Site Visit

W&A’s Roaming Caretaker has attended site today as part of their scheduled monthly visit and carried out the following items mainly picked up from the Property Managers prior site visit:

  • Returned Light LO2 to working order in Block 2-4 by changing the bulb
  • Checked Light EM08 in Block 5-13 and confirmed failed fitting which replacement to LED will be quoted for
  • Replaced a bulb in the light by the mailboxes in Block 14-22
  • Resolved the displaced coping stone at the end of the drive
  • Cleaned the cobwebs around the external lights under the archway

 

 

Site Visit

Walton & Allen’s Property Manager has attended site today and carried out a walk around inspection of the communal areas including carrying out the monthly emergency light, smoke detector and RCD tests.

Coppice Park

Gardening

The contracted Gardeners were not due on-site last week as part of their agreed contracted scheduled visits. However unfortunately the visit the week before was cancelled due to staff sickness.

The contracted Gardeners have attended site today and their visit report is provided below as per usual. Unfortunately the ride on mower they use broke down during the visit so they continued to mow the grass using a pedestrian mulch mower which is why some grass cuttings were left on-site.

The grass cuttings will soon disperse and Horizon will continue to use the ride on mower once fixed where the grass cuttings will be collected as per usual.

Horizon also intend to cut the leylandii hedge next week.

You can find the list of works carried out here: Gardening works carried out 04.09.18

 

Site Visit

Walton & Allen’s Property Manager and Trainee Property Manager have attended site this morning and met some of the Directors on-site to discuss various points along with meeting Lanes Group regarding the surface water drains and Joe Uk Ltd regarding the vehicle gate.

Coppice Park

Site Visit

W&A’s Roaming Caretaker has attended site today as part of their usual monthly routine and carried out the below:

 

  • Block 2-4 – Replaced the bulb and starter in light LO2, noted on W&A’s site visit last week, returning it to working order
  • Block 2-4 – Re-secure the door lock to the electricity cupboard, noted on W&A’s site visit last week, returning this door to secure locking order
  • Block 5-13 – Replaced the bulb and starter in light EM07, returning it to working order
  • Block 5-13 – Cleaned out the light cover to light LO4

Bin Store Redecoration

Following our comment below, J.W Woodward & Son Painter and Decorators have attended site today as planned and completed the decoration to the bin store both externally and internally. Due to the lovely weather, the job was completed today with no need for attendance tomorrow.

Bin Store Redecoration

Following our comment on 19.07.18, J.W Woodward & Son Painter and Decorators have informed us that they shall be attending site Friday 03.08.18 to decorate the bin store. Woodward’s have been instructed to paint both the internal and external sides of the bin store which will not only refresh the bin store aesthetically but will also protect the wood. Depending on the time it takes for the paint to dry, Woodward’s may need to re-attend site Saturday 04.08.18 to finish the job.

Bin Store Repair

A member of W&A Maintenance team has attended site today to carry out a required bin store repair prior to the decoration commencing tomorrow.

Site Visit

Walton & Allen’s Property Manager has attended site today and carried out a walk around inspection of the communal areas including carrying out the monthly emergency light, smoke detector and RCD tests.

Bin Store Repair

A member of W&A Maintenance team has attended site today with the intention of carrying out a bin store repair prior to the decoration. However there was further damage caused to the post than originally expected so a return visit and further quote is required which W&A will correspond with the Directors about.