Lower Block Lift Repair

Following our comment on 05.02.16, the Management Companies Directors have approved the required major repair of the drive unit, therefore we have instructed Kone to go ahead with replacing and upgrading the lift drive unit. The ETA for this part is approx. 5 days so depending on delivery, realistically we are looking at next week for the repair to be carried out as an lift technician is required for this repair, rather than an engineer.