaseholders today.

Fire Alarm System

Following our comment on 09.06.16, we have received the schedule for the installation of the new fire system from PLP today.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen’s Maintenance team has attended site today and carried out a fire panel test.

Service Charges

The second half service charges are due today.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Emergency Light Test & Sweep

A member of the WALTON&ALLEN Maintenance Team has attended site today to carry out an emergency light test and sweep.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test today rather than tomorrow when it would normally be tested.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Gate Service

Our gate contractors TSS will be attending site today to carry out the service visit to both the vehicle and pedestrian gate.

Fire Alarm System

Walton&Allen have written to all leaseholders today to inform them that PLP have been awarded the contract for the new fire system installation on site.

Site Visit & Caretaker 1 to 1

Walton&Allen’s Property and Estate Director and Block Management Administrator have attended site today with the Roaming caretaker to carry out a site visit 1 to 1 meeting with the roaming caretaker of the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Emergency Light Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Replacing Panels

Following our comment on 16.05.16, Edwards Metal Windows will be on site today to re-glaze the smashed door panels to the block doors of block 1-17 & block 50-65.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance team has attended site today and carried out an emergency light test and sweep.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site and carried out the weekly fire panel test.

Replacing Panels

Following the unfortunate vandalism, Edwards Metal Windows are due on-site this afternoon to measure up to replace the smashed panels to the block doors of block 1-17 & block 50-65. They are due back on site to replace these panels on Wednesday 25.05.16.

Emergency Light Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the weekly fire panel test.

Advanced Demands – Service Charges

The advanced tenant demands which are due on 01.07.16 have been sent to all leaseholders today.

Vegetation Growth

Following comment on the 27.04.16, Western Power have contacted Walton&Allen to confirm that they have cleared the area around the substation.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Vegetation Growth

Following our comment on 14.04.16, Western Power have attended site and accessing the rear of the substation involves climbing (Which is something their waste contractors do not normally do in the course of their work), this means that there is more planning involved in order to carry out the job, meaning it may take slightly longer the usual to complete.

Communal Carpets

Following our comment on 13.04.16, Walton&Allen’s Property and Estate Director and Block Management Administrator has met ChemDry on site this afternoon to measure up to provide a quote for the cleaning of the communal carpets.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Vegetation Growth

It has been reported to Western Power that there is vegetation growth around the substation. Western Power have confirmed they will attend within the next two weeks to clear the area.

Communal Carpets

A member of the Walton&Allen Block Management team has contacted a cleaning company today to obtain a quote for the cleaning of the carpets in the communal areas.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Site Visit

The Roaming Caretaker has attended site today and carried out the duties for the building. This included cleaning the bin areas and litter picking the communal areas.

BC Before BC After

Site Visit

The Roaming Caretaker has attended site today to carry out the duties for the building. The bin area was tidied and litter-picked and the fencing was also repaired.

BC Before BC After

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out the fire panel test a day early due to our office being shut on Friday 25th March for Good Friday.

Please contact the office in the event of an emergency and the voicemail will supply you with the current out of hours contact number.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Communal Lights

A member of the Walton&Allen maintenance team has attended site today to replace a light that had failed within the communal area of the building.

Fire Panel Test

A member of the WALTON&ALLEN Maintenance Team has attended site today and carried out a fire panel test.

Emergency Light Test & Sweep

A member of the Walton&Allen Maintenance Team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

PLP Fire

PLP Fire will be attending site today to carry out the FEB services.

New Roaming Caretaker

A member of the Walton&Allen Block Management team has attended site today with the new roaming caretaker to carry out a walk around inspection and to familiarise the caretaker with the building. The daily duties to be carried out at the building were also explained on this visit.

 

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Communal Lights Out – approx. 2:20pm

Following a report from a resident, we are aware that all the communal lights in the corridors in block 50-65 have gone out. This has been reported to our engineer who will attend as soon as possible.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site today and carried out a fire panel test.

Site Visit

A member of the Walton&Allen maintenance team has attended site today and litter picked the perimeters.

Email System Back Up & Running

Following our comment below, we can confirm that the Walton&Allen email system is now up and running. We apologise for any inconvenience caused.

Email System Down approx 11:15am

The Walton&Allen email system is currently down until further notice. Our IT providers are currently working to resolve the issue. Please call the office on 0115 924 3304 if your query is urgent.

Annual General Meeting

Following the invites sent on 13.01.16, the annual general meeting was held today. Walton&Allen’s Property and Estate Director has also attended site and met with the freeholder of the building to carry out a walk around inspection.

Silverdale Garden and Tree’s

Following our comment on the 12th January 2016, Silverdale Garden and Tree’s have attended site and carried out the required works.

Fire Panel Test

A member of the Walton&Allen Maintenance Team attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Annual General Meeting Invitations

The invitations for the annual general meeting have been sent to all leaseholders today.

Silverdale Gardens and Tree’s

Silverdale Gardens and Tree’s have been instructed to attend site and cut down trees & shrubs on the embankment at the rear of the property. They will be attending on Monday 8th February 2016.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance Team has attended site and carried out a fire panel test.

 

Fire Panel Test

A member of the Walton & Allen maintenance team has attended site on 29.12.15 & carried out a fire panel test.

Electricity contract

Walton&Allen have carried out a tender for the renewal of the communal electricity contract and renewed on significantly lower prices.

 

 

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site and carried out a fire panel test.

Bulky Waste

City & Country have attended site and removed any bulky items that have been left in the bin areas.

Light Test

A member of the Walton&Allen Maintenance team has attended site and carried out an emergency light test and light bulb sweep of the communal areas.

Salt/Grit

A Walton&Allen operative has attended site today and filled the grit bin(s) on site.

Please note it is responsibility of residents to distribute where necessary.

Fallen Tree. Approx. 9:00am

Walton&Allen’s Trainee Property Manager has met Silverdale Garden and Trees on-site and provided them the access they require in order to dispose of the fallen tree along the boundary that has affected a neighboring property.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen Maintenance team has attended site today and carried out a fire panel test.

Bin Areas

The Caretaker who attends site 7 hours a week has cleared the bin areas of any waste littered across the floor and organised for any scrap metal to be removed.

Bin Area

Site Visit

A member of the Walton&Allen Block Management Team has attended site today and carried out a walk around with the new roaming caretaker.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Light Test

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Lighting

A member of the Walton&Allen maintenance team has attended site today and replaced 5 failed lights in block 18-33.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

NEW APP!

Check out our new free App!

Keep updated as to what’s happening at your building through this Notice Board. The App has many features, including Sat Nav to help people find your building. Whether it be friends, family or delivery companies, all can download the App to their smartphone or tablet – and it’s completely free.

Simply go to www.waltonandallenapp.co.uk and download it.

 

app app2 app3 app4

Emergency Light Test

A member of the Walton&Allen maintenance team has attended site to carry out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site and carried out a fire panel test.

Fire panel test

A member of the Walton&Allen maintenance team has attended site today to carry out a weekly fire panel test.

Service Visit

Our fire contractors PLP are due on site today to carry out service visit.

Fire panel test

A member of the Walton&Allen maintenance team has attended site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a routine fire panel test.

Fire Panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Please contact Walton & Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

Fire panel test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Light Sweep

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site to carry out a fire panel test.

Site Inspection

Walton&Allen’s Property and Estate Director along with our new property manager has attended site and carried out a walk around inspection with the Director and Freeholder of the building.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Fire Panel Test

A member of the Walton&Allen maintenance team has attended site today and carried out a fire panel test.

Fire Panel Tests

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Emergency Light test and Sweep

A member of the Walton&Allen maintenance team has attended site today and carried out an emergency light test and light bulb sweep of the communal areas.

Fire Panel Test

A member of the Walton&Allen maintenance team is due on site today to carry out a fire panel test.

Emergency light test

A member of the Walton&Allen maintenance team has attended site today to carry out an emergency light test and sweep of the communal areas.

Please contact Walton&Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report

Litter pick

A Walton&Allen operative has attended site today and carried out a litter pick of the communal areas and car park.

CleaningGeneral
  • Litter pick - message archive

    8th May 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    1st May 2015 A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    27th April 2015 Approx. 2:00pm – Communal Bins

    We have been informed that the council have returned and emptied the 5 bins they previously missed. We have not been supplied a reason to why they have been missed.

    27th April 2015 Approx. 12:00pm – Communal Bins

    We are aware that 5 of the communal bins have not been emptied today. There is evidence they have been on site and moved the bins but for some reason not emptied them. This has been reported to Nottingham City Council.

    24th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    23rd April 2015 – A member of the W&A maintenance team has attended site today and carried out an emergency light test.

    22nd April 2015 – Fly Tipping.

    A letter has been sent to all the Residents at Brook Court reminding tme to dispose of their rubbish correctly.

    We have 13 bins over three bin stores spread across the site. There is NO EXCUSE for notputting rubbish into the bins and throwing it on the floor of the communal areas and/or bin areas.

    Residents are not permitted to leave pushchairs, bikes etc. in the communal areas. These items are a potential fire risk to the building and will be removed immediately and not stored.

    If residents have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on 0115 915 5555 to arrange a collection or visit.

    20th April 2015 – Our contractors will be relaying the access to the front bin area this week therefore you will not be able to access this bin area during this time.

    17th April 2015 – A member of the W&A maintenance team is due on site today to carry out a Fire Panel Test.

    15th April 2015Gate

    The foundation work for the new gate is starting tomorrow, Thursday 16/04/2015.

    You will still be able to access the front bin area (located next to the gate) this week but please be aware of any works being carried out during this period.

    Week commencing Monday 20/04/2015 – Our contractors will be relaying the access to the front bin area therefore you will not be able to access this bin area during this time.

    Week commencing Monday 27/04/2015 –Our gate contractors will be installing the new sliding gate. Residents will be able to access the front bin area.

    10th April 2015 – A W&A Operative has attended site today and removed any pushchairs and bikes from the communal areas and carried out a litter pick of the car park and communal areas.

    10th April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    7th April 2015 – We are aware the bins have not been emptied today. This has been reported to Nottingham City Council who will return on Wednesday 8th April to empty the bins.

    2nd April 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    20th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    16th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    16th March 2015 – Refuse collection

    We are aware that the 4 of the bins in the far bins store near block 66-81 have not been emptied today. We have contacted Nottingham City Council who will return on Wednesday 18th March to empty the bins.

    The bins was not emptied today due to the amount of over flow rubbish dumped in front of the bins restricting access. If a bin is full please place your rubbish in an alternative bin in another bin store and not on the floor.

    6th March 2015 – A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    3rd March 2015 – Bulky Waste Disposal

    May we remind residents to not abandon large/furniture items in the Courtyard. These items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    27th February 2015 A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    27th February 2015 A member of our W&A Maintenance team is on-site today carrying out an emergency light test.

    25th February 2015 Our fire contractors are due on site today to carry out a routine maintenance service visit.

    23rd February 2015 A member of W&A maintenance team is due on site today to carry out a Fire Panel test.

    20th February 2015 A member of W&A maintenance team is due on-site Monday 23rd February 2015 to carry out a Fire Panel test.

    13th February 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test

    6th February 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    2nd February 2015 – Bulky Waste Disposal

    May we remind residents to not abandon large/furniture items in the Bin areas or car park. These items are a potential fire risk to the building.

    If you have large items to dispose of such as mattresses or electrical items, it is your responsibility to dispose of them and not the management agents. Nottingham City Council offers a FREE weekly bulk waste collection. Please call them on 0115 915 5555 to arrange or visit the website on www.nottinghamcity.gov.uk for more information.

    30th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    28th January 2015 A member of W&A Maintenance team has attended site today and carried out an emergency light test & light bulb sweep.

    16th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    9th January 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    2nd December 2015 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    30th December 2014 A member of W&A Maintenance team is due on-site today to carry out an Emergency light test and light bulb sweep of the communal areas.

     

    23rd December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th December 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test

    5th December 2014 – Litter pick

    A Walton & Allen operative has atteneded site this afternoon and carried out a litter pick around the entire site.

    5th December 2014 – A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

     

    4th December 2014 – Fire alarm repaired

    The following notice has been hand delivered to all residents with a copy of a ‘Fire action notice’ and ‘Fire saftey advice for residents’:

    Following our fire contractors PLP attendance to Brook Court on 1st, 2nd and 3rd of December 2014 to carry out necessary repairs to the fire system we have already received call outs for false alarms.

     

    One of the main reasons this is being caused is from food being burnt (for example) and flats not being ventilated whilst cooking. We recommend residents open a window whilst cooking to allow excess smoke to escape. This also refers to anyone smoking within their apartment. May we remind you that this building is a non-smoking building and there is a designated smoking area outside each block.

     

    When activated the Fire Alarm sets off a sounder within the flat, and residents are unclipping their detector and tampering with the system to stop this. These actions leave all other residents within the building at risk.

     

    From this date forward if any Residents are tampering with the devices we are enforcing a£1000 fine. If we get called out to flat multiple times because of continual misuse and false alarms from cooking/smoking we are enforcing a £300 fine.

     

    The fire system allows us to locate which individual flats have tampered with the device. The fine will initially be sent to the leaseholder of the property and they hold the right to pass this on to their tenant to pay.

     

    Please note that breaking the ‘Break glass’ does not clear the history of interference on the system. Therefore we can still trace which flat has tampered with their system and fine them accordingly.

    2nd December 2014 W&A’s Block Manager & Maintenance Manager met a gate contractor on-site this morning to look at the final design for the upcoming gate installation.

    1st December 2014 – Fire alarm repairs

    Our contractors PLP will be on site for the next 3 days carrying out urgent repairs to the fire alarm. As stated in letters to all leaseholders and tenants they will require access to your apartment throughout one of the days. Please find below their schedule for the 3 days.

    Day 1 – Block 1-17 and 34-49

    Day 2 – In Blocks 66-81 and 18-33 and 50-65

    Day 3 – The communal areas.

    We appreciate your co-operation and patience whilst these works are carried out.

    28th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

     

    24th November 2014 A member of W&A maintenance team attended site today to carry out a Fire Panel test

    14th November 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    7th November 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    31st October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    24th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    20th October 2014 Following our comment below, a member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    17th October 2014 The fire panel test will be carried out on Monday 20th October instead of today.

     

    13th October 2014 A member of W&A Maintenance team is due on-site today to carry out emergency lighting repairs.

    10th October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    10th October 2014 A member of W&A Maintenance team is due on-site today to carry out an emergency light test & light sweep of communal areas.

    3rd October 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

     

    1st October 2014 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

     

    26th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    19th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    12th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    5th September 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    29th August 2014 Walton and Allen operative carried out fire panel tests

    22nd August 2014 W&A’s Block Manager & Maintenance Administrator are on-site this morning.

    22nd August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    21st August 2014 A member of W&A Maintenance team is due on-site today to carry out an emergency light test & light sweep of the communal areas.

     

    15th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    8th August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    6th August 2014 – AGM

    An AGM was held this afternoon. This was a very proactive meeting where some major decisions were made in relation to the future of the complex, including works to the fire system and the main gate. We will be writing to all leaseholders in the near future to outline the decisions made.

    6th August 2014 A member of W&A maintenance team is on-site today investigating the issue with Block 66-81 communal lighting.

    6th August 2014 W&A’s Block Manager & Block Management Administrator have been on-site this morning and carried out a walk around inspection.

    1st August 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

     

    25th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    23rd July 2014 A member of W&A maintenance team is due on-site today to:

    • Carry out an emergency light test & light sweep of the communal areas
    • Fit the fence to the bin store that was delivered yesterday

    23rd July 2014 W&A Block Manager is on-site this morning meeting another Gate contractor.

    18th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    17th July 2014 W&A Block Manager is on-site this morning to meet a gate contractor and carry out a walk around inspection.

    15th July 2014 – The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date, and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please visit www.waltonandallenapp.co.uk or download this app for FREE from the Apple or Google Play Stores.

     

    11th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    7th July 2014 Western Power has been contacted in relation to clearing the substation area of rubbish.

    7th July 2014 Following our comment below, a member of W&A Maintenance team is due on-site today to finish off the work to the loft hatch in Block 18-33.

    4th July 2014 A member of W&A Maintenance team is due on-site today to continue working on the loft hatch in Block 18-33.

     4th July 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    1st July 2014 The second half year (1st July 2014 – 31st December 2014) Service Charge is due today.

     

    30th June 2014 – Gardening/Landscaping

    Our Gardening contractors have attended site today and confirmed that gardening points are in good order. The bushes facing Player Street have been cut back and will be cut again on the next visit.
    The car park weeds were sprayed on 25th June 2014 and will be pulled and scraped on forthcoming visits. All grassy areas are being strimmed as they are very uneven due to the stones and rocks which would damage the mowers blades. Litter is being collected on every visit.

    Litter/Disposing of Rubbish – Our contractors have mentioned that they have witnessed residents not disposing of their rubbish correctly and dumping rubbish bags around the site. May we remind residents to always dispose of their rubbish correctly. This means putting your rubbish bags in the actual bins and not on the bin area floor or around the site and refuse collectors will refuse to dispose of any waste that is not in the actual bins.

     

    27th June 2014 W&A’s fire contractors PLP will be carrying out their contracted maintenance visit on the morning of Saturday 28th June 2014 to test the fire system.

    PLP may carry out random tests within apartments, so we would appreciate it if you would allow them the access they require if they knock on your door.

     

    27th June 2014 A member of W&A maintenance team is due on-site today to:

    • Carry out a Fire Panel test
    • Fit a new fire rated loft hatch to Block 18-33

     

    25th June 2014 Our contracted gardeners have attended site today.

    20th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    16th June 2014 A member of W&A Maintenance team is due on-site today to fix the roof to the cleaners cupboard.

    13th June 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    13th June 2014 A member of W&A Maintenance team is due on-site today to:

    • Re-fix a section of carpet in Block 1
    • Look at the damaged roof to the cleaners cupboard which was unfortunately caused by someone stealing the led.

     

    9th June 2014 – Bulky Items/Waste Disposal

    Our disposal contractor has today removed all abandoned furniture items like mattresses from site. They also tidied up the bin areas due to residents not being able to dispose of their waste correctly.

    May we take this opportunity to again remind residents to dispose of their waste correctly which means placing your rubbish/waste in the actual bins provided. Please do not leave bin bags on the bin area floor as refuse collectors will often refuse to dispose of waste that is not in the actual bins.

    Please do not throw away large items in the bin store as these cause a fire and safety risk. They should be disposed of correctly by taking them to a private waste disposal site or contact Nottingham City Council bulky waste collection service on 0115 915 5555. They will remove some items for FREE. They will only remove these items Free of charge if a resident phones and arranges it. They will not do this for managing agents like ourselves, W&A.

    W&A do not want to keep having to remove these items for residents as it is charging the building money.

     

    30th May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    23rd May 2014 A member of W&A maintenance team is due on-site today to carry out a Fire Panel test.

    15th May 2014 W&A Block Manager is on-site to carry out a site inspection. They also unfortunately had to meet a waste disposal contractor due to Residents incorrectly disposing of waste.

    9th May 2014 The Lock has been replaced on the block 1 fire panel case.

    9th May 2014 Brass facilities are on site to start their landscaping contract. They removed a skip full of garden waste.

    9th May 2014 W&A Block Manager was on site. Please remember that there is azero tolerance on items being stored in the communal area. Any items will be removed without prior notice and will not be stored.

    8th May 2014 A W&A operative is on site to explain door access to the block to a number of residents.

    7th May 2014 Bin Area clean

    W&A have carried out a clean in the bin area and contacted Nottingham City council in regards to several bins which were not collected.

    6th May 2014 – New Gardeners contract agreed

    On Monday 12th May 2014 Brass Facilities will be carrying out a one off landscaping of the site which includes the hiring of a skip. Once this has been completed continuous gardening visits once a fortnight will be carried out to improve the landscape over the next few months including removal of vegetation and litter.

    2nd May 2014 – New Cleaners

    On Monday 12th May, new cleaning contractors will start at the building.

    They will be carrying out the following:

    – Weekly cleans of the bin area

    – Fortnightly cleans of the block

    – Fortnightly litter picks of the car park and outside the blocks

    PLEASE remember cleaners are employed to keep the communal areas clean and not pick up rubbish after residents who cannot remove of items and rubbish appropriately.

    Please note – We the contractors have been instructed to remove any items in the communal area in line with the zero tolerance policy put in place.

    1st May 2014

    Walton and Allen have carried out a clearance of the bin stores. PLEASE be reminded to place all rubbish in the actual bins provided. Please do not throw away large items in the bin store as these cause a fire and safety risk. They should be disposed of correctly by taking them to a private waste disposal site or contact Nottingham City Council bulky waste collection service on 0115 915 5555. They will remove some items for FREE.

    25th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    22nd April 2014 A member of Walton & Allen maintenance team is due on-site today to complete an emergency light test.

    17th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    11th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    4th April 2014 – Disposal of Items in Communal Areas & Litter

    The following letter is being hand delivered to all residents today. Signs have also been placed in each block.

    We have also written to Leaseholders to keep them updated on this situation.

    BROOK COURT

    IMPORTANT NOTICE

    Due to the disregard by a minority of residents today, just a few hours after we cleared the communal areas for your health and safety, Items were again being stored in the communal areas. This is putting the health and safety of all residents at high risk.

    Therefore, this has left Walton and Allen with no other option than to serve every resident with an immediate removal items notice for items being stored anywhere in the communal area including bikes, prams, clothes and rubbish.

    From MONDAY 7TH APRIL 2014 any items found in the communal areas will be:

    IMMEDIATELY REMOVED AND DISPOSED OF. THEY WILL NOT BE STORED.

    Unfortunately a minority of resident’s actions have left us with no other option than to put this procedure in place.

     

    Disposing of litter

    We have witnessed many residents disposing of rubbish incorrectly, throwing rubbish out of windows and dropping cigarette butts on the floor.

    There is more than enough bins at Brook Court. We have 13 bins over three bin stores spread across the site. There is NO EXCUSE for not putting rubbish into the bins and throwing it on the floor of the communal areas and/or bin areas. It is costing the building vital money to carry out repairs and maintenance to continually clean and litter pick the site.

    By carrying out these actions you are adding to the problem. Please take pride in the place you live and place rubbish correctly in the bins.

     

     

    4th April 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    3rd April 2014 – Disposal of Items in Communal Areas

    Following our comment on 20th March 2014, Walton & Allens Block Manager and a member of our maintenance team are on-site today disposing of any items that are still being stored in the communal areas. They will be finishing off the wire mesh along Alfreton Road & carrying out a litter pick of the entire site.

    Following our recent Fire Risk Assessment and in response to actions outlined by Nottinghamshire Fire & Rescue Service, we MUST have all communal areas clear of items such as pushchairs, prams, bikes, plant pots, furniture and rubbish. Residents must find an alternative place for these items to be stored.

    We are doing this for Residents wellbeing as these items are putting their lives at risk. This has been highlighted by the fire brigade. We have had no other option than to use this strategy as previous polite attempts for Residents to store them somewhere else have been ignored.

    If after this date any further items are found in these areas, we will tag them with a 7days notice and if not removed they will disposed of. We will not store the items and they will be thrown away.

     

    1st April 2014 – The all new Walton and Allen app, designed with you in mind.

    This app allows occupants of apartments in blocks Walton and Allen manage, to keep up to date and report maintenance issues or to search for a potential new property.

    It’s simple, easy to use and can be downloaded and installed at a touch of a button.

    To download the app, please scan the barcode located throughout our apartment blocks or visit www.waltonandallenapp.co.uk where you can email or text a link to your phone.

    28th March 2014 Window cleaning contractors returned to site to complete cleaning

    28th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    24th March 2014 Window cleaning carried out by contractors

    20th March 2014 – Disposal of Items in Communal Areas

    The following notice has been hand delivered to ALL residents today and each item stored in communal areas has been tagged with a shorter version of the below notice:

    BROOK COURT – IMPORTANT NOTICE

    Following our recent Fire Risk Assessment and in response to actions outlined by Nottinghamshire Fire & Rescue Service, we MUST have all communal areas clear of items such as pushchairs, prams, bikes, plant pots, furniture and rubbish. You must find an alternative place for these items to be stored.

    Please remove any items you have stored in the communal areas including under the stairs, on window sills and corridors by 10.00am on Thursday 3rd April 2014.

    At 10.00am – We will be removing all items that remain in the communal areas and place them in a rubbish skip which will be located in the car park.

    At 3.00pm – ANY ITEMS STILL IN THE SKIP AT THIS TIME WILL BE DISPOSED OF AND WILL NOT BE STORED.

    Walton & Allen staff will be on-site if any items need to be recovered from the skip between the hours of 10.00am to 3.00pm.

    We are doing this for your wellbeing as these items are putting your lives at risk. This has been highlighted by the fire brigade. We have had no other option than to use this strategy as previous polite attempts for you to store them somewhere else have been ignored.

    If after this date any further items are found in these areas, we will tag them with a 7days notice and if not removed they will disposed of. We will not store the items and they will be thrown away.

     

    14th March 2014 Our Fire Contractors PLP are on-site this morning to complete the pre-booked Fire Risk Assessment.

    14th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    12th March 2014 The following notice has been hand delivered to residents today:

    OUR FIRE CONTRACTORS PLP ARE CARRYING OUT A FIRE RISK ASSESSMENT OF THE BLOCK AND WOULD LIKE ACCESS INTO YOUR PROPERTY TO HELP WITH THE ASSESSMENT

    THEY WILL BE ON SITE ON FRIDAY 14TH MARCH 2014 FROM 9:30AM ONWARDS

    THEY WILL KNOCK ON YOUR DOOR FOR ACCESS AND WILL ONLY BE ON SITE THAT DAY

    WE WOULD APPRECIATE YOUR CO-OPERATION

    10th March 2014 Walton & Allens Block Manager is on-site this afternoon.

    7th March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    3rd March 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    28th February 2014 Walton & Allens Block Manager has visited site this morning.

    27th February 2014 – Bin Areas

    Walton and Allens Block Manager has visited site this afternoon. A non-resident was caught illegally rifling through the bin areas. Although the suspect ran away, the incident was reported to the non-emergency police line.

    If this kind of incident happens again, please report it to the non-emergency police line 101. Once you have been provided an incident number for your call, please inform Walton & Allen on 0115 9243304.

    27th February 2014 – Litter

    A member of Walton & Allen maintenance team is due on-site today to complete a litter pick of the rear bin area.

    21st February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

     

    21st February 2014 – Litter

    A member of Walton & Allen maintenance team is on-site today to fit wire mesh to the Alfreton Road side of the perimeter.

    They will also be returning to site next week to complete a litter pick to the rear bin store area.

     

    20th February 2014 – Litter

    A member of Walton & Allen maintenance team is on-site this afternoon to complete a litter pick of the site.

     

    19th February 2014 – Western Power

    Yesterday 18/02/2014, the underground cable which supplies the electrics to apartment 3, 7, 11 & 16 was damaged. Western Power has confirmed that it is their responsibility to repair this.

    Western Power carried out a temporary repair at 9:20pm last night which was within 2 hours of the report.

    To get peoples electricity back on, they have had to temporally disconnect the storage heaters in these 4 flats. To complete the repair they need to dig up part of the car park but unfortunately some residents cars are in the way. Western Power have put notices on these cars and if they are not removed by the end of today they will be informing the police to remove them.

    Please move your car to another area in the car park if you have a notice from Western Power on your car.

    Once the cars have been removed, they will dig a hole to carry out the repair which will mean all storage heaters will be able to be turned back on and within a couple of days, once they know the issue is fully rectified, they will make good the hole.

    If your car parking space is affected, please use one of the 3 spaces directly in front of the warehouse.  Please be patient while Western Power rectify this issue.

    For more information, you can always contact Western Power on 0800 056 8090 and quote the incident number 240250/E.

     

    19th February 2014 – Litter

    Following our comment below, a member of Walton & Allen maintenance team is returning to site today to complete fitting the wire mesh along Player Street.

    18th February 2014 – Litter

    A member of Walton & Allen maintenance team has been on-site this afternoon fitting wire mesh to the bottom of the metal fence along Player Street.

    This will reduce the amount of litter that is being blown through from Player Street onto Brook Court.

    We will return to site to complete this job once we have more wire mesh and once this this job has been fully completed we will return to site to carry out a complete litter pick of the site.

     

    11th February 2014 A member of Walton & Allens maintenance team is on-site today to carry out emergency light repairs.

    10th February 2014 Walton & Allens Block Manager & Block Administrator have visited site this afternoon.

    7th February 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    4th February 2014 A member of Walton & Allen maintenance team is due on-site today to complete an emergency light test.

    31st January 2014 A member of Walton & Allen maintenance team is due on-site on Monday to carry out a Fire Panel test.

    30th January 2014 Walton & Allens Property Manager is on-site this morning to carry out a walk around inspection.

    24th January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a litter pick of the far bin area.

    24th January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    20th January 2014 A member of Walton & Allen maintenance team is due on-site today to fit a new Lock to fire panel in block 50 – 65.

    16th January 2014 A member of Walton & Allen maintenance team is due on-site today to complete a litter pick on the Player Street side of the building.

    9th January 2014 A member a Walton & Allen maintenance team will be on-site today and tomorrow to complete a thorough litter pick of the site.

    9th January 2014 A member of Walton & Allen maintenance team is due on-site today to fix the loft hatch in Block 18-33.

    7th January 2014 Walton & Allens Property Manager is on-site this afternoon to carry out a walk around inspection.

    7th January 2014 A member of Walton & Allen maintenance team is due on-site today to complete a light sweep of the communal areas along with a litter pick in the bin area.

    light sweep & litter pick in the bin area

    3rd January 2014 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    30th December 2013 – Grit Bins

    Walton & Allen have installed x2 Grit Bins which are located in the car park. These Grit Bins are for residents use only.

    23rd December 2013 On Friday 27th December 2013, A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    23rd December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    20th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    13th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    10th December 2013 Walton & Allens Property Manager is on-site this morning to carry out a walk around inspection.

    Brook – Prop manager due on-site this morning to complete walk around inspection.

    6th December 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    2nd December 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    29th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    22nd November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test and remove a mattress from the bin area. If there is enough time, they will also complete an emergency light test, if not they will complete this on Monday.

    15th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a Fire Panel test.

    8th November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    7th November 2013 A member of Walton & Allen maintenance team is on-site this afternoon to clear & tidy up the bin area.

    5th November 2013 A member of Walton & Allen maintenance team is due on-site today to fix a loose handrail to the stairs.

    4th November 2013 A member of Walton & Allen is due on-site today to complete a light sweep.

    1st November 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test & replace a light on the ground floor.

    30th October 2013 Walton & Allens Property Manager is due on-site today to carry out a walk around inspection.

    22nd October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out an emergency light test.

    14th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    14th October 2013 Unfortunately there was an accident this morning resulting in a lamp post at the far end of the brook court site being knocked over. We have reported this to the Nottingham City Council who are in the process of fixing this.

    11th October 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    4th October 2013 A member of Walton & Allen maintenance team is due on-site today to carry out a fire panel test.

    1st October 2013 We are in the process of pricing up lockable cupboards to cover the fire panels and new doors and locks to the meter rooms.

    25th September 2013 approx. 3:50pm – Refuse Collection

    Following our comments below, Nottingham City Council have advised that they plan to empty the bins in the other two bin areas (located at the far end facing the gate & to the RHS of the gate) later this afternoon.

    24th September 2013 approx. 2:50pm – Refuse Collection

    The bins have been emptied in the bin area located to the LHS next to the gate. Unfortunately they did not empty the other bin areas which are now overflowing. We have contacted Nottingham City Council to request if they can also empty these bins so that ALL bins are empty and we can ‘start from scratch’.

    24th September 2013 approx. 12:45pm – Refuse Collection

    We are aware that the refuse collectors have been refusing to empty the bins (located on the LHS next to the gate) as apparently they cannot access to the bin area due to the amount of rubbish bags on the floor. A member of Walton & Allen maintenance team is on-site today to clear the bags from the bin area floor and distribute them into the bins in the other two bin areas (located at the far end facing the gate & to the RHS of the gate) as those are being emptied. We have contacted Nottingham City Council and requested for these bins to be emptied now the floor is clear.

     

    11th September 2013Block 1 – 17 Flooring

    Following our comment on the 9th September 2013, our contractor is still on-site replacing the flooring in the communal corridors in this block. A member of Walton and Allen maintenance team is also on-site to fix nosing to the stairs.

     

    10th September 2013 – Important Notice

    Please DO NOT hang any items particularly clothes on the pipes leading to your boiler.

    Failure to do so may cause significant leaks in the building.

    Please check your plumbing for any signs of leaks.

    Thank you for your co-operation.

    9th September 2013 – Block 1 – 17 Flooring

    The flooring in being replaced in the communal corridors in Block 1 – 17 following the leak. A contractor is on-site today. Please do not walk on the concrete screed within an hour of it being done. Then on the 10/09/2013 & 11/09/2013 the flooring can be replaced.

    2nd September 2013 Please contact Walton and Allen on 0115 924 3304 if you have any building concerns or issues that you would like to discuss or report.

    21st August 2013 Following the leak in Block 1-17, the flooring can now be replaced in the communal corridors. This will commence on 09/09/2013. Please do not walk on the concrete screed within an hour of it being done. Then on the 10/09/2013 & 11/09/2013 the flooring can be replaced.

    21st August 2013  A member of Walton & Allen maintenance team is on-site today clearing the bin store area and clearing the litter from the landscape areas.

    20th August 2013 a member of Walton & Allen maintenance team is due on-site today to carry out an emergency lighting test.

    2nd August 2013 Our gardening/landscaping contractors are due on-site today.

    31st July 2013 Following our comment on 22nd July 2013, our gardening/landscaping contractors are due on-site today.

    30th July 2013 A defective lock on one of the block entrance doors has been rectified today.

    26th July 2013 A member of Walton & Allen maintenance team is due on-site today to repair the leaking sprinkler in Block 18-33.

    24th July 2013 A member of Walton and Allen maintenance team is on-site today to clear the bin area.

    23rd July 2013 A gate engineer has attended site today to look at solutions for the gates. A quote will follow.

    22nd July 2013 Gardening will commence on 31st July 2013 and 2nd August 2013. The final day will be w/c 5th August 2013.

    19th July 2013 All gutters and fascias were cleaned of plants, grass and debris. This should reduce overflowing rain water down the brick work of each building causing damp to some apartments.

    17th July 2013 We have instructed a gate specialist to inspect the entrance gates with a view to producing some sustainable solutions. Please watch this space.

    17th July 2013 Landscape gardeners have been instructed to clear the site. We anticipate that the annual contract will be put in place shortly, subject to collection of funds.

    The landscapers will also be clearing all gutters of leaves and plants etc. so that they do not overflow and cause damp issues as has been the case.

     

    11th July 2013 A member of Walton and Allen maintenance team is on-site today continuing with decoration of the communal areas of Block 1 – 17 following the leak.

    8th July 2013 A member of Walton and Allen maintenance team is on-site today decorating the communal areas of Block 1 – 17 following the leak.

    8th July 2013 A member of Walton and Allen maintenance team is on-site today repairing communal down pipes which are causing damp issues in apartments.

    2nd July 2013 – Brook Court Block 1-17 Leak

    As planned, on Tuesday 25th June 2013 our electrician undertook a visual inspection of the fixed electrical installations and did not find any obvious cause for concern. However, he recommends a full test of the electrical installations within each property to fully assess the condition.  Walton & Allen has liaised with the building insurer and they have confirmed that the cost of the report itself and remedial work relating to damage caused by the flood will be covered by the building insurance policy.

    For Lessee’s that have already given Walton & Allen written authority to undertake this work, we will organise access with residents and undertake this work.

    For those who have not, you will need to do one of two things – either:

    1)give Walton & Allen written authority to undertake the work on your behalf, Or;

    2)organise this work yourself and make your own claim against the building insurer.

    The building insurer (Aviva) has been notified and has appointed Cunningham & Lindsey as their chosen loss adjuster. A visual inspectionby the loss adjuster was undertaken on Tuesday 25th June 2013 on flats and communal areas (overseen by Walton & Allen) to assess any qualifying damage for insurance purposes.  No obvious major concerns were noted.

    Following work undertaken on the electrical installations within the Communal Areas, the building itself was deemed to have been put back into a habitable condition from that Tuesday afternoon. However, it still remains the responsibility of individual Lessees to undertake their own assessment on the condition of their property and to satisfy themselves that their flat is now in a habitable condition and complies with all relevant health & safety requirements.

    In terms of how matters will progress with the building insurance claim following the visit by the loss adjuster on 25th June, a schedule of damage is currently being agreed upon with the building insurer.  Once this has been agreed and costing’s provided, the insurer will confirm what works they can approve to be undertaken.   Walton & Allen will be able to update lessees shortly in relation to what damage has been noted and agreed by the insurance company in relation to their individual property.

    Since the Communal areas suffered the most damage, work here will begin shortly.

     

    21st June 2013

    Following our comment below, contractors are working hard to bring the building back into a habitable state following the flooding incident in Block 1 – 17 on the evening of the 19th June 2013.

    Access into each flat is required on Tuesday 25th June 2013. Please contact Walton and Allen immediately on 0115 924 3304 in order to arrange access.

    Should you have difficulties with arranging alternative accommodation, please contact the Emergency Planning Team on 0115 9155 555 or visit your local housing office.

     

    20th June 2013

    You may now be aware that there was a flooding incident at Brook Court in Block 1 – 17 on the evening of the 19th June 2013. A large leak had developed within an apartment flooding the apartment itself and causing significant water damage to both other apartments and the communal areas.

    Due to this damage the local authority have deemed the building un-inhabitable at this present time.

    Should you have difficulties with arranging alternative accommodation, please contact the Emergency Planning Team on 0115 9155 555 or visit your local housing office.

    The situation is being managed by Walton and Allen and if you are a tenant, lessee or managing agent and have not yet been in contact with us, we urge you to so as soon as possible by phoning 0115 924 3304.

    In order to resolve the issues quickly and effectively it is important for us to work together.

     

    17th June 2013 AB Fire Protection are due on-site today to carry out their 6 monthly Fire Alarm Test.

     

    1st June 2013 We are pleased to confirm that as of today’s date, we are now the managing agents for this block, replacing Country Wide.

    We are aware that there are a host of matters that need attending to and these shall be tackled in turn, subject to priority and your service charge funds being received from Leaseholders.

    Please keep an eye on this bulletin board for further updates and if you have any constructive comments, then please email them to us on info@waltonandallen.co.uk.

     

    1st May 2013 We are pleased to announce that as from 1st June 2013 Walton and Allen will take over the management of the block from Countrywide. Please refer to this bulletin Board for further updates.